CONSTRUCTION<br />
35%<br />
COMPLETE<br />
COMPLETION<br />
DATE<br />
SPRING<br />
2020<br />
PROJECT COST<br />
$34.5M<br />
Chemistry Seismic and<br />
Life Safety Corrections<br />
To provide increased protection and accessibility for students, employees and the public,<br />
these buildings are being renovated to improve their seismic and fire safety in conjunction with<br />
the construction of multiple ADA improvements. The seismic strengthening includes foundation<br />
upgrades, concrete bracing and polymer-reinforced columns; fire safety developments include<br />
new fire department connections, fire sprinklers, sprinkler piping and upgrades to the fire alarm<br />
systems; and accessibility improvements include new sloped walkways, accessible restrooms,<br />
drinking fountains and eyewash/showers.<br />
CLIENT<br />
College of Letters<br />
and Science<br />
DESIGN TEAM<br />
Multiple<br />
CONTRACTOR<br />
Multiple<br />
Exterior before construction.<br />
6 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 7