25.06.2021 Views

volume-4-south-cork-updated-29-04-2021web

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4.1.8: Specific Development Objectives for Carrigaline<br />

* Flood Risk. See Objectives in Volume One, Chapter 11<br />

Water Services<br />

^ TIA and RSA Required.<br />

Objective No.<br />

CL-R-05<br />

Medium A density residential development to include a mix of house types accompanied<br />

with appropriate landscaping. Any development on this site will need to take<br />

account of the biodiversity sensitivities, which have county level importance, of the<br />

site and area.<br />

Net Area (Ha)<br />

2.7<br />

CL—R—06<br />

Medium A density residential development to include a mix of house types. Specific<br />

arrangements should be made for the provision and construction an amenity walk<br />

(CL-U-08). 6<br />

CL-R-07<br />

CL—R—08<br />

CL-R-09<br />

CL-R-10<br />

CL-R-11<br />

CL-R-12<br />

CL-R-13<br />

CL-R-14<br />

Medium A density residential development to include serviced sites and a mix of<br />

house types. Specific arrangements should be made for the continued provision and<br />

construction an amenity walk (CL-U-08).<br />

Medium A density residential development to include a mix of house types accompanied<br />

with appropriate landscaping. Specific arrangements will be made for the<br />

provision and construction of an inner relief road (CL-U-10), amenity walk (CL-U-08).<br />

*<br />

Medium B density residential development. Specific arrangements will be made for<br />

the provision and construction of the link road (CL-U-07) an inner relief road (CL-U-<br />

10), amenity walk (CL-U-08).*<br />

Medium B density residential development to include a mix of house types accompanied<br />

with appropriate landscaping. Access to the site will be from the R611 and the<br />

Mountain Road. Specific arrangements will be made for the provision and construction<br />

of the link road (CL-U-07) an inner relief road (CL-U-10), amenity walk (CL-U-08).<br />

*<br />

Shannon Park UEA Phase 2: Medium A density residential development to include a<br />

mix of house types. Permeability needs to be achieved within the layout to ensure<br />

connectivity with existing and proposed residential areas.<br />

Provision for a primary school is required within CL-C-02. *<br />

Shannon Park UEA Phase 2: Medium A density residential development to include a<br />

mix of house types. Permeability needs to be achieved within the layout to ensure<br />

connectivity with existing and proposed residential areas. *<br />

Shannon Park UEA Phase 3: Medium A density residential development to include a<br />

mix of house types. Permeability needs to be achieved within the layout to ensure<br />

connectivity with existing and proposed residential areas and include the construction<br />

of the Greenway (CL-U-13) and east - west link street (CL-U-01). The Rock Road<br />

(CL-U-12) will need to be upgraded in accordance with the specifications of the<br />

DMURS Guidance document and to the satisfaction of Roads Section in Cork County<br />

Council.<br />

Shannon Park UEA Phase 3: Medium A density residential development to include a<br />

mix of house types. Permeability needs to be achieved within the layout to ensure<br />

connectivity with existing and proposed residential areas and include the construction<br />

of the Greenway (CL-U-13) and east - west link street (CL-U-01). The Rock Road<br />

(CL-U-12) will need to be upgraded in accordance with the specifications of the<br />

DMURS Guidance document and to the satisfaction of Roads Section in Cork County<br />

Council *<br />

1.62<br />

10.6<br />

5.9<br />

12.27<br />

7.9<br />

5.99<br />

4.21<br />

5.09<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!