28.04.2021 Views

MAIN MAG ON BOARD SPRING 21

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ADVERTORIAL

REFIT EXCELLENCE

Strategically located on the Tuscan coast, NCA Refit has

a long history of providing industry leading refit services

NCA Refit boasts a highly skilled team

in the activities of refitting and

repair of superyachts, megayachts

and sailing yachts, plus it combines a range

of premium services reserved for crew during

these refit projects.

Over the past 70 years, the company has built

a strong reputation for project management

with the assistance of skilled engineers,

architects and technicians to deliver high

levels of planning and project execution.

To back the up the technical prowess within

the company, the experienced administrative

support offered to the customer covers all

of your needs such as insurances, advice

on border and customs issues and legal

assistance. The team are on hand to advice

and handle yacht or crew issues if and

when they arise.

The NCA Refit internal audit team will also

guarantee competitiveness with the best

quality/price ratio while respecting the

founding values of the business namely,

transparency, and project delivery on time

and in budget.

The facility also provides a fully dedicated

concierge department that takes very

good care of all the guests’ needs to make

their stay as enjoyable and comfortable

as possible.

Due to the unique port infrastructure in

one of the Mediterranean’s most important

naval hubs, the yard is able to host yachts up

to 180 metres in length. The overall facility

covers around 100,000 square metres

of operations, 200 metres of private dry

docks, a floating dock for yachts up to

90 metres.

At the moment, thanks to well structured

investments carried out by The Italian Sea

Group - NCA Refit, the site’s facilities are

being expanded in order to increase their

on-site hospitality and production capacity.

Thanks to this progressive planning, hardstanding

spaces will be trebled starting

from July 2021 and a second dry dock

(146l x 26w x 7.5d metres) will be finished

in October 2021.

A team of over 45 employees, including

engineers, interior architects and technical

staff, is able to provide a complete and

detailed check-up of the yacht, give clear

40 | SPRING 2021 | ONBOARD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!