PROJECT COST<br />
$23M<br />
Briggs Hall Roof and<br />
Electrical Renovations<br />
Briggs Hall, home to dozens of research groups and labs, opened in 1971 – almost 50 years<br />
ago – to accommodate major increases of students and faculty studying and researching the<br />
biological sciences. Today the roof and electrical systems need major renovations to protect<br />
critical research and academic equipment.<br />
This project removes all the electrical equipment currently on the roof, relocates updated systems<br />
to a fenced yard near the building’s loading dock, replaces the roofing systems and provides a<br />
new emergency generator system to power the entire building during an outage.<br />
CLIENT<br />
Campus<br />
DESIGN TEAM<br />
HY Architects and<br />
Syska Hennessey<br />
CONTRACTOR<br />
To Be Determined<br />
During inclement weather, the labs in Briggs Hall are subject to costly, difficult-to-track leaks when<br />
water seeps in through cracks that develop at the bases of the electrical equipment.<br />