32 - Drees & Sommer
32 - Drees & Sommer
32 - Drees & Sommer
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INTERNATIONAL PROJECT MANAGEMENT FOR PHARMACEUTICAL BUILDINGS<br />
The LIFT production building in Rubí, Spain<br />
Ensuring quality and economy<br />
for an international player<br />
<strong>Drees</strong> & <strong>Sommer</strong> is supporting numerous projects<br />
for B. Braun Melsungen AG as the company<br />
continues its international growth. Whether in Peru,<br />
Spain, Switzerland or at home in Germany, the<br />
success of these construction projects is secured<br />
with management expertise and the right tools.<br />
62<br />
B. Braun sets the highest standards<br />
for the production of pharmaceuticals<br />
and medical products in many countries.<br />
And the company expects the same top<br />
quality when it comes to the construction<br />
of its factory and production buildings.<br />
For this reason, B. Braun commissioned<br />
<strong>Drees</strong> & <strong>Sommer</strong> to undertake project<br />
management for numerous construction,<br />
remodeling and extension projects. The<br />
key goals are to achieve the same high<br />
standard at each site and to ensure that<br />
planning and implementation meet cost,<br />
schedule and quality goals.<br />
A team of pharmaceutical experts has<br />
been devoted to this demanding task for<br />
some time. The long-term client is professionally<br />
supported with high levels of<br />
commitment, dedication and enthusiasm<br />
almost round the clock worldwide.<br />
Peru: Cost and planning check, project<br />
controlling and reporting<br />
B. Braun is building a new industrial and<br />
production building with a gross floor<br />
area of some 10,400 square meters near<br />
the Peruvian capital, Lima. Following<br />
completion of execution planning,<br />
B. Braun commissioned <strong>Drees</strong> & <strong>Sommer</strong><br />
to undertake a review of costs and<br />
planning in order to have the soundest<br />
possible basis for budgeting.<br />
The cooperation between Peru, Spain<br />
and Germany was a special feature of<br />
the project: Because of the distances<br />
involved, it could only take place by<br />
telephone and using digital media<br />
in Spanish and English. Despite difficult<br />
circumstances, the building was completed<br />
on schedule within the budget for<br />
which <strong>Drees</strong> & <strong>Sommer</strong> was responsible<br />
at the end of June 2010.<br />
Spain: Project management with PCS,<br />
reporting and schedule management<br />
<strong>Drees</strong> & <strong>Sommer</strong> supported the<br />
project for the construction of the annex<br />
to the modern LIFT industrial and<br />
production building in Rubí, Spain,<br />
from the beginning of the construction<br />
phase. During the course of the project,<br />
the experts worked with the Spanish<br />
project team and the general planner<br />
to optimize planning following several<br />
changes to the target budget.<br />
The experts got up to speed on the<br />
project by carrying out a complete review<br />
of costings, while at the same time<br />
integrating a complete project management<br />
system for the already started<br />
project. Since then, the experts have<br />
been monitoring and controlling organization,<br />
costs and schedules, as well<br />
as employing the web-based Project<br />
CommunicationSystem (PCS). As a<br />
result of excellent service delivery,<br />
<strong>Drees</strong> & <strong>Sommer</strong> was additionally<br />
commissioned to undertake construction<br />
schedule management for the entire<br />
project.<br />
The commitment of the specialists<br />
paid off: The first two production lines<br />
will start operation on schedule in<br />
spring 2011, with a third following at the<br />
beginning of 2012. Despite extremely<br />
tight costings with no reserves and the<br />
exacting schedule, the project has<br />
remained within budget.<br />
In Lima, <strong>Drees</strong> & <strong>Sommer</strong><br />
is supporting B. Braun with<br />
the construction of a modern<br />
production building<br />
63