GENERAL CONSTRUCTION MANAGEMENT FOR NEW TEACHING AND RESEARCH CENTER<br />

Experience in managing complex<br />

projects<br />

Given the scope of the project, the<br />

principal was looking for management<br />

experts who could not only provide<br />

competent consulting, but could also<br />

control the project professionally<br />

throughout the entire planning and<br />

implementation phase. It is no accident<br />

that <strong>Drees</strong> & <strong>Sommer</strong> was chosen.<br />

Even back in the 1990s, the company’s<br />

work on the Potsdamer Platz in Berlin<br />

demonstrated that it can swiftly and<br />

safely bring even highly complex major<br />

projects to a successful conclusion.<br />

The Dieter Schwarz Stiftung specifically<br />

chose this expertise for the Heilbronn<br />

Education Campus, commissioning<br />

<strong>Drees</strong> & <strong>Sommer</strong> to control all planning<br />

and construction processes. The<br />

company’s management and engineering<br />

experts are thus responsible for all<br />

specialist planning, tendering and construction<br />

management processes and,<br />

as a subset of this, for coordinating<br />

the interfaces to all parties involved,<br />

including architects, construction<br />

companies and public authorities.<br />

But <strong>Drees</strong> & <strong>Sommer</strong> laid the groundwork<br />

for a successful GCM project<br />

before contracts were even awarded:<br />

The experts have been supporting the<br />

Heilbronn Education Campus project<br />

since way back in 2007.<br />

A feasibility study and a detailed site<br />

analysis drew attention to the current<br />

construction site in the Mannheimer<br />

Strasse. As the next step the company<br />

managed the architectural competition<br />

for the buildings currently under<br />

construction. Even at this early stage,<br />

<strong>Drees</strong> & <strong>Sommer</strong> consulted the later<br />

users, ensuring that the new buildings<br />

would reflect their wishes and requirements.<br />

Whether building physics or Facility<br />

management – all have a common goal<br />

With its combined expertise, the<br />

<strong>Drees</strong> & <strong>Sommer</strong> Group drives the<br />

whole project using the same principle<br />

as the Heilbronn Education Campus<br />

itself: bringing various faculties together<br />

and using their interfaces to<br />

ensure that they mesh productively.<br />

With GCM, the company’s internal<br />

specialists’ role includes the entire<br />

web-supported project communication,<br />

user management, building physics,<br />

system planning, fitout, and equipment<br />

planning as well as facility management<br />

consulting. The latter ensures<br />

functional and economic operation of<br />

the three educational establishments<br />

for years to come – long after the first<br />

graduates of the Heilbronn Education<br />

Campus have their diplomas and<br />

degrees in the bag.<br />

Keeping a close eye on all key milestones and the<br />

ultimate goal: Construction process simulation for<br />

the months of April, July, September and December<br />

2010 and visualization of the completed campus.<br />

Client<br />

Dieter Schwarz Stiftung gGmbH, Neckarsulm<br />

Project duration<br />

August 2008 – October 2011<br />

Architect<br />

Glück + Partner, Stuttgart<br />

Key project data<br />

– GFA: 17,100 m²<br />

– Gross volume: 73,000 m³<br />

Schedule<br />

– Architectural competition decision:<br />

03/2009<br />

– Building approval granted: 12/2009<br />

– Ground-breaking ceremony: 02/2010<br />

– Commissioning: September 30, 2011<br />

<strong>Drees</strong> & <strong>Sommer</strong> services<br />

– Feasibility study<br />

– Competition organization<br />

– Project management<br />

– User management<br />

– Facility management consulting<br />

– System planning<br />

– General construction management<br />

Value-add achieved for client<br />

– One contact for all issues<br />

– Consulting in the client’s interests<br />

– Exact adherence to budget and schedule<br />

– Optimization of building operation<br />

– High quality and economy<br />

– Client relieved of construction-related tasks<br />

Work on the building shells proceeded apace in 2010<br />

and fitout has been under way since the end of 2010.<br />