CONSTRUCTION<br />
5%<br />
COMPLETE<br />
COMPLETION<br />
DATE<br />
WINTER<br />
2020<br />
PROJECT COST<br />
$2.9M<br />
Silo North Re-roof and<br />
Seismic Improvements<br />
Originally built in 1909 as a dairy barn, the Silo was one of the first buildings erected at on<br />
campus. In 1965 it was converted to a snack bar and recreation center. Today the Silo primarily<br />
functions as home for an informal lounge, study and dining spaces as well as multiple eateries<br />
including Spokes Grill, Crêpe Bistro, The Gunrock and Peet’s Coffee.<br />
While the main focus of this project provides improvements needed for the Silo to comply with<br />
UC Seismic Safety Policy, the work also includes adding a new roof, correcing multiple structural<br />
deficiencies, improving ADA accessibility features and completing a variety of other minor renovations.<br />
Plan showing the Silo area affected by the construction.<br />
CLIENT<br />
Student Housing and<br />
Dining Services<br />
Student Affairs<br />
DESIGN TEAM<br />
HMR Architects<br />
CONTRACTOR<br />
J-Walt Construction<br />