2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
39<br />
Dewberry<br />
Noman Cole Water Reuse Project<br />
Fairfax County, Virg<strong>in</strong>ia<br />
Fairfax County is reus<strong>in</strong>g treated wastewater after <strong>in</strong>stall<strong>in</strong>g a new reclaimed<br />
water distribution system for its Noman Cole Pollution Control Plant. This green<br />
project uses reclaimed water from the exist<strong>in</strong>g plant for irrigation of local<br />
parks and for cool<strong>in</strong>g purposes at a local waste-to-energy facility. Dewberry<br />
was responsible for the eng<strong>in</strong>eer<strong>in</strong>g design of pump stations, elevated water<br />
tanks, and approximately five miles of large diameter (12" to 30") pipel<strong>in</strong>e<br />
through an urban corridor.<br />
Dewberry used AutoCAD ® Map 3D,<br />
<strong>Autodesk</strong> ® <strong>Infrastructure</strong> Modeler,<br />
AutoCAD ® Civil 3D ® , and <strong>Autodesk</strong> ®<br />
3ds Max ® Design software for efficient<br />
design and plans production. The alignment<br />
of the pipel<strong>in</strong>e follows major<br />
highways, crosses multiple waterways,<br />
passes under railroad and <strong>in</strong>terstate<br />
highway bridges, and follows complex<br />
terra<strong>in</strong> profiles. As a design-build<br />
job, Dewberry’s use of a dynamic<br />
model environment helped the firm<br />
quickly develop deliverables to meet<br />
accelerated design, plan approval, and<br />
construction schedules. Model<strong>in</strong>g the<br />
entire alignment <strong>in</strong> context helped<br />
the design-build team construct<br />
the project without a s<strong>in</strong>gle utility<br />
conflict. Visual representations of the<br />
model helped the team and the client<br />
better understand and evaluate the<br />
design for more <strong>in</strong>formed decision<br />
mak<strong>in</strong>g and more efficient construction.<br />
Freese and Nichols<br />
Clearfork Ma<strong>in</strong> Street Bridge<br />
Fort Worth, Texas<br />
The City of Fort Worth is build<strong>in</strong>g a new roadway and bridge over the Tr<strong>in</strong>ity River,<br />
<strong>in</strong> a planned mixed-use development area that also <strong>in</strong>cludes pedestrian trails and<br />
flood control levees. The bridge is 550 feet long with a center span of 220 feet and<br />
will carry two lanes of traffic <strong>in</strong> each direction us<strong>in</strong>g a unique system of precast<br />
concrete beam segments spliced together with post-tensioned steel strands,<br />
creat<strong>in</strong>g a streaml<strong>in</strong>ed cont<strong>in</strong>uous structure for much less cost than typical steel<br />
bridges. The project also features a separate pedestrian bridge suspended below<br />
the vehicular bridge, featur<strong>in</strong>g river overlooks and ramps that <strong>in</strong>tersect with<br />
trails on both sides of the river.<br />
<strong>Autodesk</strong> ® 3ds Max ® software helped<br />
Freese and Nichols develop an aesthetically<br />
pleas<strong>in</strong>g and cost-effective design<br />
that successfully addresses floodway<br />
requirements and provides pedestrian<br />
l<strong>in</strong>kages. The firm created models for<br />
several design iterations and generated<br />
digital render<strong>in</strong>gs from those models<br />
for client review. The models were also<br />
used for shadow studies, help<strong>in</strong>g the<br />
designers see how the structure’s<br />
shadows could affect foliage growth<br />
on the bridge embankments <strong>in</strong> order<br />
to help address susta<strong>in</strong>ability concerns.<br />
Render<strong>in</strong>gs also helped educate local<br />
community and bus<strong>in</strong>ess stakeholders<br />
about the project and planned<br />
construction.<br />
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
<strong>Infrastructure</strong><br />
40