02.08.2019 Views

Capital Project Report Summer 2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONSTRUCTION<br />

55%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

WINTER<br />

2020<br />

Center for Quantum Mathematics<br />

and Physics and Seismic Retrofit<br />

of Physical Sciences Library<br />

How does the universe work? Interior renovations of the Physical Sciences Library’s second<br />

and third floors will facilitate the answer to this, and other questions, by creating innovative<br />

collaboration spaces for QMAP faculty, researchers, postdocs, students, staff and visitors.<br />

In addition to creating a destination for the world’s best physicists and mathematicians, this<br />

project also includes multiple seismic and accessibility improvements to the Physical<br />

Sciences Library itself.<br />

PROJECT COST<br />

$15.9M<br />

CLIENT<br />

College of Letters<br />

and Science<br />

DESIGN TEAM<br />

RMW<br />

CONTRACTOR<br />

BHM<br />

New floor plan showing offices at the perimeter of the building.<br />

24 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!