Project Report - La Trobe University
Project Report - La Trobe University
Project Report - La Trobe University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
How we did it <strong>Project</strong> methodology<br />
Maria sits with the ‘tools of the trade’ beside her:<br />
paper, notebook, pen, hip bag with voice recorder, and<br />
a cup of very sweet, hot coffee.<br />
Kasoy (Levemay) Abaggoy reviews the first draft of<br />
Filluruu, the first oral story we documented in writing.<br />
The story was retold by Kasoy’s mother, Fai (Ernesta)<br />
Aga-id. Beside Kasoy, her son Ayfa (Edmar) Abaggoy<br />
gives a big smile.<br />
In terms of geographical location, we split<br />
ourselves across the two main locations where we<br />
needed to be to conduct the project. Maria was<br />
based in Chananaw and Edwin in Manila, though<br />
we both spent short stints in provincial centers like<br />
Bontoc, Tabuk and Baguio. Also, Edwin spent a<br />
total of six weeks in Chananaw and Maria spent a<br />
total of five weeks in Manila. Refer to the project<br />
schedule at Appendix 1 for further details as to<br />
where each of us was located through the course of<br />
the project and the general focus of our work at<br />
each stage.<br />
As well as managing the project overall (including<br />
preparing all applications and proposals associated<br />
with the project), Maria focused on working within<br />
the community of Chananaw itself, conducting<br />
most of the ethnographic fieldwork, primary data<br />
collection and community engagement aspects of<br />
the work. All of this was done hand-in-hand with<br />
participating community members. Meanwhile,<br />
Edwin was based in Manila to gather all materials<br />
from external sources, to liaise with project<br />
partners and to coordinate the input of the Ang<br />
Ilustrador ng Kabataan artists for storybook<br />
illustrations. However, we both helped each other<br />
out in our respective areas of work and ‘filled in’<br />
for each other on many occasions.<br />
As well as being flexible regarding our respective<br />
roles, we approached the entire project with a very<br />
flexible, open mind – regarding timing (within the<br />
confines of our overall five-month project<br />
timeframe), the actual content of the project, the<br />
people involved, communications with the various<br />
project partners and stakeholders, and our<br />
methods of carrying out the work itself.