Capital Project Report Summer 2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DESIGN<br />
75%<br />
COMPLETE<br />
COMPLETION<br />
DATE<br />
SPRING<br />
2022<br />
Teaching and<br />
Learning Complex<br />
PROJECT COST<br />
$86M<br />
With the completion of this complex, UC Davis gains a hub for student instruction and informal<br />
gathering plus the capacity needed to educate our growing student population.<br />
This state-of-the-art, three-story, 101,663 gross square foot facility includes space for approximately<br />
2,000 students throughout its 20+ modern lecture and interactive learning spaces, and multiple<br />
indoor and outdoor group study areas. In addition, many of the thoughtfully designed classrooms<br />
will feature high-tech display technologies and facilitate research on multiple teaching styles.<br />
CLIENT<br />
University Registrar<br />
DESIGN TEAM<br />
SmithGroup<br />
CONTRACTOR<br />
DPR Construction<br />
Artist’s rendering of the interior lobby of the Teaching and Learning Complex.<br />
34 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 35