8.8 Outline information required for <strong>SuDS</strong> evaluation<br />

8.8.1<br />

The information required at Outline <strong>Design</strong> The Outline <strong>SuDS</strong> <strong>Design</strong> will show what the<br />

stage will depend on whether a Concept scheme will look like, how it will function and<br />

<strong>Design</strong> has been provided and the level of confirm any additional information provided<br />

information included at that stage.<br />

since Concept <strong>Design</strong> Stage.<br />

The design information should be provided in<br />

plan form, confirming site layout and <strong>SuDS</strong><br />

infrastructure together with a <strong>SuDS</strong> <strong>Design</strong><br />

Statement presenting all information that<br />

cannot be conveyed on plan.<br />

Outline <strong>Design</strong><br />

8.8.2 Outline <strong>Design</strong> – information checklist<br />

Information recommended in the LASOO (Local<br />

Authority <strong>SuDS</strong> Officer Organisation) Practical Guidance<br />

■■<br />

Flood Risk Assessment (FRA) – a review<br />

■■<br />

ground investigation review<br />

of critical elements<br />

■■<br />

evidence of third party agreement for<br />

■■<br />

■■<br />

Outline <strong>Design</strong> Strategy Statement<br />

Outline <strong>Design</strong> Plan – layout<br />

consent to discharge or agreement in<br />

principle.<br />

64<br />

■■<br />

the plan will incorporate preliminary<br />

landscape proposals<br />

Additional information to inform evaluation of the scheme:<br />

■■<br />

topographical information and flow route<br />

■■<br />

sensitive receptors for runoff where<br />

analysis<br />

appropriate e.g. SSSIs<br />

■■<br />

destination and discharge route of rainfall<br />

■■<br />

offsite works that may be required<br />

via infiltration or runoff<br />

■■<br />

general maintenance principles<br />

■■<br />

infiltration investigation results where<br />

appropriate<br />

■■<br />

design life of any products used and<br />

requirements for potential replacement.<br />

■■<br />

existing utilities plan confirming existing<br />

watercourses or sewer locations<br />

London Borough of <strong>Hillingdon</strong> <strong>SuDS</strong> D & E <strong>Guide</strong><br />

© 2018 McCloy Consulting & Robert Bray Associates

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!