OVERVIEW OF THE FIVE PROJECT COMPONENTS<br />
Development of a Full-Service Model for <strong>CITO</strong> Page 3<br />
INTRODUCTION<br />
Component Objectives Key Activities Key Dates<br />
Environmental<br />
Scan<br />
Investigate<br />
Requirements for<br />
a Full-Service ITO<br />
Develop <strong>CITO</strong><br />
Communications<br />
and Consultation<br />
Strategies<br />
Describe support services<br />
currently provided to<br />
apprentices, employers<br />
and stakeholders as well<br />
as the communication<br />
methods and vehicles<br />
currently in place<br />
Develop a draft<br />
operational full-service<br />
delivery model for <strong>CITO</strong><br />
Develop communications<br />
strategies to be utilized by<br />
<strong>CITO</strong> to gather and<br />
disseminate information<br />
from and to stakeholders<br />
• Initial meeting with the Steering Committee<br />
• Detailed literature and Internet search<br />
• Preliminary review of the various functions<br />
• Interviews with key industry representatives to obtain information on each trade falling<br />
under the purview of <strong>CITO</strong><br />
• Gather similar information from sectors of similar trades outside of the <strong>CITO</strong> mandate<br />
• Prepare draft report (November 9)<br />
• Meet with the Steering Committee (November 15th)<br />
• Detailed review of the policies and other background documentation describing the<br />
requirements for a full-service ITO<br />
• Detailed literature and Internet search regarding potential approaches and strategies<br />
• Interviews with key informants<br />
• Define the specific deliverables required<br />
• Identify options for achieving these deliverables<br />
• Define the criteria for assessing the options<br />
• In association with the Steering Committee, undertake in-depth logistical planning and<br />
costing exercise to identify the resources required to support the activities & strategies<br />
and demonstrate feasibility in each of the core responsibilities<br />
• In conjunction with <strong>CITO</strong> staff, recommend best options<br />
• Prepare a report containing a draft operational model<br />
• Review information from <strong>Phase</strong> 1 regarding current communications practices<br />
• Analyze communication needs of <strong>CITO</strong> (targets, types of information)<br />
• Determine need for regional communication strategies<br />
• Develop the key messaging for <strong>CITO</strong> and related stakeholders<br />
• Determine the most appropriate communication methods for interacting with clients and<br />
stakeholders<br />
• Determine the costs and resources necessary to carry out effective communication<br />
• Determine the consultation strategy that should be used to get feedback on the draft<br />
operational model from employers, workers, industry associations and other<br />
stakeholders for all 29 trades that are included under <strong>CITO</strong>’s mandate<br />
• Prepare report containing a draft communication and consultation strategy<br />
• First report<br />
submitted by<br />
November 9 th<br />
• Meeting with the<br />
Steering Committee<br />
– November 15th<br />
• <strong>Report</strong> (January 4)<br />
• <strong>Report</strong> (January 4)