DESIGN<br />

20%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

SPRING<br />

2022<br />

Engineering Student<br />

Design Center<br />

The new Engineering Student Design Center will transform how engineering students learn<br />

design and turn their ideas into reality! The space includes areas to accommodate instruction,<br />

student-client collaboration, rapid prototyping, machining, welding and everything in between.<br />

When complete the facility will strengthen UC Davis’ position as a world leader in engineering<br />

design education and showcase the rich environment this university provides for students<br />

across all our engineering programs as well as those participating in our nationally recognized<br />

engineering competition teams.<br />

Rendering of the inside of the Engineering Student Design Center where<br />

students have space for collaboration and rapid prototyping.<br />

PROJECT COST<br />

$21M<br />

CLIENT<br />

College of<br />

Engineering<br />

DESIGN TEAM<br />

Flad Architects<br />

CONTRACTOR<br />

To Be Determined<br />

56 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 57