19.01.2013 Views

Fairview Refinement Plan III, Case - City of Salem, Oregon

Fairview Refinement Plan III, Case - City of Salem, Oregon

Fairview Refinement Plan III, Case - City of Salem, Oregon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

z<br />

0<br />

-en 0<br />

w<br />

c<br />

u..<br />

0<br />

w<br />

0<br />

......<br />

......<br />

0<br />

z<br />

April 9, 2012<br />

7 (d)<br />

Si necesita ayuda para comprender esta informacion, por favor /lame 503-<br />

588-6173<br />

DECISION OF THE<br />

SALEM PLANNING COMMISSION<br />

FAIRVIEW REFINEMENT PLAN Ill, <strong>Case</strong> No. FRP12-01<br />

APPLICATION NO.: 12-101902-ZO<br />

NOTICE OF DECISION & MAILING DATE: April3, 2012<br />

REQUEST:· Proposal for <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill, a refinement plan for a portion <strong>of</strong>the<br />

former <strong>Fairview</strong> Training Center site, approximately 43.2 acres in size, pursuant to the<br />

requirements <strong>of</strong> the FMU (<strong>Fairview</strong> Mixed Use) zone, SRC Chapter 143C, for property<br />

designated inMixed Usein on the <strong>Salem</strong> Area Comprehensive <strong>Plan</strong> map, zoned FMU<br />

(<strong>Fairview</strong> Mixed Use), and located NINE <strong>of</strong> Battle Creek Rd SE, NINW <strong>of</strong> Reed Rd SE, and<br />

approximately 0.1 Omi SW <strong>of</strong> the terminus <strong>of</strong> Strong Rd SE (Marion County Assessorfts Map<br />

and Tax Lot numbers: 083W11 I 00300 & 00400).<br />

APPLICANT: SIMPSON HILLS LLC<br />

LOCATION: 0 BATTLE CREEK RD SE<br />

CRITERIA: <strong>Salem</strong> Revised Code Chapter 143C<br />

FINDINGS: The facts and findings in the staff report dated March 20, 2012 and<br />

supplemental staff reports dated March 20, 2012 and April 3, 2012, are incorporated herein<br />

by this reference. The <strong>Salem</strong> <strong>Plan</strong>ning Commission found that the applicant adequately<br />

demonstrated that the proposed refinement plan complies with the applicable goals and<br />

policies <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>, <strong>Salem</strong> Area Comprehensive <strong>Plan</strong>, and the applicable<br />

provisions <strong>of</strong> the <strong>Salem</strong> Revised Code (SRC).<br />

DECISION:<br />

The <strong>Plan</strong>ning Commission GRANTED <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> No. FRP12-01 subject to the<br />

following conditions <strong>of</strong> approval:<br />

Condition 1. For the portion <strong>of</strong> Lindburg Road SE that it is the responsibility <strong>of</strong> Simpson Hills<br />

LLC to construct, provide "sharrows" striping and sigriage to accommodate and<br />

direct bicycles in the travel lane <strong>of</strong> the street.<br />

Condition 2: Street trees on public streets shall meet the requirements <strong>of</strong> SRC Chapter 86<br />

Street Trees.<br />

Condition 3: All stormwater facilities serving public rights-<strong>of</strong>-way shall be public and<br />

maintained by the <strong>City</strong>.<br />

Condition 4: Proposed "B" Street south <strong>of</strong> lots 2 and 3 shall be improved in accordance with<br />

the 'local street' cross section <strong>of</strong> the TSP at the time Lot 4 or Lot 5 is developed.<br />

The half-street improvement west <strong>of</strong> the centerline shall be improved with Lot 4;<br />

and the half-street improvement east <strong>of</strong> the centerline shall be improved with Lot<br />

5. Specific design elements <strong>of</strong> the street, such as drainage and street lighting,<br />

shall be addressed at the time <strong>of</strong> construction plan approval.


The half-street improvement west <strong>of</strong> the centerline shall be improved with Lot 4;<br />

and the half-street improvement east <strong>of</strong> the centerline shall be improved with Lot<br />

5. Specific design elements <strong>of</strong> the street, such as drainage and street lighting,<br />

shall be addressed at the time <strong>of</strong> construction plan approval.<br />

APPLICATION PROCESSING<br />

Subject Application<br />

On January 13, 2012, J.Michael Poissant, on behalf <strong>of</strong> Matt Harrell <strong>of</strong> Simpson Hills, LLC., filed<br />

a <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> application (<strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill [Attachment 2]) to develop<br />

a 43.2-acre portion <strong>of</strong> the former <strong>Fairview</strong> Training Center site pursuant to SRC 143C.050(a).<br />

The application was deemed complete for processing on February 8, 2012.<br />

The public hearing on the proposed <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> is scheduled for March 20, 2012.<br />

Notice <strong>of</strong> the public hearing was provided in accordance with SRC 300.620(b). An approval by<br />

the <strong>Plan</strong>ning Commission shall not be construed to have granted a variance from the provisions<br />

<strong>of</strong> any <strong>City</strong> ordinance unless the approval clearly states that a variance has been granted.<br />

Public Notice<br />

1. Notice was mailed to property owners within 250 feet <strong>of</strong> the subject property on February<br />

29, 2012 (Attachment 3).<br />

2. The property was posted in accordance with the posting provision outlined in SRC<br />

300.620.<br />

BACKGROUND/PROPOSAL<br />

On September 24, 2003, the <strong>City</strong> Council adopted amendments to the <strong>Salem</strong> Area<br />

Comprehensive <strong>Plan</strong> (SACP) and <strong>Salem</strong> Revised Code (SRC) establishing a "Mixed Use"<br />

comprehensive plan designation and a "<strong>Fairview</strong> Mixed Use" (FMU) zone district. The adopted<br />

amendments were applied to the former <strong>Fairview</strong> Training Center site to promote the<br />

sustainable and mixed-use development <strong>of</strong> the 275-acre property.<br />

The <strong>Fairview</strong> Mixed Use zone, SRC Chapter 143C, establishes both general overall<br />

development standards for the site as well as the approval process that development <strong>of</strong> the<br />

property must follow. The general overall development standards for the site are established<br />

under <strong>Salem</strong> Revised Code Chapter 143C.070 and require that:<br />

(a) The maximum number <strong>of</strong> dwelling units which shall be permitted in the FMU zone is<br />

2,000;<br />

(b) A minimum <strong>of</strong> 20 acres shall be reserved as natural open space;<br />

(c) The perpetual maintenance <strong>of</strong> open space shall be required and described in any<br />

<strong>Refinement</strong> <strong>Plan</strong>;<br />

(d) All buildings or structures within the FMU zone shall be set back a minimum <strong>of</strong> twenty<br />

(20) feet from the FMU zone boundary; and<br />

FRP 12-01 Page2 March 20, 2012


(e) Except as may be otherwise permitted in the Chapter, a <strong>Refinement</strong> <strong>Plan</strong> covering the<br />

area <strong>of</strong> proposed development must be submitted and approved pursuant to the<br />

provisions <strong>of</strong> this Chapter prior to the occurrence <strong>of</strong> any new development.<br />

In addition to the general development standards, the FMU zone establishes four overlay areas<br />

that are applied to the site and intended generally to control development within the zone. A<br />

master list <strong>of</strong> permitted uses (SRC Chapter 143C.060) and residential development density<br />

requirements (SRC Chapter 143C.11 0) are established for each overlay area. The overlay<br />

areas include:<br />

1. Low-Intensity Residential (LI): Low-Intensity Residential is described as areas that,<br />

"comprise residential uses with detached housing types typically sited on ·separate<br />

parcels with private yards and street and/or alley access. Accessory dwelling units are<br />

permitted, but any non-residential uses are prohibited."<br />

2. Mixed-Intensity (MI): Mixed-Intensity is described as areas that, "comprises primarily<br />

residential uses, along with a mix <strong>of</strong> small-scale, neighborhood commercial,<br />

employment, and civic uses. Buildings will be a mix <strong>of</strong> one to three story detached,<br />

attached, or stacked housing types that may be sited on smaller individually-owned<br />

parcels with private yards and street access, or larger parcels under multiple or separate<br />

ownership with shared street and alley access. Narrow rowhouse development is<br />

appropriate at the higher density range. Accessory dwelling units are permitted."<br />

3. Adaptive Use (AU): Adaptive Use areas are described as comprising, "the highest<br />

concentration <strong>of</strong> existing buildings and historic development patterns. Residential and<br />

non-residential development within these areas may occur within existing structures that<br />

have been rehabilitated or within new structures."<br />

4. Village Center (VC): The Village Center is described as comprising, "the most intense<br />

and pedestrian-oriented residential, commercial, employment and civic uses.<br />

Residential uses will have densities <strong>of</strong> no less than sixteen (16) dwelling units per net<br />

acre. Non-residential uses include a mix <strong>of</strong> large and small scale commercial<br />

enterprises, which will be limited to approximately 30,000 to 80,000 square feet <strong>of</strong><br />

pedestrian-oriented retail. Office uses are encouraged."<br />

The <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill site includes portions <strong>of</strong> the Ml (Mixed-Intensity) and Ll (Low­<br />

Intensity Residential) overlay areas. The bulk <strong>of</strong> the development is proposed within the 'MI'<br />

overlay, and the 'LI' overlay is applicable to a small portion <strong>of</strong> proposed right-<strong>of</strong>-way connecting<br />

the refinement plan to Battle Creek Road SEat Independence Drive SE. To ensure the master<br />

planned development <strong>of</strong> the property, the approval process established under the FMU zone<br />

that development <strong>of</strong> the property must follow includes:<br />

1. Adoption <strong>of</strong>the <strong>Fairview</strong> <strong>Plan</strong> (the master plan for the entire 275 acre site).<br />

2. Adoption <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong>(s) (detailed regulatory plans that implement the<br />

<strong>Fairview</strong> <strong>Plan</strong> and encompass areas <strong>of</strong> the site no less than 40 acres in area).<br />

3. Subdivision Approval<br />

4. Building Permits<br />

FRP 12-01 Page 3 March 20, 2012


On April19, 2005, the <strong>Plan</strong>ning Commission adopted resolution No. PC 05-4 approving the<br />

<strong>Fairview</strong> <strong>Plan</strong>, therefore, completing the first step in the approval process. Two refinement<br />

plans have been approved on the property; 'Pringle Creek Community' in 2005, and 'Lindburg<br />

Green' in 2009. On January 13, 2012, <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill was submitted for the<br />

subject site (Attachment 1 ). <strong>Salem</strong> Revised Code Chapter 143C.1 OO(e) establishes the<br />

following required elements for refinement plans:<br />

1. Illustrative site plan;<br />

2. The general allocation and identification <strong>of</strong> major proposed land uses, including<br />

residential (by density range), nonresidential, open space, and recreational land<br />

uses;<br />

3. Name, location, and extent <strong>of</strong> existing or proposed major streets located within the<br />

<strong>Refinement</strong> <strong>Plan</strong> area or needed for servicing the <strong>Refinement</strong> <strong>Plan</strong> area;<br />

4. Typical street cross-sections; ·<br />

5. A detailed listing <strong>of</strong> the permitted land uses in the <strong>Refinement</strong> <strong>Plan</strong> area;<br />

