PROJECT CONTROL FOR SPORTS FACILITIES<br />
Professional management enabled realization<br />
in record time: The Chiemgau-Arena was rendered<br />
fit for competitions within a few months<br />
An elegant concept from the start<br />
Right at the beginning of the project,<br />
the Ruhpolding Municipal Council commissioned<br />
<strong>Drees</strong> & <strong>Sommer</strong> to develop<br />
a master plan. In doing so, the client<br />
consciously chose a company with<br />
extensive experience in winter sports.<br />
For example, the project managers were<br />
able to demonstrate expertise from<br />
project control of the 2005 Nordic Ski<br />
World Cup in Oberstdorf.<br />
Now, as then, the experts were impressive<br />
in every respect. Together<br />
with the principal and users they were<br />
able to translate all requirements and<br />
wishes into an elegant overall concept.<br />
The proposed measures were coordinated<br />
with subsidy providers and<br />
approval authorities at an early stage,<br />
leading to optimal cost and schedule<br />
stability.<br />
One of the many unique features<br />
of Ruhpolding was the fact that the<br />
construction site was located in a<br />
water protection area, a landscape<br />
conservation area, a nature reserve,<br />
and a flora & fauna habitat. This meant<br />
that further close coordination with the<br />
appropriate regulatory authorities was<br />
of great importance. With the support<br />
of additional consultants and specialists,<br />
<strong>Drees</strong> & <strong>Sommer</strong> coordinated timely<br />
building approval involving a total of<br />
some 30 permits. An active on-site<br />
presence resulted in project managers<br />
quickly establishing a rapport with all<br />
parties involved.<br />
Professional project organization and<br />
control<br />
To complete all construction work in<br />
2010 and ensure completion in time<br />
for the 2011 World Championship,<br />
demolition began immediately after the<br />
last day of competition in March 2010.<br />
<strong>Drees</strong> & <strong>Sommer</strong> supported the Municipality<br />
of Ruhpolding with project leadhouse<br />
functions and project control<br />
services for all individual subprojects,<br />
delivering systematic project organization<br />
as well as schedule and cost<br />
planning. The professional control of the<br />
project team and construction processes<br />
ensured adherence both to the budget<br />
and to the ambitious schedule. After a<br />
construction period of only ten months,<br />
training and competition resumed at the<br />
Chiemgau-Arena as planned and the<br />
Master plan: Well planned is half built<br />
2011 World Cup was successfully hosted.<br />
The Chiemgau-Arena is now a shining<br />
example of environmental protection<br />
and operational cost savings: All new<br />
buildings obtain their heat energy via<br />
groundwater heat pumps. So bring<br />
on the Biathlon World Championship!<br />
Ruhpolding is very well prepared.<br />
38 39