Capital Project Report Summer 2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CONSTRUCTION<br />
55%<br />
COMPLETE<br />
COMPLETION<br />
DATE<br />
WINTER<br />
2020<br />
Center for Quantum Mathematics<br />
and Physics and Seismic Retrofit<br />
of Physical Sciences Library<br />
How does the universe work? Interior renovations of the Physical Sciences Library’s second<br />
and third floors will facilitate the answer to this, and other questions, by creating innovative<br />
collaboration spaces for QMAP faculty, researchers, postdocs, students, staff and visitors.<br />
In addition to creating a destination for the world’s best physicists and mathematicians, this<br />
project also includes multiple seismic and accessibility improvements to the Physical<br />
Sciences Library itself.<br />
PROJECT COST<br />
$15.9M<br />
CLIENT<br />
College of Letters<br />
and Science<br />
DESIGN TEAM<br />
RMW<br />
CONTRACTOR<br />
BHM<br />
New floor plan showing offices at the perimeter of the building.<br />
24 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 25