1.3.47 Of the 146 commercial units surveyed in 2019, only 8 were vacant. This included a large retail unit on the Main Street<br />

(formerly O’Crualaoi butchers) and a property under renovation.<br />

1.3.48 A total of 4 residential units were identified as being vacant. Of these, 2 were the subject of a planning application for<br />

conversion to commercial use adjoining Supervalu (Barry Collins) and the remaining 2 were a pair of 2-storey semidetached<br />

residential units.<br />

1.3.49 To strengthen the retail service in the town this Plan considers that the best approach is to focus future expansion close<br />

to the main street. The Plan has designated a large area of backlands to the west of the Main Street as Town Centre (CL-<br />

T-01) which incorporates part of the existing retail core and this remains undeveloped. This Plan will seek to provide<br />

an urban design framework to guide the desired urban structure of any future town centre expansion in this<br />

area including the use of perimeter blocks, provision of additional small medium sized retail units, identifying access<br />

points and specifying building heights. Further town centre enhancement measures will be delivered on completion<br />

of the western relief road, which has been commissioned, which should focus on providing a more pedestrian friendly<br />

streetscape within the inclusion of a new community focused public space at the heart of the town, wider pavements,<br />

rationalized on‐street parking and a more coherent approach to signage, shop fronts and utilities.<br />

1.3.50 Apart from recent convenience stores (Dunnes Stores and Lidl); there has been little expansion in the retail environment<br />

in parallel with its significant population growth. A greater commercial offering in the town centre will attract locals<br />

inwards to the town centre instead of towards alternative centres such as Douglas. In order to strengthen the core<br />

area and promote increased footfall levels, it is essential that the location of any future significant retail development<br />

consolidates the core and relates positively to the planned inner western relief road.<br />

1.3.51 There are two sites for Town Centre within this Plan. Some regeneration sites have been identified within the town<br />

centre to promote and prioritise the key sites which can fulfil appropriate town centre uses. There are also opportunities<br />

to introduce a new public space as part of the development of the back lands within the CL-T-01 and CL-T-02 sites.<br />

1.3.52 The consolidation and improvement of the town centre of Carrigaline is one of the most important elements of this Plan.<br />

1.3.53 Despite rapid development over recent years, the town retains a strong identity. The expansion of the town centre will<br />

add to the range of shops, services and employment opportunities whilst reducing any potential leakage in the trade to<br />

the large established shopping areas in Cork City or Douglas, in turn improving the overall quality of life in the town and<br />

discourage unnecessary journeys by car.<br />

1.3.54 It is considered essential to the continued vitality of the town that the established town centre should continue<br />

to be the focus of retail and commercial activity. The construction of an inner relief road, immediately to the west of<br />

the existing town centre, will provide a framework for this expansion and consolidation while contributing to the<br />

relief of traffic congestion on the main street. The provision of access to CL-T-01 will be dependent on the delivery of<br />

this inner western relief road which has been commissioned and set to be delivered by 2023. The completion of this<br />

road, the main streetscape proposals, general road improvements and the public realm requirements outlined in<br />

previous sections when implemented will add greatly to the town centre environment.<br />

Movement<br />

Cork Metropolitan Area Transport Strategy (CMATS)<br />

1.3.55 Cork Metropolitan Area Transport Strategy was finalised in 2020 and the Strategy provides a coherent transport planning<br />

policy framework and implementation plan around which other agencies involved in land use planning, environmental<br />

protection, and delivery of other infrastructure such as housing and water can align their investment priorities. The<br />

strategy identifies specific projects for Carrigaline Town and surrounding area, with particular reference to public<br />

transportation. Projects such as the Greenway Cycle Network between Passage West/Glenbrook/Monkstown and<br />

Carrigaline, bus services for the town and hinterland and the development of the M28.<br />

Road Network<br />

1.3.56 Carrigaline is served by an important network of regional roads and is connected to Cork City via the N28 National<br />

Primary Road at Shannonpark Roundabout. Capacity issues on the National Road network together with high levels<br />

of commuter based travel in the town creates queuing at peak times at Shannonpark Roundabout. The movement<br />

network is one of the key influences on the future development of the town. The Carrigaline Area Transportation<br />

Study was adopted in 2007 and some of its recommendations have been delivered, most notably the eastern relief road.<br />

The planned Western Relief Road has been commissioned and is set to be delivered within the lifetime of this Plan. The<br />

western Inner Relief Road is a key element in the future expansion of the town centre.<br />

1.3.57 The Carrigaline TRPEP, which focuses on the settlement of Carrigaline will take cognisance of the linkages/radial<br />

routes i.e. Ringaskiddy, Passage/Glenbrook/Monkstown, Douglas/city and the airport. A Consultant has been recently<br />

appointed to complete a feasibility assessment and outline design for pedestrian and cycle route between Carrigaline<br />

and both Ringaskiddy and Passage/Glenbrook/Monkstown, which will also address connectivity between Ringaskiddy<br />

and Passage/Glenbrook/Monkstown. The N28 will be a key consideration in relation to this.<br />

1.3.58 The underlying goal for Carrigaline town centre is that provision should only be made for traffic that is essential to the<br />