6. Detailed standards or regulations governing permitted uses, such as performance<br />

standards and standards for development, regulations for development densities,<br />

heights, floor area and FAR, open space, lot area and coverage, parking,<br />

landscaping, and other site improvements;<br />

7. Standards for the conservation, development, or utilization <strong>of</strong> natural resources,<br />

including surface water, soils, vegetation, and wildlife;<br />

8. An inventory and identification <strong>of</strong> all wetland and riparian resources, all intermittent<br />

and perennial waterways, and all trees regulated under SRC Chapter 68;<br />

9. Where applicable, the methods <strong>of</strong> protection or conservation for natural features,<br />

historic structures, and viewsheds;<br />

10. Standards and responsibilities for maintenance <strong>of</strong> infrastructure and whether the<br />

infrastructure is to be public or private;<br />

11. Standards for phasing and construction <strong>of</strong> streets proposed for the <strong>Refinement</strong> <strong>Plan</strong><br />

area or needed for servicing the project as identified in the required study(ies)<br />

submitted with the <strong>Refinement</strong> <strong>Plan</strong> proposal;<br />

12. Standards for the phasing and construction <strong>of</strong> sewage disposal, effluent use,<br />

stormwater drainage, solid waste disposal, and public utilities as identified in the<br />

required studies submitted with the <strong>Refinement</strong> <strong>Plan</strong> proposal;<br />

13. A phasing schedule for the following, as applicable:<br />

· (A) The preservation <strong>of</strong> site features established by the <strong>Fairview</strong> <strong>Plan</strong>;<br />

(B) The development <strong>of</strong> the <strong>Refinement</strong> <strong>Plan</strong> area; and<br />

(C) The construction, dedication, and provision <strong>of</strong> public services;<br />

14. A draft form <strong>of</strong> financial assurances to be recorded prior to <strong>Refinement</strong> <strong>Plan</strong><br />

approval;<br />

15. Specifications as to how and to what extent the <strong>Refinement</strong> <strong>Plan</strong> is to supplement or<br />

supersede adopted <strong>City</strong> regulations;<br />

16. Standards for the interpretation <strong>of</strong> the <strong>Refinement</strong> <strong>Plan</strong> regulations and<br />

requirements;<br />

17. Development design guidelines and applicable approval process;<br />

18. General landscape plan;<br />

19. General Drainage plan;<br />

20. A traffic impact analysis (TIA) update or refinement from the <strong>Fairview</strong> <strong>Plan</strong> TIA that<br />

includes trip generation factors for various modes, estimated trips per day by land<br />

use, proposed vehicular access and circulation plan, and traffic impacts by mode on<br />

adjacent development;<br />

21. Impacts on existing structures and other development;<br />

22. Impacts on existing infrastructure and public services;<br />

FRP 12-01 Page4 March 20, 2012


23. Location and extent <strong>of</strong> proposed provision for sewage disposal, effluent use, storm<br />

water drainage, and utilities;<br />

24. Location <strong>of</strong> any buildings, structures or sites which are identified in the <strong>Fairview</strong> <strong>Plan</strong><br />

inventory <strong>of</strong> known archeological sites and buildings, structures or sites which<br />

possess the criteria for historic resource designation under SRC Chapter 120A.040,<br />

or which have been designated as historically significant in the <strong>Fairview</strong> <strong>Plan</strong><br />

inventory pursuant to SRC 143C.080{b){4)(0); and<br />

25. Other information, as may be determined necessary by the <strong>Plan</strong>ning Administrator.<br />

The owners <strong>of</strong> the subject property, Simpson Hills, LLC., have developed the proposed<br />

refinement plan that is the subject <strong>of</strong> this public hearing before the <strong>Salem</strong> <strong>Plan</strong>ning Commission.<br />

On February 29, 2012, notice <strong>of</strong> public hearing (Attachment 3) was sent to all property owners<br />

within 250 feet <strong>of</strong> the subject property.<br />

Neighborhood Association Comments<br />

SRC 300.620{b){2)(B)(iii) requires public notice be sent to "any <strong>City</strong>-recognized neighborhood<br />

association whose boundaries include, or are adjacent to, the subject property." The subject<br />

property is located within the boundaries <strong>of</strong> the Morningside Neighborhood Association. At the<br />

time <strong>of</strong> writing this staff report, no comments have been received from the neighborhood<br />

association. However, the Morningside Neighborhood Board has indicated that they intend to<br />

vote on the proposal at their March 14, 2012, meeting and may provide testimony at the March<br />

20, 2012, public hearing.<br />

Public Comments<br />

Notice <strong>of</strong> the proposal was mailed to property owners within 250 feet <strong>of</strong> the subject property on<br />

February 29, 2012. Comments were received from one adjacent property owner, Sustainable<br />

<strong>Fairview</strong> Associates; and from one community organization, the Pringle Creek Watershed<br />

Council.<br />

Sustainable <strong>Fairview</strong> Associates LLC -Sustainable <strong>Fairview</strong> Associates LLC (SFA) was<br />

notified <strong>of</strong> the proposal. Comments were submitted by Sam Hall, Managing Member <strong>of</strong> SFA<br />

(Attachment 7). The SFA comments note conceptual support for the location <strong>of</strong> multi-family<br />

housing in the FMU zone and preservation <strong>of</strong> open space detailed in the refinement plan;<br />

however concerns are expressed with regard to overall conformance <strong>of</strong> the proposal with the<br />

<strong>Fairview</strong> Master <strong>Plan</strong>. These concerns, and staff responses to them, are summarized below:<br />

a .... the "A' street and "1't.' street <strong>of</strong> the plan appear to lie on the property lines with SFA<br />

and straddle the property lines. There is not (yet) agreement with SFA about the<br />

location <strong>of</strong> those streets nor the design <strong>of</strong> the streets... ·<br />

Staff Response: The street layout proposed .in the refinement plan appears generally<br />

consistent with the <strong>Fairview</strong> Master <strong>Plan</strong>. Implementation <strong>of</strong> the interconnected street network<br />

contemplated in the Master <strong>Plan</strong> is predicated on cooperative efforts between property owners<br />

within the FMU-zone, similar to the process that yielded the alignment <strong>of</strong> Lindburg Road SE<br />

across portions <strong>of</strong> both the SFA and Simpson Hills LLC properties. However, if accordance<br />

cannot be reached with regard to the alignment <strong>of</strong> proposed 'A' and '1"' streets, it is possible<br />

that the proposal may need to be modified to shift the proposed 'A' and '1 '" street rights-<strong>of</strong>-way<br />

further onto the Simpson Hills LLC property.<br />

FRP 12-01 PageS March 20, 2012


. . .. Principle 6, Respect the Landscape ... The appearance visible from the perimeter and<br />

from satellite <strong>of</strong> the earthwork already done in remediating the orchard .area and carving<br />

out the bases for new streets causes us concern about adherence to the Master <strong>Plan</strong><br />

call to "work with, not against, the existing landscape. The natural slopes for the site are<br />

preserved for recreational use, for habitat, and for storm water flow" and "wetlands are<br />

preserved." One example <strong>of</strong> the work done is apparently a cut forB street across the<br />

south edge <strong>of</strong> Lot 2. Also, the refinement plan reveals a mixed record on preservation <strong>of</strong><br />

wetlands ...<br />

Staff Response: Based on the <strong>City</strong>'s 2011 aerial photographs <strong>of</strong> the Simpson Hills LLC<br />

property it is unclear the degree to which the above-referenced vehicle tracks, left by 2009 soil<br />

remediation activities on the site, match the current refinement plan proposal, whether the track<br />

layout was intended as a precursor to the current refinement plan proposal, or whether the track<br />

locations work with the natural topography. Figure 18 <strong>of</strong> the applicant's proposal depicts the<br />

sinuosity <strong>of</strong> the conceptual street layout relative to site elevation contours, and appears to show<br />

the roadways generally conforming to rather than working against the natural topography <strong>of</strong> the<br />

site. Regarding wetlands, the applicant indicates that a wetland delineation was approved for<br />

the <strong>Fairview</strong> Hills property in 2010 by the <strong>Oregon</strong> Department <strong>of</strong> State Lands (DSL) and the<br />

U.S. Army Corps <strong>of</strong> Engineers. The resulting removal/fill permit identifies the areas <strong>of</strong><br />

permanent and temporary impacts and outlines the mitigation requirements for the entire<br />

<strong>Fairview</strong> Hills property, around which the refinement plan has been designed. Tneplanproposes<br />

to preserve and integrate wetland and drainageway elements identified in the <strong>Fairview</strong><br />

Master <strong>Plan</strong> Natural Resources Inventory, into the open space, <strong>of</strong>f-street pedestrian amenities<br />

and stormwater management components <strong>of</strong> the plan area.<br />

c. . .. Principle 7: Zero Impact to the Regional Watershed ... A key element <strong>of</strong> the Master<br />

<strong>Plan</strong> calls for the use <strong>of</strong> best infiltration practices to retain (almost) all storm water near<br />

where it lands. The refinement plan shows little attempt to infiltrate storm water across<br />

the site. Instead, it appears to provide that the bulk <strong>of</strong> the water be piped to the<br />

northeast corner and/or <strong>of</strong>f site across Reed Road. We are concerned about the<br />

volume, rate <strong>of</strong> discharge, and quality <strong>of</strong> the water leaving the property ... There seems to<br />

be no acknowledgement <strong>of</strong> pending changes in <strong>Salem</strong> code and DEQ requirements for<br />

stcirmwater. There are many available opportunities for better handling <strong>of</strong> the<br />

stormwater ...<br />

d. . .. the preliminary detailed site drawings for the first phase complex/compound <strong>of</strong><br />

apartments on Lot 2 has acres <strong>of</strong> large impermeable parking lots and no visible<br />

accommodation for infiltration <strong>of</strong> water even around the edges ...<br />

Staff Response: The applicant submitted a geotechnical investigation with the refinement plan<br />

(Appendix 5) to assess among other things the stormwater infiltration capability <strong>of</strong> soils on the<br />

subject property. Based on infiltration testing the report indicates that the site is characterized<br />

by lateral migration <strong>of</strong> infiltrating water rather than vertical infiltration, and is poorly suited for<br />

subsurface disposal <strong>of</strong> stormwater. In response to these findings, the applicant proposes a<br />

stormwater attenuation area in the northeast corner <strong>of</strong> the refinement plan area allowing for<br />

natural infiltration to the extent possible. The plan indicates that the stormwater facility will be<br />

designed as an extended dry basin that provides both water quantity attenuation and water<br />

quality treatment that is appropriate for this setting given the existing soils, hydrology,<br />

topography, and surrounding environment. The facility will be designed in accordance with the<br />

Low Impact Development Approaches Handbook adopted by Clean Water Services <strong>of</strong><br />

Washington County, which the Public Works Department has indicated is consistent with the<br />

FRP 12-01 Page 6 March 20, 2012


stormwater and water quality standards being developed by the <strong>City</strong> <strong>of</strong> <strong>Salem</strong>.<br />

e. Principle 10: Green Corridors for People and Other Living Things ... "Wide green<br />

corridors with direct connection to hundreds <strong>of</strong> front doors and porches are a signature<br />

feature <strong>of</strong> the new FTCR." To the extent there are "fronts" <strong>of</strong> the buildings for human<br />

interaction in the neighborhood, they seem pointed to the interior <strong>of</strong> the property where<br />

recreational space for tenants is provided. There seems to be no contribution to<br />

neighborhood livability in the form <strong>of</strong> public gathering or recreational space or even<br />

informal encounters ...<br />

f. Principle 12: An Interconnected Street System ... The Master <strong>Plan</strong> envisions "a high<br />

degree <strong>of</strong> connection to surrounding neighborhoods. In this way the FCTR avoids the<br />

tendency toward 'gated community' planning." The development <strong>of</strong> Lots 1 and 2 looks<br />

like two large apartment compounds with minimal access and no provision for<br />

neighborhood traffic <strong>of</strong> any mode through the 10-12 acre complexes on 13·15 acre sites.<br />

