02.03.2018 Views

Hillingdon SuDS Design & Evaluation Guide

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Modifi<br />

Step 2 – Modified Flow Route analysis<br />

The modified flow route analysis is the basis<br />

for low flow conveyance through the site,<br />

overflow arrangements and exceedance<br />

routes when design criteria are exceeded.<br />

key<br />

Proposed hard surfaces<br />

Proposed soft surfaces<br />

Once the modified flow routes have<br />

demonstrated that Proposed runoff trees can flow<br />

predictably through the site, the arrangement<br />

Proposed contours<br />

of runoff collection, source control, site<br />

control, regional Surface control, flow conveyance, storage<br />

and final release from site can be designed.<br />

Roof runoff<br />

Modified Modified flow routes Flow Route<br />

Concept <strong>Design</strong><br />

Holyo<br />

Modifie<br />

key<br />

Propo<br />

Propo<br />

Propo<br />

Propo<br />

Surfac<br />

30<br />

Roof ru<br />

Proposed<br />

discharge to<br />

existing ditch<br />

Modified Flow Route Analysis for Holyoakes School, Robert Bray Associates.<br />

London Borough of <strong>Hillingdon</strong> <strong>SuDS</strong> D & E <strong>Guide</strong><br />

© 2018 McCloy Consulting & Robert Bray Associates

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!