Capital Project Report Summer 2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONSTRUCTION<br />

35%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

SPRING<br />

2020<br />

PROJECT COST<br />

$34.5M<br />

Chemistry Seismic and<br />

Life Safety Corrections<br />

To provide increased protection and accessibility for students, employees and the public,<br />

these buildings are being renovated to improve their seismic and fire safety in conjunction with<br />

the construction of multiple ADA improvements. The seismic strengthening includes foundation<br />

upgrades, concrete bracing and polymer-reinforced columns; fire safety developments include<br />

new fire department connections, fire sprinklers, sprinkler piping and upgrades to the fire alarm<br />

systems; and accessibility improvements include new sloped walkways, accessible restrooms,<br />

drinking fountains and eyewash/showers.<br />

CLIENT<br />

College of Letters<br />

and Science<br />

DESIGN TEAM<br />

Multiple<br />

CONTRACTOR<br />

Multiple<br />

Exterior before construction.<br />

6 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 7