The only streets are around the perimeter <strong>of</strong> the entire 30 acres and those streets are<br />

not well connected to the rest <strong>of</strong> the <strong>Fairview</strong> property or the surrounding community ...<br />

Staff Response: According to <strong>Refinement</strong> <strong>Plan</strong> Figure 21 the proposed multi-family<br />

developments will incorporate pedestrian connections to sidewalks within the adjacent<br />

streetscape, and to <strong>of</strong>f-street multi-use pathways and trails within .the western 'green corridor'<br />

and the large open space located in the central and northeast portions <strong>of</strong> the site. The<br />

applicant's submittal also demonstrates that the pedestrian and street connections within the<br />

refinement plan area will integrate into the street and pedestrian network in the vicinity <strong>of</strong> the<br />

site. The pedestrian amenities provided in the refinement plan area and the location <strong>of</strong> the plan<br />

adjacent to the 'Village Center' approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II to the north <strong>of</strong> Lindburg<br />

Road SE are anticipated to foster opportunities for interaction with the surrounding community.<br />

In addition, at the time that development is proposed, the multi-family complexes will be subject<br />

to the standards and guidelines <strong>of</strong> the <strong>City</strong>'s Development Design Review Handbook, which<br />

includes additional provisions for pedestrian connectivity with the streetscape.<br />

g. Principle 5: Build Innovative Green Buildings; Principle 1: Build in Economic and Social<br />

Diversity ... The refinement plan states "multi-family homes are by their very nature<br />

'Green' buildings" and that they will be built to "meet and exceed current state and/or<br />

model energy code requirements". However, the remainder <strong>of</strong> the refinement plan text<br />

on these topics weakens whatever commitment is contained in those statements. The<br />

innovative green buildings envisioned in the Master <strong>Plan</strong> would achieve the kind <strong>of</strong><br />

natural resource use and energy efficiency incorporated in standards such as Earth<br />

Advantage or LEED ...<br />

Staff Response: The purpose and intent statements <strong>of</strong> the FMU zone (SRC 143C.01 0), which<br />

implements the principles <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>, encourage energy conservation and<br />

resourceful land use and building placement While LEED-rated development is encouraged<br />

within the Master <strong>Plan</strong> document it is not a requirement for FMU-zone development under SRC<br />

Chapter 143C. The applicant indicates that the proposed multi-family developments will feature<br />

energy efficient lighting in all common areas and dwelling units, and that multi-family units are<br />

very energy efficient when compared to single family homes because the units are grouped<br />

together and stacked to reduce the building's heat loss and air infiltration by minimizing the<br />

percentage <strong>of</strong> exterior wall and ro<strong>of</strong> area when compared with individual detached dwelling<br />

units. The plan further points out that the primary building materials used in apartment<br />

construction, such as wood, sand, gravel, gypsum, and water, are natural products that are<br />

FRP 12-01 Page 7 March 20, 2012


locally found, and that the use <strong>of</strong> natural materials that are found locally is a well accepted<br />

green building standard. The efficient use <strong>of</strong> land afforded by concentrating development in<br />

high-density multi-family structures also allows the plan to minimize the land area devoted to<br />

building footprints, preserve the 'green corridors' as contemplated in the <strong>Fairview</strong> Master <strong>Plan</strong><br />

and contribute significantly to the overall open space preservation goals <strong>of</strong> the FMU zone.<br />

h. The Master <strong>Plan</strong> says: "To the maximum extent possible, [residential] units will be mixed<br />

so that every block will have homes for different types <strong>of</strong> people at different stages <strong>of</strong><br />

lives and earning potentials." Lots 1 and 2 appear to have one type <strong>of</strong> building with one<br />

type <strong>of</strong> rental (with 1-3 bedrooms) and, perhaps, one type <strong>of</strong> townhouse. In the words<br />

<strong>of</strong> one <strong>of</strong> the original team for the Master <strong>Plan</strong>, the proposal provides a "relentless<br />

repetition <strong>of</strong> single building type". In this respect, the refinement plan detracts from the<br />

goal <strong>of</strong> a visually and socially diverse community in a variety <strong>of</strong> building types ...<br />

Staff Response: The refinement plan calls for multi-family development to complement the<br />

· existing single-family housing stock within the FMU zone and foster greater consistency <strong>of</strong><br />

development within the FMU-zone with the goals <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>. The plan<br />

indicates that the multi-family developments will feature a variety <strong>of</strong> unit types to meet the needs<br />

<strong>of</strong> tenants <strong>of</strong> diverse income levels, family types, and life stages as is called for in the Master<br />

<strong>Plan</strong>. The proposed multi-family housing will result in mixed income and active neighborhoods<br />

in the FMU zone designed to take advantage <strong>of</strong> the nearby retail and employment opportunities<br />

within and adjacent to the refinement plan area.<br />

i. Principle 2: Create a Center; The Center envisioned in the Master <strong>Plan</strong> lies on SFA<br />

property directly north <strong>of</strong> Lot 2 <strong>of</strong> the refinement plan. The refinement plan does leave<br />

intact most <strong>of</strong> the basic topography that orients the site toward that Center. The design<br />

and layout <strong>of</strong> the apartment complexes, however, largely ignore the future Center. The<br />

housing units on the north <strong>of</strong> Lot 2 could contribute to the Principles if they were mixeduse<br />

or similarly designed to face and participate in the future development across the<br />

street... ·<br />

j. Principle 4: Create Local Employment. .. The commercial space shown on Lot 3 and Lot<br />

5 appears to be designed for automobile traffic passing by on Reed Road and B street.<br />

The location <strong>of</strong> the commercial space does not look conveniently accessible to other<br />

kinds <strong>of</strong> transport. Depending on the type <strong>of</strong> business attracted, it might well detract<br />

from the commercial viability <strong>of</strong> the Center. The location and layout work to elevate B<br />

street from the (narrow) local street <strong>of</strong> the Master <strong>Plan</strong> to compete with Lindburg Street<br />

as "Main Street" for the entrance to the entire development...<br />

Staff Response: The multi-family housing and commercial areas depicted in the refinement<br />

plan will be located across Lindburg Road SE from the 'Village Center' area approved in<br />

<strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II, and are designed as an appropriate transition between the civic,<br />

commercial, and mixed use developments contemplated in the Center and the future lowerintensity<br />

housing to the south and west. The massing and design <strong>of</strong> the proposed multi-family<br />

developments are intended to contribute toward an active and vibrant pedestrian environment<br />

adjacent to the future 'Village Center;' with more intense development clustered adjacent to the<br />

'Main Entry' at Lindburg Road SE as indicated in the Master <strong>Plan</strong>. Notwithstanding the intended<br />

temporary nature <strong>of</strong> 'B' Street as a standalone connection to Battle Creek Road as the FMU<br />

zone develops, the less intensive development anticipated in the 'LI' overlay zone adjacent to<br />

Battle Creek Road SE will enhance the identity <strong>of</strong> Lindburg Road as a 'Main Street' in the FMU<br />

zone.<br />

FRP 12-01 PageS March 20, 2012


k. Principle 11 : Transit Close at Hand ... The refinement plan Figure 13 shows the probable<br />

future extensions <strong>of</strong> public transit routes. In spite <strong>of</strong> the explanation in the plan, it is<br />

difficult to see how the tenants on Lots 1 and 2 could easily get to the extended route 6.<br />

It is also hard to see the promised "interconnected public street/sidewalk system that<br />

blends with <strong>of</strong>f-site properties". As noted earlier, the northern facades <strong>of</strong> the two<br />

apartment compounds do not appear to encourage pedestrian or bicycle traffic from the<br />

1 03-acre Simpson Hill site to the probable extension <strong>of</strong> route 7 on Lindburg Street.<br />

Staff Response: The applicant has provided a transit plan (Figure 13) demonstrating that all<br />

development within the refinement plan area will be located within Y. mile <strong>of</strong> existing and future<br />

<strong>Salem</strong>-Keizer Transit District bus lines, which in concert with the proposed street and pedestrian<br />

network ensures the availability <strong>of</strong> a variety <strong>of</strong> transportation options for future residents and<br />

businesses within and surrounding the plan area. The refinement plan includes a conceptual<br />

build-out plan for the remainder <strong>of</strong> the Simpson Hills LLC property (Figure 6) showing several<br />

eventual street and pedestrian/multi-use pathway connections to <strong>Salem</strong>-Keizer Transit District<br />

Bus Line 6 on Battle Creek Road SE. As an interim measure, the plan provides a direct street<br />

connection from anticipated multi-dwelling developments to Battle Creek Road SE via proposed<br />

'B' Street. With regard to access from the proposed multi-family development to future transit<br />

service along Lindburg Road, Figure 21 <strong>of</strong> the plan depicts a number <strong>of</strong> sidewalk and multi-use<br />

pathway pedestrian connections from the refinement plan area to the Lindburg Road right-<strong>of</strong>way<br />

to encourage multiple transportation options within the FMU zone.<br />

Pringle Creek Watershed Council- The Pringle Creek Watershed Council (PCWC) was<br />

notified <strong>of</strong> the proposal and submitted comments (Attachment 8). The PCWC comments note<br />

concerns with regard to stormwater management and treatment. These concerns, and staff<br />

responses to them, are summarized below:<br />

... We are disappointed to see a centralized storm water detention basin for the run<strong>of</strong>f<br />

from the full 1 00+ acre development. .. One <strong>of</strong> the central principles <strong>of</strong> the adopted<br />

<strong>Fairview</strong> Master <strong>Plan</strong> is "zero impact to the watershed" through the use <strong>of</strong> "green<br />

infrastructure" ... The Master <strong>Plan</strong> says the development will "protect nature and develop<br />

new techniques for integrating the natural and built environments" ... and "incorporate the<br />

best existing ideas and constructing infrastructure, including utilities, streets, energy<br />

systems, water [and] stormwater'' while providing "opportunities to experiment with<br />

leading edge technologies and to create the technologies that will guide future<br />

infrastructure development" ...<br />

. . . We do not see these criteria being met. Distributed systems, such as porous<br />

pavements and rain gardens, more closely mimic the natural environment in terms <strong>of</strong><br />

natural infiltration, retention, and pollution control, as compared piping run<strong>of</strong>f to a large<br />

detention pond ...<br />

Staff Response: As discussed earlier in this report, the applicant submitted a geotechnical<br />

investigation with the refinement plan (Appendix 5) to assess the stormwater infiltration<br />

capability <strong>of</strong> soils on the subject property. Based on infiltration testing the report indicates that<br />

the site is characterized by lateral migration <strong>of</strong> infiltrating water rather than vertical infiltration,<br />

and is poorly suited for subsurface disposal <strong>of</strong> stormwater. The proposed stormwater<br />

management infrastructure was designed in response to these findings, with a stormwater<br />

attenuation area proposed in the northeast corner <strong>of</strong> the refinement plan area allowing for<br />

natural infiltration to the extent possible. The plan indicates that the stormwater facility will<br />

FRP 12-01 Page 9 March 20, 2012


provide both water quantity attenuation and water quality treatment. The facility will be<br />

designed in accordance with the Low Impact Development Approaches Handbook adopted by<br />

Clean Water Services <strong>of</strong> Washington County, which is consistent with the stormwater and water<br />

quality standards being developed by the <strong>City</strong> <strong>of</strong> <strong>Salem</strong>.<br />

