2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
2012 Excellence in Infrastructure Awards - Autodesk Excellence in ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
29<br />
Hatch Mott MacDonald<br />
Total Water Management Plan (TWMP) Pipel<strong>in</strong>e Project – Segment 4<br />
Jacksonville, Florida<br />
The TWMP Pipel<strong>in</strong>e Project <strong>in</strong>volves the construction of a water transmission<br />
pipel<strong>in</strong>e between the two major water grids of Jacksonville Electric Authority<br />
(JEA). The pipel<strong>in</strong>e will transport excess water supply from the north to the<br />
south side of JEA’s service area to better meet <strong>in</strong>creased potable water demand.<br />
This project also promotes conservation of the Floridan Aquifer by lessen<strong>in</strong>g<br />
water resource withdrawal demand from JEA’s southern raw water wells. Hatch<br />
Mott MacDonald is provid<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g services for Segment 4 of the<br />
pipel<strong>in</strong>e, which consists of 30-<strong>in</strong>ch pipe routed along exist<strong>in</strong>g roads and 24-<strong>in</strong>ch<br />
pipe under a major state highway.<br />
Hatch Mott McDonald used AutoCAD ®<br />
Civil 3D ® software to facilitate the<br />
creation of plans and profiles show<strong>in</strong>g the<br />
exact vertical position of the pipel<strong>in</strong>e and<br />
exist<strong>in</strong>g utility cross<strong>in</strong>gs. This helped the<br />
firm design around the exist<strong>in</strong>g utilities,<br />
avoid<strong>in</strong>g their removal and re<strong>in</strong>stallation<br />
and therefore m<strong>in</strong>imiz<strong>in</strong>g service<br />
disruptions to nearby bus<strong>in</strong>esses and<br />
residences. A model-based design<br />
approach enabled clearance check<strong>in</strong>g<br />
and helped guide the contractor on<br />
precise position<strong>in</strong>g dur<strong>in</strong>g construction.<br />
In addition, the firm used the pipel<strong>in</strong>e<br />
model to help identify areas where<br />
hand digg<strong>in</strong>g <strong>in</strong> the root zones of<br />
exist<strong>in</strong>g trees was needed to protect<br />
the trees.<br />
Parsons Br<strong>in</strong>ckerhoff<br />
New Haven Harbor Cross<strong>in</strong>g Corridor Improvement Program<br />
New Haven, Connecticut<br />
The I-95 New Haven Harbor Cross<strong>in</strong>g Corridor Improvement Program is a multimodal<br />
transportation project that features public transit enhancements and<br />
roadway improvements along 7.2 miles of I-95 <strong>in</strong> New Haven, Connecticut. The<br />
Program <strong>in</strong>cludes the replacement of the exist<strong>in</strong>g I-95 cross<strong>in</strong>g over New Haven<br />
Harbor with a new ten-lane extradosed signature bridge—the Pearl Harbor<br />
Memorial Bridge.<br />
As part of program management for<br />
the project, Parsons Br<strong>in</strong>ckerhoff used<br />
AutoCAD ® Civil 3D ® , <strong>Autodesk</strong> ® 3ds Max ®<br />
Design, <strong>Autodesk</strong> ® Navisworks ® Simulate,<br />
and <strong>Autodesk</strong> ® Navisworks ® Manage<br />
software to develop models for more realistic<br />
stakeholder communication, technical<br />
analysis and illustration, and visualization<br />
of construction stag<strong>in</strong>g and schedul<strong>in</strong>g.<br />
Render<strong>in</strong>gs and animations produced from<br />
3D models were used to show stakeholders<br />
the ultimate plan and vision for the<br />
project when completed.<br />
By l<strong>in</strong>k<strong>in</strong>g the 3D models to project<br />
schedules, the team was able to use<br />
4D model<strong>in</strong>g to illustrate complex<br />
construction stag<strong>in</strong>g of the entire<br />
corridor. The 4D model was also<br />
used to help validate and illustrate<br />
the many traffic shifts, detours, and<br />
associated road closures that will be<br />
part of the construction process,<br />
and to support the plann<strong>in</strong>g and<br />
communication of proposed construction<br />
activities and equipment logistics for<br />
many of the structures on the project.<br />
<strong>2012</strong> <strong>Excellence</strong> <strong>in</strong> <strong>Infrastructure</strong><br />
<strong>Infrastructure</strong><br />
30