Capital Project Report Summer 2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DESIGN<br />
20%<br />
COMPLETE<br />
COMPLETION<br />
DATE<br />
SPRING<br />
2022<br />
Engineering Student<br />
Design Center<br />
The new Engineering Student Design Center will transform how engineering students learn<br />
design and turn their ideas into reality! The space includes areas to accommodate instruction,<br />
student-client collaboration, rapid prototyping, machining, welding and everything in between.<br />
When complete the facility will strengthen UC Davis’ position as a world leader in engineering<br />
design education and showcase the rich environment this university provides for students<br />
across all our engineering programs as well as those participating in our nationally recognized<br />
engineering competition teams.<br />
Rendering of the inside of the Engineering Student Design Center where<br />
students have space for collaboration and rapid prototyping.<br />
PROJECT COST<br />
$21M<br />
CLIENT<br />
College of<br />
Engineering<br />
DESIGN TEAM<br />
Flad Architects<br />
CONTRACTOR<br />
To Be Determined<br />
56 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 57