<strong>City</strong> Department Comments<br />

Public Works Department- The Public Works Department, Development Services Section,<br />

reviewed the proposal and submitted comments (Attachment 4).<br />

Community Development (Building and Safety Division)- The Building and Safety Division<br />

has reviewed this proposal and indicated that they have no comments.<br />

Police Department - The <strong>Salem</strong> Police Department reviewed the proposal and indicated they<br />

have no comments.<br />

Fire Department- The <strong>Salem</strong> Fire Department reviewed the proposal and submitted<br />

comments (Attachment 5)<br />

Public and Private Agency Comments<br />

<strong>Salem</strong>-Keizer Public Schools- <strong>Salem</strong> Keizer Public Schools reviewed the proposal and<br />

submitted comments (Attachment 6).<br />

Northwest Natural (NW Natural) -A representative from NW Natural has reviewed the<br />

proposal and indicated that they. have no comments on this case.<br />

Portland General Electric (PGE)- PGE reviewed the proposal and submitted the following<br />

comments: "Development cost per current tariff and service requirements. [A]1 0-foot PUE [is]<br />

required on all front street lots."<br />

Department <strong>of</strong> State Lands (DSL)- DSL was notified <strong>of</strong> the proposal.<br />

<strong>Oregon</strong> State Historic Preservation Office (SHPO) - SHPO was notified <strong>of</strong> the proposal.<br />

<strong>Salem</strong> Area Comprehensive <strong>Plan</strong> !SACP! Designation<br />

Land Use: . The <strong>Salem</strong> Area Comprehensive <strong>Plan</strong> designates the subject property as "Mixed<br />

Use". The Comprehensive <strong>Plan</strong> designation <strong>of</strong> all surrounding properties is as follows:<br />

North:<br />

South:<br />

East:<br />

West:<br />

Zoning<br />

"Mixed Use"<br />

"Single-Family," "Developing Residential"<br />

"Developing residential" and "Community Service, H-Hospital"<br />

"Mixed Use"<br />

The subject property is currently zoned <strong>Fairview</strong> Mixed Use (FMU). Zoning <strong>of</strong> surrounding<br />

properties includes:<br />

North: FMU (<strong>Fairview</strong> Mixed Use); former <strong>Fairview</strong> Training Center<br />

FRP 12-01 Page 10 March 20, 2012


concurrent proposal to subdivide the property, which identifies a total <strong>of</strong> 47 trees on the subject<br />

property; 15 <strong>of</strong> which are regulated as 'significant' or 'riparian' trees pursuant to SRC 68.050<br />

and 68.060. The TCP identifies 15 <strong>of</strong> the 47 existing trees for removal. Under the city's tree<br />

preservation ordinance (SRC Chapter 68), tree conservation plans are required to preserve a<br />

minimum <strong>of</strong> 25 percent <strong>of</strong> the existing trees on the property. The applicant's tree plan preserves<br />

68 percent <strong>of</strong> the existing trees, which includes the <strong>Oregon</strong> White Oaks identified as 'Significant<br />

Tree Stand Number 16' in the <strong>Fairview</strong> Master <strong>Plan</strong>, Natural Resources Inventory. The TCP is<br />

being reviewed by staff and, if approved, will be binding on the lots until final occupancy. The<br />

site was also the subject <strong>of</strong> a 2009 Tree Regulation Variance (TRV <strong>Case</strong> 09-01), which<br />

authorized the removal <strong>of</strong> 67 percent <strong>of</strong> the on-site trees to allow for the scraping and removal<br />

<strong>of</strong> contaminated topsoil on the property.<br />

Landslide Susceptibility: SRC Chapter 69 "Landslide Hazards" sets forth the mitigation<br />

requirements that may be imposed if landslide hazards are present on a property. This is done<br />

primarily through establishing the sum <strong>of</strong> landslide hazard points (a combination <strong>of</strong> the mapped<br />

landslide hazard points and those points associated with the type <strong>of</strong> proposed development) in<br />

order to determine what mitigation, if any, is required to ensure a safe and healthful<br />

development. The subject property features three (3) mapped landslide hazard points and a<br />

subdivision request incurs three (3) "activity" points. A total <strong>of</strong> six (6) points indicates a moderate<br />

landslide risk; therefore, a gee-assessment is required. The applicant submitted a Geotechnical<br />

Investigation (Appendix 5) and Archaeological Hazard Assessment Report (Appendix 6) with the<br />

proposed refinement plan and subdivision applications.<br />

According to SRC Chapter 143C.160(b), <strong>Refinement</strong> <strong>Plan</strong>s shall also consider the following:<br />

(1) The preservation <strong>of</strong> natural drainage patterns <strong>of</strong> the site;<br />

(2) The existence and use <strong>of</strong> native plant species, where appropriate;<br />

(3) The integrity <strong>of</strong> mature stands <strong>of</strong> trees that are in good health;<br />

(4) The significant wildlife habitat; and<br />

(5) The minimization <strong>of</strong> the amount <strong>of</strong> impervious surfaces near all waterways.<br />

In order to address these additional guidelines, the proposed refinement plan includes a number<br />

<strong>of</strong> elements that identify, inventory, and set goals and policies pertaining to the above identified<br />

resources that can be found on pages 5-9, 32-37 and 46-50 <strong>of</strong> the plan. The applicant has<br />

made substantial efforts to minimize impacts from the development on the natural site features<br />

identified in the <strong>Fairview</strong> Master <strong>Plan</strong>. Natural drainage patterns are preserved on the site<br />

through the designation <strong>of</strong> open space, the preservation <strong>of</strong> a substantial percentage <strong>of</strong> existing<br />

trees, and the layering <strong>of</strong> storm water infiltration and onsite detention infrastructure within the<br />

site's natural drainage systems.<br />

An intermittent tributary <strong>of</strong> the West Middle Fork <strong>of</strong> Pringle Creek traverses the eastern portion<br />

<strong>of</strong> the Simpson Hills LLC properties and intersects the eastern one-third <strong>of</strong> the refinement plan<br />

area. The plan calls for this riparian area to be protected and enhanced through the designation<br />

a 6.01-acre 'natural' open space area encompassing the existing wetlands near the terminus <strong>of</strong><br />

the waterway, and a stormwater attenuation area adjacent to several existing wetlands. The<br />

proposal also provides for the protection <strong>of</strong> the <strong>Oregon</strong> White Oak grove identified as<br />

'Significant Tree Stand Number 16' in the <strong>Fairview</strong> Master <strong>Plan</strong>, Natural Resources Inventory.<br />

The refinement plan notes that ecologically sensitive areas will be landscaped with native and<br />

non-invasive plant species to enhance the value <strong>of</strong> these resources as water quality amenities<br />

and wildlife habitat. · The plan also calls for natural open space to be protected and maintained<br />

in perpetuity pursuant to SRC 143C.070 through establishment <strong>of</strong> a Property Owners<br />

Association (POA).<br />

FRP 12-01 Page 12 March 20, 2012


Wetlands: According to the <strong>Salem</strong>-Keizer Local Wetland Inventory (LWI), the subject property<br />

contains several areas <strong>of</strong> mapped wetlands in addition to an intermittent tributary.<strong>of</strong> the West<br />

Middle Fork <strong>of</strong> Pringle Creek. As part <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong> approval process, a wetland<br />

delineation report, Delineation <strong>of</strong> Wetlands and Other Waters <strong>of</strong> the United States for<br />

Sustainable <strong>Fairview</strong> Site, was prepared for the site and dated March 28, 2003. The report was<br />

filed with the <strong>Oregon</strong> Department <strong>of</strong> State Lands (DSL) for their review and jurisdictional<br />

determination. The LWI is general in nature. Removal-fill activities within waters <strong>of</strong> the state are<br />

regulated by DSL and the U.S. Army Corps <strong>of</strong> Engineers. SRC Chapter 126 requires the <strong>City</strong> to<br />

send a Wetland Land Use Notification to the <strong>Oregon</strong> Department <strong>of</strong> State Lands (DSL). A<br />

Wetland Land Use Notification (WLUN) was submitted to DSL on February 23, 2012.<br />

According to the applicant a wetland delineation was completed for the <strong>Fairview</strong> Hills property in<br />

2009, submitted to DSL and the U.S. Army Corps <strong>of</strong> Engineers (USAGE) on September 1,<br />

2009, and approved by DSL on June 1, 2010 and the USAGE on July 6, 2010. The resulting<br />

DSL-issued a removal/fill permit (DSL 45110-RF) identifies the areas <strong>of</strong> permanent and<br />

temporary impacts and outlines the mitigation requirements for the entire <strong>Fairview</strong> Hills property.<br />

The refinement plan proposes to preserve and integrate wetland and drainageway elements <strong>of</strong><br />

'Area 1', 'Area 2', and 'Area 6,' as identified in the <strong>Fairview</strong> Master <strong>Plan</strong> Natural Resources<br />

Inventory, into the open space, <strong>of</strong>f-street pedestrian amenities and stormwater management<br />

components <strong>of</strong> the plan area. Compliance with DSL requirements will be coordinated between<br />

the applicant and DSL staff.<br />

Transportation <strong>Plan</strong>ning ·<br />

SRC Chapter 143C.165 requires refinement plans to identify whether the plan significantly<br />

affects a transportation facility by: ·<br />

1. Changing the level <strong>of</strong> service <strong>of</strong> an existing or planned transportation facility;<br />

2. Changing standards implementing the street classification system;<br />

3. Allowing types or levels <strong>of</strong> land uses which would result in levels <strong>of</strong> travel or<br />

access which are inconsistent with the level <strong>of</strong> service <strong>of</strong> a transportation facility;<br />

or<br />

4. Reducing the level <strong>of</strong> service <strong>of</strong> the facility below the minimum acceptable level<br />

identified in the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> Transportation System <strong>Plan</strong>.<br />

The proposed plan will not significantly affect a transportation facility. As required under the<br />

<strong>Fairview</strong> <strong>Plan</strong> (SRC Chapter 143C.080(b)(4)(B}), a Traffic Impact Analysis (TIA) was submitted<br />

to, and approved by, the Public Works Department identifying traffic impacts and necessary<br />

mitigation measures to accommodate the proposed development <strong>of</strong> the entire <strong>Fairview</strong> site and<br />

ensure that existing transportation facilities are not significantly affected. SRC Chapter<br />

143C.100(e)(20) requires that for refinement plans, a TIA update <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong> TIA be<br />

submitted. The required TIA update has been submitted to the Public Works Department. It is<br />

included as Appendix 3 <strong>of</strong> the refinement plan.<br />

The <strong>Fairview</strong> <strong>Plan</strong> TIA predicts a total <strong>of</strong> approximately 17,000 trips when all275 acres are<br />

developed. The TIA submitted by the applicant shows that the anticipated traffic fits into the<br />

framework set by the <strong>Fairview</strong> <strong>Plan</strong> and associated Infrastructure agreement. The traffic<br />

predicted from this refinement plan is about 3,880 trips generated by an anticipated 450 living<br />

units and approximately 24,000 square feet <strong>of</strong> <strong>of</strong>fice and retail space. The Public Works<br />

Department has identified that the first phase <strong>of</strong> the plan will result a net increase <strong>of</strong><br />

approximately 1 ,445 average daily trips.<br />

FRP 12-01 Page 13 March 20, 2012


CRITERIA FOR APPROVAL.<br />

A. SRC Chapter 143.1 OO(f) indicates that review and approval <strong>of</strong> refinement plans shall be<br />

considered major amendments to the <strong>Fairview</strong> <strong>Plan</strong> and shall follow the provisions <strong>of</strong><br />

143C.090. Approval <strong>of</strong> refinement plans shall be based on the following:<br />

