2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
15<br />
Freese and Nichols<br />
Elm Fork Athletic Complex<br />
Dallas, Texas<br />
The City of Dallas is redevelop<strong>in</strong>g a capped municipal landfill to create a new<br />
recreational facility. The 160-acre Elm Fork Athletic Complex features championship-caliber<br />
soccer fields and also <strong>in</strong>cludes picnic areas, playgrounds, trails, and<br />
re-established natural vegetation. The city contracted Freese and Nichols to create<br />
the master plan for the complex, which <strong>in</strong>corporates susta<strong>in</strong>able design concepts<br />
such as stormwater quality, ra<strong>in</strong>water harvest<strong>in</strong>g, wastewater recycl<strong>in</strong>g, and the<br />
use of recycled material for construction.<br />
Freese and Nichols used AutoCAD ® and<br />
<strong>Autodesk</strong> ® 3ds Max ® software to create<br />
near-photorealistic render<strong>in</strong>gs of this large,<br />
complicated facility—help<strong>in</strong>g its client visualize<br />
the complex prior to construction and<br />
support<strong>in</strong>g public outreach efforts. The<br />
firm created a terra<strong>in</strong> model of most of<br />
the site us<strong>in</strong>g AutoCAD software.<br />
The team then used 3ds Max—<strong>in</strong><br />
comb<strong>in</strong>ation with other render<strong>in</strong>g<br />
and image design tools—to produce<br />
lifelike images of the model from<br />
various vantage po<strong>in</strong>ts around<br />
the park.<br />
Golder Associates<br />
M1 Managed Motorways<br />
United K<strong>in</strong>gdom<br />
England’s Highways Agency is implement<strong>in</strong>g a Managed Motorway Program for<br />
sections of very congested roads, <strong>in</strong>clud<strong>in</strong>g the M1 motorway. The program uses<br />
active traffic management to improve traffic flows—<strong>in</strong>troduc<strong>in</strong>g reduced speed<br />
limits and hard shoulder runn<strong>in</strong>g at busy times. Golder Associates was commissioned<br />
to develop an accurate 3D model and an animated visualization to illustrate<br />
and communicate upgrades to a section of the M1. The proposed plan <strong>in</strong>cluded the<br />
addition of CCTV poles, emergency pull-outs, and overhead gantries with traffic<br />
flow signs.<br />
Golder used AutoCAD ® , AutoCAD ® Civil<br />
3D ® , and <strong>Autodesk</strong> ® 3ds Max ® Design to<br />
create the model and a c<strong>in</strong>ematic-quality<br />
animation from the model data, help<strong>in</strong>g the<br />
team more accurately assess and suggest<br />
improvements to the proposed motorway<br />
upgrades. The firm comb<strong>in</strong>ed survey data<br />
of exist<strong>in</strong>g structures, design data for the<br />
proposed overhead gantries and CCTV<br />
poles, and 3D road data to develop the<br />
project model. The team also modeled<br />
approximately 30 exist<strong>in</strong>g bridge<br />
structures, as well as nearby build<strong>in</strong>gs<br />
that affected visibility. The model was<br />
also used to predict that the driver’s<br />
sign sight l<strong>in</strong>es were unobstructed<br />
and that each of the CCTV poles had<br />
adequate views of the road.<br />
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
<strong>Infrastructure</strong><br />
16