CONSTRUCTION<br />

100%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

WINTER<br />

<strong>2019</strong><br />

Activities and Recreation<br />

PROJECT COST<br />

$15.7M<br />

Center (ARC) Expansion<br />

Since the ARC opened in 2004, our student population has increased by 6,000. To meet these<br />

growing needs, the ARC is expanding by 16,300 SF into the existing central courtyard area. The<br />

expansion provides more space for strength and cardio equipment, adds an outdoor exercise<br />

area, enlarges the cycling studio, upgrades the locker rooms, includes the addition of day<br />

lockers throughout the facility, enhances the Wi-Fi and improves the building’s energy efficiency.<br />

This addition will result in shorter wait times, allowing ARC members to complete their workouts<br />

and return to class, studying or work.<br />

This project is funded from a student initiative passed in 1999 to build the ARC which was<br />

designed to allow for the building to be operated, maintained and renovated as it aged and will<br />

not result in any student fee increases.<br />

Activities and Recreation Center main lobby.<br />

CLIENT<br />

Campus Recreation<br />

DESIGN TEAM<br />

HOK<br />

CONTRACTOR<br />

The Boldt Company<br />