FRP 12-01<br />

1. The refinement plan shall be consistent with the <strong>Fairview</strong> <strong>Plan</strong>.<br />

Finding: The proposed <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill is consistent with the goals,<br />

policies, and development objectives <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>. The plan calls<br />

for the site to be developed as a pedestrian -and transit-friendly community<br />

providing multi-family housing options to complement existing single-family<br />

development in the FMU zone, neighborhood-scale commercial development,<br />

substantial open spaces and 'green corridors' and recreational opportunities.<br />

The plan preserves the significant natural features and topography <strong>of</strong> the site<br />

through the layering <strong>of</strong> natural and development infrastructure, designating open<br />

space, and site design and street layouts designed to foster efficient land use<br />

development to make efficient street layout to preserve as many large trees as<br />

possible. The plan is designed to facilitate the following:<br />

• Preservation <strong>of</strong> 1 0 acres <strong>of</strong> open space,<br />

• Opportunities for diverse housing suitable to tenants <strong>of</strong> a variety <strong>of</strong><br />

income levels and living styles,<br />

• Standards and conditions to promote commercial development within the<br />

framework <strong>of</strong> a walkable community that features attractive streetscapes<br />

and open space, ·<br />

• Innovative integration <strong>of</strong> natural features identified in the <strong>Fairview</strong> Master<br />

<strong>Plan</strong> into pedestrian and stormwater systems.<br />

The proposed plan encourages a mix <strong>of</strong> residential and commercial uses,<br />

protects and integrates open spaces and natural features, provides for a greater<br />

variety <strong>of</strong> housing options within the FMU zone and calls for re-use <strong>of</strong> on-site<br />

materials where appropriate. This proposal therefore satisfies this criterion.<br />

2. The refinement plan shall be in conformance with all applicable portions <strong>of</strong><br />

the <strong>Salem</strong> Revised Code unless alternative standards are proposed and<br />

approved. ·<br />

Finding: Pursuant to SRC 143C.11 0, refinement plans may establish alternative<br />

development standards. Standards or processes stipulated in an approved<br />

refinement plan shall supersede the standards or processes <strong>of</strong> the zoning code<br />

and shall be used as review criteria for any specific development proposal within<br />

the area covered by the <strong>Refinement</strong> <strong>Plan</strong>. <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill proposes<br />

alternative development standards geared toward maintaining the development<br />

pattern envisioned in the <strong>Fairview</strong> Master <strong>Plan</strong> while providing flexibility to<br />

accommodate wetland and open space preservation and topographic<br />

constraints. The alternative standards are identified on pages 25-31 <strong>of</strong> the<br />

refinement plan (Attachment 2). Where a specific alternative development<br />

standard is not proposed, the development shall comply with the applicable<br />

portion <strong>of</strong> the <strong>Salem</strong> Revised Code, therefore satisfying this criterion.<br />

Page 14 March 20, 2012


B. Because refinement plans are major amendments to the <strong>Fairview</strong> <strong>Plan</strong>, approval <strong>of</strong><br />

major amendments shall be based on the following additional criteria:<br />

FRP 12-01<br />

1.<br />

2.<br />

3.<br />

4.<br />

Conformance with the <strong>Salem</strong> Area Comprehensive <strong>Plan</strong>;<br />

The compatibility <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong> with adjoining land uses;<br />

The physical feasibility <strong>of</strong> the FaiNiew <strong>Plan</strong> with existing or proposed<br />

infrastructure and seNices;<br />

Conformance with the following goals:<br />

A. To encourage mixed-use development, improved protection <strong>of</strong> open<br />

spaces and natural features, and greater housing and transportation<br />

options;<br />

B. To encourage the innovative integration <strong>of</strong> park and school uses;<br />

C. To encourage the principles <strong>of</strong> sustainable development and sustainable<br />

business practices;<br />

D. To support affordable housing options and mixed-income neighborhoods;<br />

E. To facilitate the resourceful use <strong>of</strong> land through the efficient arrangement<br />

<strong>of</strong> land uses, buildings, circulation systems, open space and<br />

infrastructure;<br />

F. To encourage economic opportunities that comply with and support<br />

business practices;<br />

G. To recognize the historic significance <strong>of</strong> buildings, structures and sites,<br />

including archeological sites, through the appropriate means, including,<br />

but not limited to, obtaining <strong>of</strong>ficial historic resource designation; and<br />

H. To encourage energy conseNation and improved air and water quality.<br />

1. Conformance with the <strong>Salem</strong> Area Comprehensive <strong>Plan</strong><br />

The proposed <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill is compatible and consistent with the<br />

intent, goals, and policies <strong>of</strong> the SACP:<br />

a. Mixed Use Intent and Purpose Statements: The Mixed Use<br />

designation encompasses the qpportunity for a variety <strong>of</strong> housing<br />

opportunities, including but not limited to, single-family detached,<br />

single-family attached, garden apartment, apartment, communal living,<br />

and rowhouses. The location, density, and style <strong>of</strong> housing is governed<br />

by the zoning code. What differentiates this classification from<br />

Single-Family and Multi-Family Residential categories is an expansion <strong>of</strong><br />

the types <strong>of</strong> uses deemed compatible with residential development. In<br />

addition to non-residential uses (such as schools and other educational<br />

facilities, parks, open space, and religious organizations), this<br />

classification permits the mixing <strong>of</strong> shopping and seNices,-convenience<br />

stores, commercial <strong>of</strong>fice (including live-work units) and compatible<br />

commercial and/or industrial uses within neighborhoods and structures.<br />

The purpose <strong>of</strong> this designation is to:<br />

1. Allow a mixture <strong>of</strong> complementary land uses that may include<br />

housing <strong>of</strong> all types, retail, <strong>of</strong>fice, commercial seNices, and civic<br />

uses to create economic and social v11ality and the ability to meet<br />

multiple needs in compact areas;<br />

2. Develop mixed use areas that are safe, and attractive to<br />

pedestrians;<br />

Page 15 March 20, 2012


FRP 12-01<br />

3. Provide flexibility in the siting and design <strong>of</strong> new development and<br />

redevelopment to optimize the use <strong>of</strong> natural resources, energy<br />

alternatives, improvements in development tools and tech[liques,<br />

and changes in the marketplace;<br />

4. Recognize streets as public places that encourage pedestrian,<br />

bicycle, and transit use;<br />

5. Facilitate efficient use <strong>of</strong> land by encouraging compact,<br />

high-density development and minimizing the amount <strong>of</strong> land that<br />

is needed for surface parking; and<br />

6. Encourage and facilitate development that supports public transit<br />

and the utilization <strong>of</strong> alternative modes <strong>of</strong> transportation.<br />

Finding: The refinement plan is consistent with the intent and purpose<br />

established for the "Mixed Use" designation under the <strong>Salem</strong> Area<br />

Comprehensive <strong>Plan</strong>. The proposed plan calls for a pedestrian-friendly<br />

development with a mix <strong>of</strong> high-density residential and neighborhood-scale<br />

commercial development providing a range <strong>of</strong> housing options, significant open<br />

space and natural resource protections, connections with existing transit and<br />

integration with future development in the vicinity <strong>of</strong> the site. Residential densities<br />

included in the plan are within the density requirements established for the<br />

'Mixed-Intensity' (MI) overlay area <strong>of</strong> the FMU zone pursuant to SRC 143C.11 0.<br />

b. Mixed Use Development Goal: To provide a mixture <strong>of</strong> complementary<br />

land uses that may include housing, retail, <strong>of</strong>fices, service, industrial and<br />

civic uses, to create economic and social vitality.<br />

Finding: The plan calls for a complementary mix <strong>of</strong> residential and nonresidential<br />

uses and seeks to create a comfortable and attractive environment<br />

and promote walkability by siting high-density residential uses within close<br />

proximity to neighbor-scale commercial uses, and adjacent to the commercial<br />

and mixed-use development contemplated in the 'Village Center' to the north <strong>of</strong><br />

the plan area. The refinement plan provides a high degree <strong>of</strong> economic flexibility<br />

and potential for entrepreneurship by allowing the full range <strong>of</strong> FMU-zone uses<br />

per SRC Table 143C-1.<br />

The proposed residential development includes a variety <strong>of</strong> multi-family unit<br />

options that will be priced to attract tenants <strong>of</strong> varied income levels, living styles<br />

and family types. The applicant states that the proposed multi-family housing is<br />

intended to complement existing single-family development in the FMU zone and<br />

support development <strong>of</strong> a d.iverse community as envisioned in the <strong>Fairview</strong><br />

Master <strong>Plan</strong>. The multi-family housing and commercial areas will be located<br />

across Lindburg Road SE from the 'Village Center' area approved in <strong>Fairview</strong><br />

<strong>Refinement</strong> <strong>Plan</strong> II, and are designed as a thoughtful transition between the civic,<br />

commercial, and mixed use developments contemplated in the 'Village Center'<br />

and the lower-intensity housing to the south and west as contemplated in the<br />

Master <strong>Plan</strong>. The proposal therefore conforms to this comprehensive plan goal.<br />

c. Mixed Use Development Policy 1 (Development/: Encourage efficient<br />

use <strong>of</strong> land by facilitating compact, high-density development and<br />

minimizing the amount <strong>of</strong> land that is needed to accommodate automobt7e<br />

parking. ·<br />

Page 16 March 20, 2012


. '<br />

FRP 12-01<br />

Mixed Use Development Policy 2 (Development!: Encourage<br />

development that preserves open space.<br />

Finding: The plan calls for residential densities <strong>of</strong> approximately 14-17 units per<br />

acre, which is consistent with the range <strong>of</strong> 7-35 units per acre required for<br />

development within the FMU zone in the 'Mixed Intensity' (MI) overlay under<br />

SRC 143C.11 0 The applicant proposes an <strong>of</strong>f-street parking ratio <strong>of</strong> 1.73 spaces<br />

per residential unit. This ratio will result in on-site. parking substantially below the<br />

maximum 2.6 spaces per unit that is allowable under SRC 133.100(b), thus<br />

minimizing <strong>of</strong>f street parking to practical levels necessary to make economic use<br />

<strong>of</strong> the property.<br />

The refinement plan design also protects nearly one quarter <strong>of</strong> the plan area<br />

(approximately 10 acres) as open space. Regarding the preservation <strong>of</strong> open<br />

space, the proposal draws upon the following key principles from the <strong>Fairview</strong><br />

Master <strong>Plan</strong>: Respect the Landscape; Eliminate Impact to the Regional<br />

Watershed; Layer the Systems; Close the Cycle <strong>of</strong> Energy and Material Flows;<br />

and establish Green Corridors for People and Other Living Things. In addition to<br />

these principles the refinement plan will meet or exceed the <strong>City</strong>'s provisions for<br />

protecting trees and vegetation, addressing landslide hazards, and preserving<br />

wetlands. According the Tree Conservation <strong>Plan</strong> submitted by the applicant, the<br />

proposal preserves 68 percent <strong>of</strong> the existing trees on the site, and showcases<br />

protections for the <strong>Oregon</strong> White Oaks identified as 'Significant Tree Stand<br />

Number 16' in the <strong>Fairview</strong> Master <strong>Plan</strong>, Natural Resources Inventory. The<br />

efficient use <strong>of</strong> land afforded by concentrating residential development in highdensity<br />

multi-family structures, and the proposed layout <strong>of</strong> the streets and site<br />

infrastructure allow the plan to preserve the 'green corridors' contemplated in the<br />

<strong>Fairview</strong> Master <strong>Plan</strong> and contribute significantly to the overall residential density<br />

and open space requirements <strong>of</strong> the FMU zone under to SRC 143C.070. The<br />

plan preserves large areas <strong>of</strong> open space and significant natural features<br />

identified in the <strong>Fairview</strong> Master <strong>Plan</strong>, and is consistent with the goals and<br />

policies <strong>of</strong> the Comprehensive <strong>Plan</strong>.<br />

d. Mixed Use Development Policy 3 (Priorities for Mobility and Access):<br />

Facilitate development (land use mix, density, connectivity, design, and<br />

orientation) that reduces the need for, and frequency <strong>of</strong>, SOV trips and<br />

supports public transit where applicable.<br />

Mixed Use Development Policy 4 (Priorities for Mobility and Access):<br />

Reinforce streets as public places that encourage pedestrian and bicycle<br />

travel.<br />

Mixed Use Development Policy 5 (Priorities for Mobility and Access):<br />

Provide roadway and pedestrian connections to residential areas.<br />

Finding: The street system proposed in the plan provides roadway connections<br />

to all residential, commercial and open space areas identified in the refinement<br />

plan in addition to the 'Village Center' approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II to<br />

the north. The plan also calls for a network <strong>of</strong> <strong>of</strong>f-street, multi-use, pathways and<br />

trails to provide diverse mobility options within the pedestrian network, greater<br />

connectivity between the streetscape and residential, commercial and open<br />

space areas, and promote non-SOV travel within the refinement plan area and<br />

Page 17 March 20, 2012


surrounding land uses. In addition, the massing and design <strong>of</strong> the proposed<br />

multi-family developments are intended to reinforce an active pedestrian<br />

environment adjacent to the future 'Village Center;' with more intense<br />

development clustered adjacent to the 'Main Entry' at Lindburg Road SE as<br />

indicated in the <strong>Fairview</strong> Master <strong>Plan</strong>.<br />

Furthermore, the applicant has provided a transit plan (page 24) demonstrating<br />

that all development within the refinement plan area will be located within 14 mile<br />

<strong>of</strong> existing and .future <strong>Salem</strong>-Keizer Transit District bus lines, which in concert<br />

with the proposed street network ensures the availability <strong>of</strong> a variety <strong>of</strong><br />

transportation options for future residents and businesses within and surrounding<br />

the plan area. The proposal provides for pedestrian and bicycle connectivity and<br />

presents urban form, infrastructure and site design elements that promote a<br />

community design that reduces dependency upon single-occupancy-vehicle<br />

(SOV) trips, supports transit usage and allows efficient movement <strong>of</strong> people and<br />

goods. The plan therefore conforms to these Comprehensive <strong>Plan</strong> policies.<br />

With the exception <strong>of</strong> Lindburg Road SE bordering the property to the north,<br />

streets within. the plan area are proposed to meet the cross-section for a 'local<br />

street' as identified in the <strong>City</strong>'s Transportation System <strong>Plan</strong> (TSP), which is<br />

designed to promote neighborhood access and circulation. Lindburg Road SE<br />

will be constructed to the standards <strong>of</strong> 'Collector Street 2' and 'Collector Street 3'<br />

as approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II. The approval for <strong>Fairview</strong><br />

<strong>Refinement</strong> <strong>Plan</strong> II included a condition specifying that "sharrows" striping and<br />

signage be provided to accommodate and direct bicycles in the travel lane <strong>of</strong> the<br />

street. Simpson Hills LLC is responsible for construction <strong>of</strong> a portion <strong>of</strong> Lindburg<br />

Road SE. Therefore, to maintain consistency in the street design for Lindburg<br />

Road SE, the following condition <strong>of</strong> approval shall apply:<br />

Condition 1: For the portion <strong>of</strong> Lindburg Road SE that it is the responsibility <strong>of</strong><br />

Simpson Hills LLC to construct, provide "sharrows" striping and<br />

signage to accommodate and direct bicycles in the travel lane <strong>of</strong><br />

the street.<br />

The 'local street' cross-section, to which all internal street will be constructed,<br />

includes 5-foot wide pedestrian sidewalks buffered from vehicle traffic by an 8foot<br />

wide planter strip and shade trees (page 20). The TSP also notes that onstreet<br />

parking is allowed on 'local streets,' which promotes traffic calming and<br />

may further buffer the pedestrian system from vehicle traffic. In addition, the<br />

proposed pedestrian connections between the multi-family buildings and the<br />

streetscape, and minimization <strong>of</strong> street setback where practical, reinforce the role<br />

<strong>of</strong> streets as public places that encourage pedestrian and bicycle travel. The<br />

plan is consistent with these policies <strong>of</strong> the Comprehensive <strong>Plan</strong>.<br />

e. Mixed Use Development Policy 6 (Design!: Develop commercial and<br />

mixed-use areas that are safe, comfortable and attractive to pedestrians.<br />

Mixed Use Development Policy 7 (Design!: Provide flexibility in the<br />

siting and design <strong>of</strong> new developments, facilities, and redevelopment to<br />

respond to changes in the marketplace and infrastructure systems.<br />

Finding: In keeping with the principles and vision <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong><br />

the proposal seeks to promote walkability by siting high-density residential uses<br />

Page 18 March 20, 2012


within close proximity to neighborhood-scale commercial uses, and adjacent to<br />

the commercial and mixed-use development contemplated in the 'Village Center'<br />

to the north <strong>of</strong> the plan area. The refinement plan maintains a high degree <strong>of</strong><br />

flexibility and potential for market responsiveness by allowing the full range <strong>of</strong><br />

FMU-zone uses per SRC Table 143C-1 and diversifying the housing stock within<br />

the FMU zone to include high-density multi-family development. The applicant's<br />

proposal maintains flexibility in infrastructure requirements for future<br />

development in the FMU zone by layering stormwater systems within open space<br />

and green corridor.s, thus minimizing impacts <strong>of</strong> future system upgrades,<br />

maintenance and design modifications on the built environment, therefore<br />

meeting these Comprehensive <strong>Plan</strong> policies. ·<br />

f. Mixed Use Development Policy 8 (Development): Provide appropriate<br />

transitions between mixed-use areas and adjacent single-use ·<br />

neighborhoods.<br />

Finding: The refinement plan area is not located adjacent to existing single-use<br />

neighborhoods. The multi-family housing and commercial areas identified in the<br />

plan will be located across Lindburg Road SE from the 'Village Center' area<br />

approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II, and are designed as an appropriate<br />

transition between the civic, commercial, and mixed use developments<br />

contemplated in the Center and future lower-intensity housing to the south and<br />

west <strong>of</strong> the site as contemplated in the Master <strong>Plan</strong>. Therefore, the proposed<br />

plan conforms to this policy.<br />

2. The compatibility <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong> with adjoining land uses.<br />

Finding: The mix <strong>of</strong> residential and commercial uses proposed within the<br />

refinement plan area is not located adjacent to existing, incompatible land uses.<br />

As stated previously, an <strong>Oregon</strong> Youth Authority correctional facility (Hillcrest<br />

School) is located to the east <strong>of</strong> the site across Reed Road SE, undeveloped<br />

portions <strong>of</strong> the FMU zone abut the plan area to the south and west, and property<br />

immediately to the north <strong>of</strong> the site is approved for development as a portion <strong>of</strong><br />

the 'Village Center' envisioned in the <strong>Fairview</strong> Master <strong>Plan</strong>.<br />

The refinement plan calls for predominantly high-density residential uses<br />

adjacent to a limited-scale commercial area, within which the full range <strong>of</strong> uses<br />

allowed in the FMU-zone may be established. The proposal is designed to<br />

encourage commercial development adjacent to higher capacity streets and in<br />

close proximity to more intensive commerciaL development in the future 'Village<br />

Center' area to the north. The massing and design <strong>of</strong> the proposed multi-family<br />

developments are intended to contribute toward an active pedestrian<br />

environment adjacent to the future 'Village Center,' foster sense-<strong>of</strong>-place, and<br />

provide an appropriate transition between the center and the lower-density<br />

residential uses contemplated in the <strong>Fairview</strong> Master <strong>Plan</strong> to the south and west<br />

<strong>of</strong> the refinement plan area. As discussed earlier in this report,. the plan provides<br />

for street and pedestrian connectivity with adjoining portions <strong>of</strong> the FMU-zone<br />

and surrounding land uses. The proposed development will complement<br />

adjoining land uses as envisioned in the <strong>Fairview</strong> Master <strong>Plan</strong>. Therefore, the<br />

proposed plan conforms to this policy.<br />

3. The physical feasibility <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong> with existing or proposed<br />

infrastructure and services.<br />

FRP 12-01 Page 19 March 20, 2012


FRP 12-01<br />

Finding: The proposed development will be required to provide new<br />

infrastructure including sewer, water, storm drainage, and a transportation<br />

network to meet the needs <strong>of</strong> the development. The Public Works Department<br />

has commented that the proposed water and sewer systems are addressed in<br />

the <strong>Fairview</strong> Development District approval and are adequate to serve the<br />

refinement plan area. The applicant proposes to construct and dedicate all<br />

streets within the refinement plan area as public streets. With the exception <strong>of</strong><br />

Lindburg Road SE bordering the property to the north, all internal streets will be<br />

improved as· proposed to meet the cross-section for a 'local street' as identified in<br />

the <strong>City</strong>'s Transportation System <strong>Plan</strong> (TSP). Lindburg Road SE will be<br />

constructed to the standards <strong>of</strong> 'Collector Street 2' and 'Collector Street 3' as<br />

approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II. To ensure feasibility with existing and<br />

proposed infrastructure and services the following conditions <strong>of</strong> approval shall<br />

apply:<br />

Condition 2: . Street trees on public streets shall meet the requirements <strong>of</strong> SRC<br />

Chapter 86 Street Trees.<br />

Condition 3: All stormwater facilities serving public rights-<strong>of</strong>-way shall be public<br />

and maintained by the <strong>City</strong>.<br />

Condition 4: Proposed "B" Street south <strong>of</strong> lots 2 and 3 shall be improved in<br />

accordance with the 'local street' cross section <strong>of</strong> the TSP at the<br />

time Lot 4 or Lot 5 is developed. The half-street improvement<br />

west <strong>of</strong> the centerline shall be improved with Lot 4; and the halfstreet<br />

improvement east <strong>of</strong> the centerline shall be improved with<br />

Lot 5. Specific design elements <strong>of</strong> the street, such as drainage<br />

and street lighting, shall be addressed at the time <strong>of</strong> construction<br />

plan approval.<br />

4. Conformance with the following goals:<br />

(A) To encourage innovative planning that results in more mixed-use<br />

development, improved protection <strong>of</strong> open spaces and natural features,<br />

and greater housing and transportation options.<br />

Finding: The refinement plan calls for a mix <strong>of</strong> residential and non-residential<br />

uses characterized by a variety <strong>of</strong> housing options, neighborhood-scale<br />

commercial development and recreational opportunities. The plan preserves<br />

significant natural features on the site as identified in the <strong>Fairview</strong> Master <strong>Plan</strong><br />

through the layering <strong>of</strong> natural, infrastructure, pedestrian and recreational<br />

systems, protection <strong>of</strong> open space, urban design which preserves identified<br />

viewsheds, and integration with surrounding and planned future development<br />

consistent with the Master <strong>Plan</strong>. Specifically, the plan is designed to facilitate the<br />

following:<br />

1. Provide a mix <strong>of</strong> high-density residential and neighborhood-scale<br />

commercial uses.<br />

2. Preserve and showcase the <strong>Oregon</strong> White Oak grove identified as<br />

'Significant Tree Stand Number 16' in the <strong>Fairview</strong> Master <strong>Plan</strong><br />

Page 20 March 20, 2012


FRP 12-01<br />

3.<br />

4.<br />

5.<br />

6.<br />

Natural Resources Inventory as a 'Main Entry' feature at the<br />

intersection <strong>of</strong> Lindburg Road SE and Reed Road SE.<br />

Contribute substantially to the stated goals <strong>of</strong> the <strong>Fairview</strong> Master<br />

