2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
43<br />
Atk<strong>in</strong>s & Skanska Balfour Beatty Jo<strong>in</strong>t Venture<br />
M25 DBFO, Junction 29-30, Section 4C<br />
Greater London, England<br />
The M25 Design-Build-F<strong>in</strong>ance-Operate (DBFO) project was awarded to Connect<br />
Plus—a consortium of Skanska, Balfour Beatty, Atk<strong>in</strong>s, and Egis Road Operation<br />
UK—to widen sections of the M25 highway circl<strong>in</strong>g London and to operate and<br />
ma<strong>in</strong>ta<strong>in</strong> the road for 30 years. The northeastern quadrant of the M25 has <strong>in</strong>volved<br />
widen<strong>in</strong>g 17 miles of the motorway between junctions 27 to 30, with the last section<br />
of the project featur<strong>in</strong>g a complicated railway cross<strong>in</strong>g.<br />
The design-build jo<strong>in</strong>t venture of Atk<strong>in</strong>s,<br />
Skanska, and Balfour Beatty used<br />
AutoCAD ® , AutoCAD ® Civil 3D ® ,<br />
<strong>Autodesk</strong> ® Navisworks ® Manage, and<br />
<strong>Autodesk</strong> ® Navisworks ® Freedom software<br />
to help meet an aggressive design-build<br />
schedule.The team used design <strong>in</strong>formation<br />
comb<strong>in</strong>ed with exist<strong>in</strong>g draw<strong>in</strong>gs and<br />
laser-scanned data of exist<strong>in</strong>g conditions<br />
<strong>in</strong>clud<strong>in</strong>g structures, utilities, and topography<br />
to create more accurate, <strong>in</strong>tegrated 3D<br />
project models. These multi-discipl<strong>in</strong>e<br />
models were used dur<strong>in</strong>g design and<br />
construction for communication, clash<br />
detection, visualization, design review,<br />
and plann<strong>in</strong>g. In addition, the models<br />
helped project stakeholders and the<br />
general public better understand the<br />
project before construction. The models<br />
were also l<strong>in</strong>ked with the project’s<br />
document management system and<br />
helped on site eng<strong>in</strong>eer<strong>in</strong>g and<br />
construction personnel visualize up-todate<br />
project <strong>in</strong>formation when assess<strong>in</strong>g<br />
how best to perform construction tasks.<br />
Thank you and Congratulations!<br />
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong>