02.08.2019 Views

Capital Project Report Summer 2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONSTRUCTION<br />

75%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

FALL<br />

<strong>2019</strong><br />

Latitude<br />

Formerly Tercero Dining<br />

Commons 2<br />

PROJECT COST<br />

$34M<br />

CLIENT<br />

The large exterior windows of this new, 30,000 square foot<br />

building will illuminate multiple international food platforms<br />

and two floors of indoor seating at the Tercero housing<br />

district’s second dining commons. The facility also includes<br />

seating for 500, a full commercial kitchen, retail grab-n-go<br />

convenience options and multiple outdoor dining patios.<br />

Structural framing taking shape.<br />

View of dining balcony featuring cross-laminated timber roofing.<br />

Student Housing<br />

and Dining Services<br />

DESIGN TEAM<br />

Bridging: SCB<br />

Design: HED<br />

CONTRACTOR<br />

OTTO<br />

16 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!