PROJECT CONTROL FOR SPORTS FACILITIES<br />

Professional management enabled realization<br />

in record time: The Chiemgau-Arena was rendered<br />

fit for competitions within a few months<br />

An elegant concept from the start<br />

Right at the beginning of the project,<br />

the Ruhpolding Municipal Council commissioned<br />

<strong>Drees</strong> & <strong>Sommer</strong> to develop<br />

a master plan. In doing so, the client<br />

consciously chose a company with<br />

extensive experience in winter sports.<br />

For example, the project managers were<br />

able to demonstrate expertise from<br />

project control of the 2005 Nordic Ski<br />

World Cup in Oberstdorf.<br />

Now, as then, the experts were impressive<br />

in every respect. Together<br />

with the principal and users they were<br />

able to translate all requirements and<br />

wishes into an elegant overall concept.<br />

The proposed measures were coordinated<br />

with subsidy providers and<br />

approval authorities at an early stage,<br />

leading to optimal cost and schedule<br />

stability.<br />

One of the many unique features<br />

of Ruhpolding was the fact that the<br />

construction site was located in a<br />

water protection area, a landscape<br />

conservation area, a nature reserve,<br />

and a flora & fauna habitat. This meant<br />

that further close coordination with the<br />

appropriate regulatory authorities was<br />

of great importance. With the support<br />

of additional consultants and specialists,<br />

<strong>Drees</strong> & <strong>Sommer</strong> coordinated timely<br />

building approval involving a total of<br />

some 30 permits. An active on-site<br />

presence resulted in project managers<br />

quickly establishing a rapport with all<br />

parties involved.<br />

Professional project organization and<br />

control<br />

To complete all construction work in<br />

2010 and ensure completion in time<br />

for the 2011 World Championship,<br />

demolition began immediately after the<br />

last day of competition in March 2010.<br />

<strong>Drees</strong> & <strong>Sommer</strong> supported the Municipality<br />

of Ruhpolding with project leadhouse<br />

functions and project control<br />

services for all individual subprojects,<br />

delivering systematic project organization<br />

as well as schedule and cost<br />

planning. The professional control of the<br />

project team and construction processes<br />

ensured adherence both to the budget<br />

and to the ambitious schedule. After a<br />

construction period of only ten months,<br />

training and competition resumed at the<br />

Chiemgau-Arena as planned and the<br />

Master plan: Well planned is half built<br />

2011 World Cup was successfully hosted.<br />

The Chiemgau-Arena is now a shining<br />

example of environmental protection<br />

and operational cost savings: All new<br />

buildings obtain their heat energy via<br />

groundwater heat pumps. So bring<br />

on the Biathlon World Championship!<br />

Ruhpolding is very well prepared.<br />

38 39