17.12.2012 Views

2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...

2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...

2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />

<strong>Awards</strong><br />

625<br />

SC Engenharia<br />

Bela Vista Kle<strong>in</strong>gers W<strong>in</strong>d Farm & Associates<br />

Imaruí, Santa Catar<strong>in</strong>a, Brazil<br />

The Ohio River Trail is a multi-use trail <strong>in</strong> eastern C<strong>in</strong>c<strong>in</strong>nati and part of the<br />

In southern 320-mile Brazil, Ohio RDS to Solutions Erie Trail that has spans developed the state the of Ohio, 60-megawatt follow<strong>in</strong>g former Bela Vista w<strong>in</strong>d<br />

farm <strong>in</strong> Imaruí, railroad Santa and canal Catar<strong>in</strong>a. corridors. The The mounta<strong>in</strong>ous City of C<strong>in</strong>c<strong>in</strong>nati terra<strong>in</strong> contracted and high Kle<strong>in</strong>gers slopes & of Bela Vista<br />

were selected Associates to maximize to provide the plann<strong>in</strong>g efficiency and design of the services project’s for a 30 1.23-mile w<strong>in</strong>d portion turb<strong>in</strong>es. of Consult<strong>in</strong>g<br />

firm SC Engenharia the trail. The (Eng<strong>in</strong>eer<strong>in</strong>g) firm relied on a model-based assisted <strong>in</strong> workflow the project’s to help design. quickly identify<br />

economic, ecological, and constructability issues.<br />

SC Engenharia AutoCAD® used Map AutoCAD 3D, AutoCAD® Civil 3D®, detailed surveys. Aerial photography overlaid<br />

and <strong>Autodesk</strong>® 3ds Max® Design helped the on parcel and DEM data helped<br />

team <strong>in</strong>tegrate GIS data sets and various de- project stakeholders appraise alignment<br />

sign scenarios <strong>in</strong>to more realistic render<strong>in</strong>gs options and impacts to adjacent properties.<br />

that better conveyed the scope and impact of A dynamic corridor model that adapted to<br />

the project. Kle<strong>in</strong>gers & Associates used GIS alignment changes was used to automatically<br />

data to create a more realistic base map of update reta<strong>in</strong><strong>in</strong>g walls based on criteria-<br />

the area, help<strong>in</strong>g to save its client the cost of driven subassemblies. Rendered scenes from<br />

this corridor model were cont<strong>in</strong>ually updated<br />

to quickly create compell<strong>in</strong>g presentation<br />

materials throughout the design process.<br />

® Civil 3D ®<br />

and <strong>Autodesk</strong> ® 3ds Max ® the site’s natural spr<strong>in</strong>gs, water-<br />

Design software courses, and exist<strong>in</strong>g build<strong>in</strong>gs. This<br />

to optimize the site design and m<strong>in</strong>imize approach helped the designers m<strong>in</strong>imize<br />

the environmental impact of the devel- the extent of roads and balance cut/<br />

opment and its 13-kilometer access road, fill volumes. The team also found the<br />

which must accommodate trucks carry<strong>in</strong>g 3D model of the exist<strong>in</strong>g terra<strong>in</strong> es-<br />

40-meter turb<strong>in</strong>e blades. The team used sential for help<strong>in</strong>g to determ<strong>in</strong>e suitable<br />

a model-based design approach to more locations for, and position<strong>in</strong>g of, the<br />

quickly develop and analyze a series of <strong>in</strong>dividual w<strong>in</strong>d turb<strong>in</strong>es. Additionally,<br />

design options for the site layout and the team was able to use the design<br />

access road—vary<strong>in</strong>g the road alignment model throughout the design process<br />

and adjust<strong>in</strong>g design parameters, while to develop project render<strong>in</strong>gs and<br />

simultaneously assist<strong>in</strong>g the team <strong>in</strong> avoid<strong>in</strong>g animations to enhance communication<br />

and support the approval process.<br />

Parsons Br<strong>in</strong>ckerhoff<br />

San Francisco-Oakland Hatch Mott Bay MacDonald<br />

Bridge<br />

California<br />

The City of Lake City, Florida contracted Hatch Mott MacDonald to design<br />

The San Francisco-Oakland a new 3 million gallons Bay per Bridge day wastewater handles treatment approximately facility. The 300,000 facility is cars a day<br />

and a million located each <strong>in</strong> an week. environmentally It is the transportation sensitive area that and is prone commerce to s<strong>in</strong>kholes backbone and of the<br />

San Francisco the City Bay requested area and the the site entire have balanced state depends cut and fill, on and this m<strong>in</strong>imum bridge impervi- for goods and<br />

services movement ous surfaces between to reduce the its amount northern of storm and southern water treatment extremes. needed The on site. 75-year old<br />

eastern span of the bridge is be<strong>in</strong>g replaced with a new seismically advanced struc-<br />

Hatch Mott MacDonald used AutoCAD® mak<strong>in</strong>g. The headworks structure <strong>in</strong> particular<br />

ture slated Civil to 3D®, open <strong>Autodesk</strong>® <strong>in</strong> 2013. Revit® To MEP, enhance and project was very visualization, complicated and a Parsons precise 3D model Br<strong>in</strong>ckerhoff<br />

has developed <strong>Autodesk</strong>® an Revit® <strong>in</strong>tegrated Structure model to help design and dataset helped the for team the develop new an bridge, <strong>in</strong>tricate rebar the exist<strong>in</strong>g<br />

bridge and a plant context, that could and achieve the very surround<strong>in</strong>g high levels of communities scheme while m<strong>in</strong>imiz<strong>in</strong>g and environment.<br />

spatial conflicts.<br />

treatment <strong>in</strong> an energy efficient manner. The Hatch Mott MacDonald relied on a dynamic<br />

firm created <strong>in</strong>telligent 3D models of all the site model for earthwork calculations and<br />

Parsons Br<strong>in</strong>ckerhoff is us<strong>in</strong>g AutoCAD<br />

structures, enabl<strong>in</strong>g improved visualization analyses to help balance the site. This model<br />

of the site and facility for better decision- was also <strong>in</strong>strumental <strong>in</strong> help<strong>in</strong>g to determ<strong>in</strong>e<br />

the necessary depth for the yard pip<strong>in</strong>g and<br />

m<strong>in</strong>imiz<strong>in</strong>g the depth of the pump stations to<br />

help reduce project costs.<br />

®<br />

Civil 3D ® , <strong>Autodesk</strong> ® 3ds Max ® Design,<br />

<strong>Autodesk</strong> ® Navisworks ® Simulate, <strong>Autodesk</strong><br />

® Navisworks ® Manage, and <strong>Autodesk</strong><br />

® design alternatives that were used to<br />

create near-photorealistic images of<br />

the future bridge design options and<br />

computer-generated animations that<br />

Revit products to generate more helped the public experience driv<strong>in</strong>g<br />

realistic project visualizations that help over the future bridge. Currently, the<br />

communicate design decisions, construc- bridge is under construction and the<br />

tion activities, and detours/traffic shifts to firm is us<strong>in</strong>g model <strong>in</strong>tegration, 4D<br />

stakeholders and team members. Initially, model<strong>in</strong>g, and clash detection to support<br />

the firm built 3D models of the various construction plann<strong>in</strong>g and schedul<strong>in</strong>g.<br />

<strong>2012</strong> <strong>Excellence</strong> <strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong> <strong>in</strong> <strong>Infrastructure</strong><br />

<strong>Infrastructure</strong> <strong>Awards</strong> 6<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!