30.07.2018 Views

2002 Replacement Parts Catalog

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S/QRC and G-2 Snubbing BOPs<br />

The Cameron S/QRC and G-2 snubbing blowout preventers are used in well workover<br />

and servicing operations. S/QRCs are ram-type preventers which maintain pressure<br />

control for all types of workover wells. The Cameron G-2 BOP is suitable for wells requiring<br />

a 4-1/16” 5000 or 10,000 psi WP or 7-1/16” 5000 psi WP snubbing preventer.<br />

S/QRC and G-2 Rams<br />

Cameron S/QRC and G-2 snubbing BOPs can be equipped with the proper rams to<br />

perform a full range of snubbing preventer operations.<br />

Four types of ram bodies are available for the 4-1/16” 10,000, 15,000 and 25,000 psi<br />

S/QRC and 4-1/16” 5000 and 10,000 psi G-2 BOPs. These include blind, pipe, shear<br />

and wireline rams. Pipe rams can be fitted with safety packers, wear insert packers<br />

or slip inserts. Blind and pipe rams are available for all sizes.<br />

Features include:<br />

• Safety packers seal around tubing in the well bore. Tubing can be stripped or<br />

snubbed through these packers, if necessary.<br />

• Wear insert packers are for stripping and snubbing service. These subassemblies<br />

have a wear insert which can be easily replaced to renew the packer.<br />

• Slip inserts are used to hold the tubing string after shearing or during workover<br />

operations by supporting upward and downward forces as well as tortional<br />

forces.<br />

• Wireline ram guides have hardened steel guiding surfaces and are replaceable.<br />

• No special operating system is required for shearing.<br />

• All S/QRC and G-2 rams are suited for H 2 S service per NACE MR-01-75.<br />

TC1001 120 © <strong>2002</strong> Cooper Cameron, Cameron Division

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!