30.07.2018 Views

2002 Replacement Parts Catalog

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TL BOP RamLock Operating Piston Subassembly<br />

18-3/4” 5000 and 10,000 psi WP<br />

Item Qty/5K Qty/10K Description<br />

1 1 1 Secondary Piston<br />

*2 1 1 Seal Ring<br />

3 4 4 Whistle Piston<br />

4 4 4 Sealing Shoulder Screw<br />

*5 4 4 O-Ring<br />

6 1 1 Main Piston<br />

7 4 4 Lock Component (Main Piston with Keys and Screws)<br />

8 8 8 Alignment Key (Main Piston)<br />

*9 8 8 Socket Head Cap Screw<br />

10 1 1 Piston Front Plate<br />

*11 1 1 O-Ring (Front Plate)<br />

12 16 16 Socket Head Cap Screw (Front Plate-to-Main Piston)<br />

13 1 1 Rod Connection<br />

(*)**14 1 1 Adhesive (Loctite 242 50cc Bottle)<br />

*15 8 8 Socket Head Set Screw (Half Dog Rod-to-Front Plate) Optional<br />

16 1 1 Button for Operating Piston (Connecting Rod)<br />

17 2 2 Pipe-Threaded Hex Socket Plug (Front Plate)<br />

18 1 1 Front Plate Stinger<br />

*19 4 4 Seal Ring (Three-Function Stinger)<br />

*21 1 1 Pip Ring<br />

**22 1 1 Thread Sealant<br />

25 1 1 Sleeve, Secondary Piston, Hydraulic Ram (Inside Item 6)<br />

*26 1 1 Wear Ring (for Secondary Piston Sleeve)<br />

27 1 1 Stop Plate, Secondary Piston (Inside Item 6)<br />

28 12 12 Screw, Socket Head Cap<br />

*29 1 1 Pip Ring (Secondary Piston)<br />

*30 1 1 Seal Ring (Secondary Piston)<br />

* Included in Seal Kit<br />

** Not Shown<br />

Item numbers shown in the catalog may or may not correspond to the item numbers shown in your rig<br />

books.<br />

TC1001 91 © <strong>2002</strong> Cooper Cameron, Cameron Division

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!