24.12.2012 Views

Concise Mahavamsa Ruwan Rajapakse, P.E., Sinhalanet.com 1

Concise Mahavamsa Ruwan Rajapakse, P.E., Sinhalanet.com 1

Concise Mahavamsa Ruwan Rajapakse, P.E., Sinhalanet.com 1

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Concise</strong> <strong>Mahavamsa</strong> <strong>Ruwan</strong> <strong>Rajapakse</strong>, P.E., <strong>Sinhalanet</strong>.<strong>com</strong> 61<br />

“Spotted deer are browsing: Peacocks airing their gaudy plumage, strut over the plain; a<br />

majestic elephant is enjoying his evening bath in the shallows; herds of buffaloes leave the<br />

shade of the woods to slake their thirst; grim crocodiles are basking on the shore; troops of<br />

chattering monkeys are sky larking in the trees, while the stately cranes and pink flamingos<br />

stalk the shallows. Such are the scenes that surround the lake of Kanthalai”<br />

(Ref: R.L Brohier, Ancient Irrigation Works of Ceylon – Edited for brevity)<br />

Kaudulla Reservoir: (Tissavaddhamanaka of <strong>Mahavamsa</strong>):<br />

Kaudulla has a bund of 120 ft wide at the base extending to a greater height than the bund of<br />

Minneriya. Height of the bund of this reservoir is measured to be 50 ft. In 1680 AD, an Englishman<br />

named Mr. Pybus had written that this reservoir was in working order.<br />

Padawiya Reservoir: (Ratmalakandaka of <strong>Mahavamsa</strong>):<br />

This is another huge reservoir built by King Mahasen. The bund of this reservoir is much larger than<br />

the bund of the Minneriya reservoir measuring 70 ft in height, 180 ft at the base and 30 ft at the top<br />

with a length of 11 miles.<br />

(Seven story high building)<br />

70 ft<br />

30 ft<br />

180 ft (60 yards)<br />

(More than half the length of a soccer field)<br />

Needs Million Workers for 10 to 15 years: (Governer Henry Ward)<br />

“Padawiya reservoir, most gigantic works of all the reservoirs – 30 ft broad at the summit,<br />

180 ft at the base and seventy feet high. Its construction must have occupied a million<br />

people for 10 to 15 years”<br />

Governer Henry Ward (Ref: R.L Brohier, Ancient Irrigation Works of Ceylon)<br />

The reservoir obtains water from damming Yan Oya and Ma Oya. The sluice of this reservoir was<br />

considered to be built using very high Engineering knowledge.<br />

Padawiya sluice:<br />

“The existing sluice is a remarkable work, not merely from its dimensions but from the<br />

ingenuity and the excellence of its workmanship. It is built of layers of hewn stones varying<br />

from 6 to 12 feet in length and still exhibiting a sharp edge and every mark of the chisel.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!