05.07.2023 Views

Marina World July August 2023

The magazine for the marina industry

The magazine for the marina industry

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRODUCTS, SERVICES & PEOPLE<br />

The new marine fast charge station at<br />

<strong>Marina</strong> Vela in Barcelona is the second on<br />

the Spanish Catalan coast.<br />

First in Barcelona,<br />

first in Redwood City<br />

The first Aqua superPower electric marine fast charge station at <strong>Marina</strong> Vela<br />

in Barcelona, Spain joins a unit installed a few months ago in the Port of La<br />

Rápita to initiate the creation of a charging corridor on the Catalan coast.<br />

The charge station, installed and<br />

financed by Aqua superPower, offers<br />

a power of 75kW and twin CCS2<br />

connectors. Two electric boats can<br />

simultaneously recharge in as little as<br />

20 to 40 minutes. The charge station is<br />

accessible to electric boat users via the<br />

Aqua app that can be downloaded on<br />

any device to provide a seamless user<br />

experience.<br />

“With this electric boat charge<br />

station, another step is taken towards<br />

converting the port of Barcelona into<br />

a green port,” said Alberto Garcia,<br />

director of <strong>Marina</strong> Vela Barcelona.<br />

“<strong>Marina</strong> Vela Barcelona is the first<br />

nautical facility in Barcelona that has<br />

an electric marine charge station of 75<br />

kW power to bring the arrival of ‘zero<br />

emissions’ boating. The installation of<br />

the new Aqua superPower fast charge<br />

station is part of our commitment to<br />

the environment and leading the way<br />

in sustainable marina management<br />

practices.”<br />

Another ‘first’ marine fast charging<br />

station has been installed at Westpoint<br />

Harbor in Redwood City, San Francisco<br />

Bay. Westpoint Harbor is a world-class,<br />

award-winning marina that offers a<br />

protected harbour with modern slips up<br />

to 120ft (37m) and dry storage. As a<br />

Clean Marine award holder, Westpoint<br />

Harbor leads the way with sustainable<br />

marina management practices, and<br />

the decision to become the first Aqua<br />

network host in the Bay Area continues<br />

that tradition by supporting the growing<br />

number of boat users who want to<br />

switch to clean electric boating.<br />

The Aqua 75 DC marine<br />

supercharger installed at Westpoint<br />

Harbor will provide boat owners with<br />

access to reliable plug and charge<br />

infrastructure, offering features such<br />

as charge point visibility to develop<br />

the confidence to transition away from<br />

liquid carbon fuels.<br />

“As a Gold Anchor marina, Westpoint<br />

Harbor is committed to clean marine<br />

practices,” said Westpoint Harbor<br />

president Mark Sanders. "Having<br />

the opportunity to install Aqua’s<br />

marine supercharger was exciting.<br />

Sustainability and protecting the<br />

environment are extremely important<br />

to us, and we are not short on early<br />

technology adopters around here.<br />

Redwood City is in the heart of Silicon<br />

Valley, and electric boating is the next<br />

logical step in maritime e-mobility."<br />

Scott Canning, vice president<br />

US business development at Aqua<br />

superPower, explained: "Electric marine<br />

mobility works best when boat users<br />

can take advantage of conveniently<br />

located charging stations throughout<br />

their local area. These e-boat corridors<br />

are central to our vision, and we are<br />

delighted to work with Westpoint Harbor<br />

on developing this critical infrastructure<br />

as the first Aqua superPower charging<br />

hub in San Francisco Bay."<br />

www.aqua-superpower.com<br />

A charge station at Westpoint Harbor is the<br />

first in San Francisco Bay.<br />

52 www.marinaworld.com – <strong>July</strong>/<strong>August</strong> <strong>2023</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!