02.08.2019 Views

Capital Project Report Summer 2019

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DESIGN<br />

100%<br />

COMPLETE<br />

COMPLETION<br />

DATE<br />

WINTER<br />

2020<br />

PROJECT COST<br />

$23M<br />

Briggs Hall Roof and<br />

Electrical Renovations<br />

Briggs Hall, home to dozens of research groups and labs, opened in 1971 – almost 50 years<br />

ago – to accommodate major increases of students and faculty studying and researching the<br />

biological sciences. Today the roof and electrical systems need major renovations to protect<br />

critical research and academic equipment.<br />

This project removes all the electrical equipment currently on the roof, relocates updated systems<br />

to a fenced yard near the building’s loading dock, replaces the roofing systems and provides a<br />

new emergency generator system to power the entire building during an outage.<br />

CLIENT<br />

Campus<br />

DESIGN TEAM<br />

HY Architects and<br />

Syska Hennessey<br />

CONTRACTOR<br />

To Be Determined<br />

During inclement weather, the labs in Briggs Hall are subject to costly, difficult-to-track leaks when<br />

water seeps in through cracks that develop at the bases of the electrical equipment.<br />

32 UC Davis Design and Construction Management <strong>Project</strong> Update - <strong>Summer</strong> <strong>2019</strong> 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!