<strong>Plan</strong> to provide 1,600-2,000 housing units (plan calls for 441<br />

housing units) and 20 acres <strong>of</strong> natural open space (plan calls for<br />

6.9 acres <strong>of</strong> natural open space) within the FMU-zone.<br />

Facilitate the efficient use <strong>of</strong> land by encouraging compact<br />

high-density development (14 to 17 dwelling units per acre) that is<br />

supportive <strong>of</strong> mass transit.<br />

Re-use on-site building materials to the maximum extent practical.<br />

Provide for a neighborhood scale mix <strong>of</strong> <strong>of</strong>fice I commercial uses<br />

that will enhance and encourage business and employment<br />

opportunities that support the local economy.<br />

The proposal plan encourages a mix <strong>of</strong> residential and commercial uses,<br />

improved protection <strong>of</strong> open spaces and natural features, and diversifies housing<br />

and transportation options within the FMU zone, therefore satisfying this goal.<br />

(B) To encourage the innovative integration <strong>of</strong> park and school uses.<br />

Finding: The <strong>Salem</strong> Keizer School District has reviewed the proposal and did<br />

not indicate the need for a new elementary school in this location. However,<br />

educational uses are allowable within the Ml overlay <strong>of</strong> the FMU zone pursuant<br />

to SRC Table 143C-1, thus retaining the potential for future establishment <strong>of</strong> an<br />

educational use within the refinement plan area.<br />

Under UGA permit No. 04-8 the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> Parks Department indicated that a<br />

5 acre neighborhood park is needed within the entire <strong>Fairview</strong> site because it is<br />

underserved. The applicant is providing a 10 acres <strong>of</strong> open space and green<br />

corridor areas that will be privately owned and maintained, and publicly<br />

accessible via a network <strong>of</strong> trails and multi-use pathways. The <strong>City</strong> Parks and<br />

Transportation Division has reviewed this proposal, and the adopted Parks<br />

Master <strong>Plan</strong> does indicate the need for a neighborhood, community and large<br />

urban park in the southeast portion <strong>of</strong> the Morningside Neighborhood. However,<br />

Parks and Transportation staff has indicated that the location <strong>of</strong> parks on the plan<br />

is 'deliberately ambiguous' so as to depict opportunity areas while not<br />

designating particular properties for parks acquisition. Parks and Transportation<br />

staff has not indicated that the public parks contemplated in the Parks Master<br />

<strong>Plan</strong> or UGA 04-8 would be required within the refinement plan area.<br />

Because the refinement plan area has not been identified by the <strong>Salem</strong>-Keizer<br />

School District and the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> Parks and Transportation Division as a<br />

desired location for a new school or public park, the goal <strong>of</strong> encouraging the<br />

innovative integration <strong>of</strong> park and school uses is not applicable in this case.<br />

(C) To encourage the principles <strong>of</strong> sustainable development and sustainable<br />

business practices.<br />

Finding: The proposed plan encourages the principles <strong>of</strong> sustainable<br />

development and sustainable business practices by preserving open space and<br />

significant natural features (wetlands, trees, viewsheds, and drainage ways),<br />

promoting energy-efficient compact development, encouraging recycling, utilizing<br />

Page 21 March 20, 2012


FRP 12-01<br />

innovative 'layering' approaches to the management <strong>of</strong> stormwater and open<br />

spaces, and the re-use <strong>of</strong> on-site building materials. This goal is therefore<br />

satisfied.<br />

(D) To support affordable housing options and mixed-income neighborhoods.<br />

Finding: The refinement plan calls for high-density multi-family development to<br />

complement the existing single-family housing stockwithin the FMU zone and<br />

foster greater consistency <strong>of</strong> development within the FMU-zone with the housing<br />

goals <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>. The applicant notes that the multi-family<br />

developments will feature a variety <strong>of</strong> unit types to meet the needs <strong>of</strong> tenants <strong>of</strong><br />

diverse income levels, family types, and life stages as is called for in the Master<br />

<strong>Plan</strong>. The proposed multi-family housing will result in mixed income and active<br />

neighborhoods in the FMU zone designed to take advantage <strong>of</strong> the retail and<br />

employment opportunities the development will create, therefore satisfying this<br />

goal.<br />

(E) To facilitate the resourceful use <strong>of</strong> land through the efficient arrangement<br />

<strong>of</strong> land uses, buildings, circulation systems, open space and ·<br />

infrastructure.<br />

Finding: The proposed plan calls for a mix <strong>of</strong> residential and non-residential<br />

uses characterized by a variety <strong>of</strong> housing options, neighborhood-scale<br />

commercial development and recreational opportunities. The applicant notes<br />

that the proposed multi-family development will minimize building footprints<br />

relative to residential densities and maximize opportunities for open space and<br />

natural resource preservation. As documented previously in this report, the<br />

refinement plan also fosters efficient land use and utility infrastructure design<br />

through the layering <strong>of</strong> open space, stormwater management infrastructure,<br />

pedestrian facilities and recreational systems. Open space areas <strong>of</strong> the plan<br />

provide recreation areas for future residents and promote the protection <strong>of</strong> West<br />

Middle Fork <strong>of</strong> Pringle Creek and its associated wetlands and the existing mature<br />

stands <strong>of</strong> trees. The plan facilitates the resourceful use <strong>of</strong> land through the<br />

efficient arrangement <strong>of</strong> land uses, buildings, circulation systems, open space<br />

and infrastructure, therefore satisfying this goal.<br />

(F) To encourage economic opportunities that comply with and support<br />

business practices.<br />

Finding: The proposal encourages economic opportunities in the<br />

FMU zone and the refinement plan area through the establishment <strong>of</strong> a<br />

neighborhood-scale commercial center adjacent to housing and the higherintensity<br />

civic, commercial and <strong>of</strong>fice uses envisioned in the 'Village Center'<br />

overlay zone <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>. In order to maximize economic<br />

flexibility within the plan area the proposal also allows the full range <strong>of</strong> FMU-zone<br />

uses per SRCTable 143C-1. The inclusion <strong>of</strong> non-residential development in<br />

close proximity to high-density residential uses and the higher-intensity<br />

commercial 'core' <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong> area encourages economic<br />

opportunities that support business practices, therefore satisfying this goal.<br />

(G) To recognize the historic significance <strong>of</strong> buildings, structures and sites,<br />

including archaeological sites, through appropriate means, including, but<br />

not limited to, obtaining <strong>of</strong>ficial historic resource designation.<br />

Page 22 March 20, 2012


FRP 12-01<br />

Finding: The applicant's submittal includes documentation and standards for<br />

above -and below-ground historic and archaeological resources on the property.<br />

The submittal indicates that one existing structure, a well house, is located within<br />

the refinement plan area. The <strong>Fairview</strong> Master <strong>Plan</strong>, Existing Building Reuse<br />

<strong>Plan</strong>, categorizes this structure for "Deconstruction: Primarily for deconstruction<br />

with the option for reuse." The applicant has indicated that this structure will be<br />

retained, if possible, within the western 'green corridor' depicted in the plan<br />

document. The proposal also documents that several structures were previously<br />

removed from the Simpson Hills property. Permits were issued in 2009<br />

authorizing demolition <strong>of</strong> Benton, Steel and Martin Halls on the subject site.<br />

These structures, categorized for "Deconstruction: Primarily for deconstruction<br />

with the option for reuse" on the <strong>Fairview</strong> Master <strong>Plan</strong>, Existing Building Reuse<br />

<strong>Plan</strong>, were removed to facilitate future economic use <strong>of</strong> the properties. Pursuant<br />

to <strong>Oregon</strong> State Historic Preservation Office (SHPO) standards the applicant has<br />

included historical documentation for the demolished structures in Appendix 2 <strong>of</strong><br />

the submitted refinement plan.<br />

The Simpson Hills, LLC property has also been the subject <strong>of</strong> 2004, 2009 and<br />

2010 archeological investigations to assess above -and below-ground cultural<br />

resources on the former <strong>Fairview</strong> Training Center site. The applicant has<br />

included a copy <strong>of</strong> the 2010 Cultural Resources Investigation for the northern<br />

portion <strong>of</strong> the site as Appendix 4 <strong>of</strong> the refinement plan submittal. <strong>Refinement</strong><br />

<strong>Plan</strong> Figure 17 (page 37) provides an overview <strong>of</strong> identified and potential<br />

historical and archeological resources on the Simpson Hills property and within<br />

the refinement plan area. Historical and archaeological investigations conducted<br />

to-date have not indicated the presence <strong>of</strong> significant cultural resources on the<br />

site. The applicant has included an 'Inadvertent Discovery <strong>Plan</strong>' as Appendix 1<br />

<strong>of</strong> the refinement plan to ensure the protection <strong>of</strong> below-ground archaeological<br />

resources within the plan area. A copy <strong>of</strong> <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill was<br />

submitted to SHPO on February 28, 2012.<br />

The proposed plan includes required historical resource documentation for<br />

review by SHPO, provides a detailed accounting <strong>of</strong> cultural resources identified<br />

on the properties to-date, and specifies a protocol and standards. for the<br />

inadvertent discovery <strong>of</strong> significant archaeological resources on the property.<br />

Compliance with SHPO requirements will be coordinated between the applicant<br />

and SHPO staff. The plan therefore complies with this goal.<br />

(H) . To encourage energy conservation and improved air and water quality.<br />

Finding: The proposed development provides for housing, commercial<br />

development and recreational opportunities for the residents <strong>of</strong> the development<br />

thus reducing the need for travel in terms <strong>of</strong> energy consumption. The applicant<br />

notes that the proposed multi-family developments will feature energy efficient<br />

lighting in all common areas and apartment units, and that multi-family units are<br />

very energy efficient when compared to single family homes because the units<br />

are grouped together and stacked to reduce the building's heat loss and air<br />

infiltration by minimizing the percentage <strong>of</strong> exterior wall and ro<strong>of</strong> area when<br />

compared with individual detached dwelling units.<br />

Stormwater will be managed through on-site infiltration the extent possible given<br />

soil capacity constraints on the site. To accomplish this, the plan calls for a<br />

stormwater attenuation area to be constructed adjacent to several existing<br />

wetlands within a 6.01-acre 'natural' open space area. The proposed plan<br />

Page 23 March 20, 2012


CONCLUSION<br />

provides for energy-efficient development and designates open space and<br />

preserves the environmental quality <strong>of</strong> the property by protecting natural features<br />

on the site identified in the <strong>Fairview</strong> Master <strong>Plan</strong>, Natural Resource Inventory.<br />

The plan therefore complies with this goal.<br />

Based on the facts and findings presented herein, staff concludes that subject to satisfying the<br />

proposed conditions <strong>of</strong> approval, the proposed refinement plan satisfies the criteria for approval.<br />

RECOMMENDATION<br />

Staff recommends that the <strong>Plan</strong>ning Commission adopt the facts and findings <strong>of</strong> the staff report<br />

and APPROVE, by resolution, the following action for the subject property located north <strong>of</strong> the<br />

intersection <strong>of</strong> Battle Creek Road and Reed Road SE (Marion County Assessor's Map and Tax<br />

Lot numbers: 083W11 I 00300 & 00400):<br />

A. That the proposed <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill, a refinement plan for a portion <strong>of</strong> the<br />

<strong>Fairview</strong> Training Center property approximately 43.2 acres in size be APPROVED,<br />

subject to the following conditions:<br />

Condition 1: For the portion <strong>of</strong> Lindburg Road SE that it is the responsibility <strong>of</strong><br />

