OPTIMAL CONSULTING ON FACTORY UPGRADE<br />
Fiat: High value-add through<br />
efficient production workflow<br />
<strong>Drees</strong> & <strong>Sommer</strong> is carrying out a project audit for a factory extension and the production<br />
launch for a new Fiat model in Kragujevac, Serbia. The factory – which dates back to the 1950s –<br />
is to be completely rehabilitated and modernized. The Fiat group is investing approximately<br />
one million Euros in car production at the new site.<br />
With its brands Fiat, Lancia, Alfa Romeo,<br />
Abarth and Maserati, Fiat Group Automobiles<br />
is one of the world’s top ten<br />
automobile manufacturers. It is currently<br />
undergoing structural change. On the<br />
one hand, its partnership with Chrysler<br />
should lead to synergy effects, while<br />
on the other hand the company plans<br />
to continue internationalization of its<br />
brands and expansion of production<br />
capacities in ‘low-cost countries’. In this<br />
context, from mid-2012 the successor<br />
Scope of audit management by <strong>Drees</strong> & <strong>Sommer</strong><br />
model to the Fiat Idea will be manu-factured<br />
at the former Zastava plant in<br />
Kragujevac, Serbia, managed as a joint<br />
venture between the Serbian state and<br />
Fiat. The factory is to be extensively<br />
modernized for the launch of the new<br />
model.<br />
Investment: One billion Euros<br />
Investment of some €1 billion is planned,<br />
resulting in a production capacity of<br />
more than 150,000 cars per year. As<br />
Schedules<br />
Development Production Installation Startup<br />
Energy, buildings, service<br />
Utility supply<br />
Press shop<br />
Car body construction<br />
Quality assurance<br />
Paint shop<br />
Logistics<br />
Final assembly<br />
Phase in/out 188<br />
Interfaces for IT / product / suppliers / personnel<br />
part of a so-called brownfield project,<br />
the existing factory will be completely<br />
adapted to meeting the requirements of<br />
“best practice” automobile production.<br />
Following completion of construction<br />
work, the installation of newly developed<br />
production processes and equipment<br />
will begin. These will set new standards<br />
in comparison to other Fiat Group sites<br />
worldwide and are characterized by<br />
greater manufacturing content.<br />
Quality Organization Communication Scheduling Reporting<br />
Costs<br />
Project audit<br />
<strong>Drees</strong> & <strong>Sommer</strong> is supporting the<br />
project by carrying out a project audit.<br />
During the construction phase as well<br />
as during the development & integration<br />
of the production plant, all processes<br />
relevant to on-schedule, within-budget<br />
implementation to the required quality<br />
standards will be continuously monitored.<br />
Any deviations will be recorded,<br />
and any necessary countermeasures<br />
initiated.<br />
The immense size of the production<br />
halls – some of which are in a critical<br />
condition – has to be emphasized. As<br />
a result, substantial decontamination<br />
work has to be carried out in parallel to<br />
extensive remodeling and upgrading.<br />
At the same time, it must be ensured<br />
that production can continue unhindered<br />
while this work is carried out.<br />
Regular Reporting to client<br />
The key task of the <strong>Drees</strong> & <strong>Sommer</strong><br />
project team is to identify risks in the<br />
project and to communicate these to<br />
the client.<br />
The Managing Director of Fiat Automobiles<br />
Serbia (FAS) and group management<br />
in Turin are kept informed about<br />
the current project status, any improvement<br />
measures implemented and the<br />
overall progress of the project in regular<br />
order to reports. This regular reporting<br />
by <strong>Drees</strong> & <strong>Sommer</strong> delivers a sound<br />
basis for decisions on control measures<br />
by both Fiat management and project<br />
management.<br />
Client<br />
Fiat Automobiles Serbia (FAS), Kragujevac<br />
Project duration<br />
October 2010 – May 2012<br />
Key project data<br />
– Production capacity over 150,000 cars<br />
– Investment volume: Approx. €1 billion<br />
<strong>Drees</strong> & <strong>Sommer</strong> services<br />
– Audit management<br />
Value-add achieved for client<br />
– Recommendations regarding optimal<br />
processes taking production plant and<br />
their integration into account<br />
– Identification of process risks<br />
– Support through production engineering<br />
and structural engineering expertise<br />
<strong>Drees</strong> & <strong>Sommer</strong> identifies project risks for<br />
the upgrade and expansion of the former Zastava<br />
factory in Serbia, at the same time reviewing<br />
process for the Fiat production launch<br />