Simpson Hills LLC to construct, provide "sharrows" striping and signage<br />

to accommodate and direct bicycles in the travel lane <strong>of</strong> the street.<br />

Condition 2: Street trees on public streets shall meet the requirements <strong>of</strong> SRC Chapter<br />

86 Street Trees.<br />

Condition 3: All stormwater facilities serving public rights-<strong>of</strong>-way shall. be public and<br />

maintained by the <strong>City</strong>.<br />

Condition 4: Proposed "B" Street south <strong>of</strong> lots 2 and 3 shall be improved in<br />

accordance with the 'local street' cross section <strong>of</strong> the TSP at the time Lot<br />

4 or Lot 5 is developed. The half-street improvement west <strong>of</strong> the<br />

centerline shall be improved with Lot 4; and the half-street improvement<br />

· east <strong>of</strong> the centerline shall be improved with Lot 5. Specific design<br />

elements <strong>of</strong> the street, such as drainage and street lighting, shall be<br />

addressed at the time <strong>of</strong> construction plan approval.<br />

Attachments: 1.<br />

2.<br />

FRP 12-01<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

Vicinity Map<br />

Proposed <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill (including appendices 1 and 3, all<br />

other appendices available upon. request)<br />

Public Hearing Notice and Map<br />

Public Works memorandum, dated March 12, 2012<br />

<strong>Salem</strong> Fire Department memorandum, dated March 12, 2012<br />

<strong>Salem</strong>-Keizer School District memorandum, dated March 12, 2012<br />

Comments from Sam Hall, Managing Member <strong>of</strong> Su)3tainable <strong>Fairview</strong><br />

Associates, dated March 12, 2012<br />

Comments from the Pringle Creek Watershed Council, dated March 12,<br />

2012<br />

Page 24 March 20, 2012


F AIRVIEVV HILLS<br />

REFINEMENT PLAN<br />

Prepared for<br />

SIMPSON HILLS, LLC<br />

Revised February 17, 2012<br />

ENGINEERING & FORESTRY<br />

528 Cottage Street NE, Suite 204B<br />

<strong>Salem</strong>, <strong>Oregon</strong> 97301<br />

(503) 400-6028<br />

ATTACHMENT 2


TABLE OF CONTENTS<br />

Project Team ...................................................................... ..... ........................................ 4<br />

Introduction .. .. .................................................................................................... .. .......... 5<br />

Illustrative Site <strong>Plan</strong> (1) ................................................ ................ ...... ........................... 12<br />

General Allocation & ldenfication <strong>of</strong> Major Proposed Land Uses (2) .. ......................... 15<br />

Name, Location & Extent <strong>of</strong> Existing or Proposed Major Streets (3) ........................ .... 17<br />

Typical Street Sections (4) ..................................................... ............. ....... ................... 19<br />

Permitted Land Uses (5) .. .............................................. ............................................... 25<br />

Development Standards for FMU Zones (6) .. .... .. .. .................................. ...... ............... 25<br />

Standards for Conservation <strong>of</strong> Natural Resources (7) .... .................. ............................. 32<br />

Wetland and Tree Inventory (8) ............ ........................................................ .. .. ........... 34<br />

Methods <strong>of</strong> Protection for Natural Features (9) .. .. ...... .................. ............................... 36<br />

Maintenance <strong>of</strong> Infrastructure (10) ...... .. .......... .. ...... .. .............. .................................... 39<br />

Construction Phasing <strong>of</strong> Streets (11) .... .. ........ .. ...... .. .............................. ...................... 39<br />

Standards for Phasing <strong>of</strong> Public Utilities (12) .......... ............ .......................................... 41<br />

Phasing Schedule (13) .......................... ..... .............................................. ....... ............ ... 42<br />

Financial Assurances (14) ...................................................... .... .............................. ...... 44<br />

Extent the <strong>Refinement</strong> <strong>Plan</strong> Supplements & Supersedes<br />

Adopted <strong>City</strong> Regulations (15) .......... .............................. ................ ........ ...................... 45<br />

Standards for Interpreting the <strong>Refinement</strong> <strong>Plan</strong> (16) .......................... ....... .................. 45<br />

Design Guidelines & Approval Process (17) ................................. ................................. 45<br />

General Landscape <strong>Plan</strong> (18) .. ................................... .. ................................................. 46<br />

General Drainage <strong>Plan</strong> (19) ................. .............................................. ............................ 49<br />

Traffic Impact Analysis Report (20) .... ........................................................................... 51<br />

Impacts on Existing Structures & Other Development (21) .......................................... 52<br />

Impacts on Existing Infrastructure & Public Services (22) ............................................. 54<br />

Location & Extent <strong>of</strong> Sanitary Sewer, Storm Drainage & Utilities (23) ......................... 54<br />

Existing "Historically Significant" Resources (24) ...................... .................................... 56<br />

(#)References <strong>Salem</strong> Revised Code (SRC} 143C.100(e) required elements <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong>s.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

2


Appendices<br />

1. Inadvertent Discovery <strong>Plan</strong><br />

2. SHPO Letter & Documentation .<br />

3. February 7, 2012- Kittelson & Associates Trip Generation Analysis<br />

4. September 9, 2010- Applied Archeology Research Cultural Resources Investigation<br />

5. February 3, 2012- GeoPacific Geotechnical Investigation<br />

6. January 12, 2012- GeoPacific Geological Hazard Assessment Report<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

3


• Provisions for barrier free (accessibility) adaptability within all the ground floor units,<br />

barrier free recreational amenities, and barrier free parking stalls to meet and/or<br />

exceed federal and state regulations are planned.<br />

• The anticipated recreational amenities in each development include indoor gathering<br />

spaces and an exercise area and exterior gathering areas for celebrations and family<br />

functions, swimming poot spa, tennis court, and play areas for children. These<br />

amenities will appeal to all age groups and <strong>of</strong>fer diverse recreational opportunities.<br />

2. Create a Center<br />

• The <strong>Refinement</strong> <strong>Plan</strong> creates a focal point "Main Entry" leading into the community at<br />

the Lindburg Road SE and Reed Rd. intersection.<br />

• Natural linkages including "Green Corridors" with multi-use trails are planned to<br />

converge into the hollow "palm" located in the center <strong>of</strong> the former <strong>Fairview</strong> Training<br />

Center site.<br />

• The focal point "Main Entry, "Green Corridor" linkages, and public st reets/ sidewalks<br />

connections included in the <strong>Refinement</strong> <strong>Plan</strong> help achieve t he Center that is<br />

envisioned in t he adopted Master <strong>Plan</strong> .<br />

3. Re-Use, Retr<strong>of</strong>it<br />

• The <strong>Refinement</strong> <strong>Plan</strong> incorporates sustainable site development practices by reu se <strong>of</strong><br />

existing on-site materials such as rock I gravel t o minimize material import and haul<br />

<strong>of</strong>f.<br />

4. Create Local Employment<br />

• A small commercial node is included in the <strong>Refinement</strong> <strong>Plan</strong> area. The mix <strong>of</strong> land<br />

uses included in the <strong>Refinement</strong> <strong>Plan</strong> is permitted and encouraged by the FMU Ml<br />

Overlay zone. The proposed commercial node is conveniently located within walking<br />

distance <strong>of</strong> the future multi-family residential areas. When the local population is<br />

capable <strong>of</strong> supporting commercial land uses in the future, small scale <strong>of</strong>fice and retail<br />

buisinesses can be established in the commercial node. This is supportive <strong>of</strong> the local<br />

employment creation principle established in the adopted <strong>Fairview</strong> <strong>Plan</strong>.<br />

5. Build Innovative Green Buildings<br />

• The multi-family homes (apartment buildings) will be built to meet and exceed<br />

current state and/or model energy code requirements. Energy efficient lighting will<br />

be provided at all common areas and apartment units where possible within the<br />

<strong>Refinement</strong> <strong>Plan</strong> area . Multi-family units are very energy efficient when compared to<br />

single family homes because the apartment units are grouped together and stacked<br />

to reduce the building's heat loss and air infiltration by minimizing the percentage <strong>of</strong><br />

exterior wall and ro<strong>of</strong> area when compared with individual detached dwelling unit<br />

'" <strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

6


allow for on-site infiltration to the extent possible, given soil capabilties. Multi-family<br />

home (apartment) projects can have higher rates <strong>of</strong> recycling with lower volumes <strong>of</strong><br />

refuse when appropriate recycling areas and refuse compactors are provided. Each<br />

project will be provided with a central refuse compactor system that reduces the<br />

volume <strong>of</strong> refuse. Covered recycling areas conveniently located adjacent to the<br />

compactor will be also be provided.<br />

10. Green Corridors for People and Other Living Things<br />

• As described herein and as illustrated in the figures found throughout this<br />

<strong>Refinement</strong> <strong>Plan</strong>, the "Green Corridors" included in the adopted Fa irview Master <strong>Plan</strong><br />

are proposed in this application. These corridors include the complex layering <strong>of</strong><br />

habitat and wetland areas, drainage way preservation, passive open space, and<br />

appropriate recreational use allowing for pedestrian I bicycle mobility that was<br />

envisioned in the Master <strong>Plan</strong>.<br />

11. Transit Close at Hand<br />

• The <strong>Refinement</strong> <strong>Plan</strong> includes an interconnected public street I sidewalk system that<br />

blends with <strong>of</strong>f-site properties and follows existing on-site topography I contours to<br />

the extent possible. As illustrated throughout this <strong>Refinement</strong> <strong>Plan</strong> document, this<br />

system includes "B" Street which is proposed to serve as a connection to Transit<br />

Service on Battlecreek Road SE. In addition, the multi-family projects include a<br />

convenient system <strong>of</strong> pedestrian connections that allow for resident access to the<br />

surrounding public street sytem. A transit plan is included as Figure 13 showing the<br />

location <strong>of</strong> existing and potential future transit lines.<br />

12.An Interconnected Street System<br />

• The <strong>Refinement</strong> <strong>Plan</strong> includes an interconnected public street I sidewalk system that<br />

blends with <strong>of</strong>f-site properties and follows existing on-site topography I contours to<br />

the extent possible. A shadow plan is included in the Refinment <strong>Plan</strong>. As envisioned<br />

in the Master <strong>Plan</strong>, the shadow plan shows the high degree <strong>of</strong> connectivity that is<br />

proposed within the Refinment <strong>Plan</strong> area and that is anticipated for the surrounding<br />

area.<br />

13. Walk Every Day<br />

• As illustrated by the figures contained in this document, the <strong>Fairview</strong> Hills <strong>Refinement</strong><br />

<strong>Plan</strong> includes a multi-layered system <strong>of</strong> sidewalks, multi-use pathways, and<br />

pedestrian connections. This ensures a very walkable community as envisioned in the<br />

Master <strong>Plan</strong>.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

8


In addition to being consistent with the Principles <strong>of</strong> the adopted <strong>Fairview</strong> Master <strong>Plan</strong>,<br />

the <strong>Fairview</strong> Hills <strong>Refinement</strong> <strong>Plan</strong> is also compatible and consistent with the <strong>Salem</strong> Area<br />

Comprehensive <strong>Plan</strong>. The <strong>Refinement</strong> <strong>Plan</strong> accomplishes this by:<br />

• Allowing housing opportunities that support affordable housing for a diverse range <strong>of</strong><br />

incomes mixed with a complementary neighborhood scale commercial I <strong>of</strong>fice use;<br />

• Developing the property in a manner that is convenient, safe, and attractive to<br />

pedestrians;<br />

• Providing public streets that allow for public pedestrian and bicycle circulation and<br />

access to mass transit on the existing Battle Creek Road and <strong>Fairview</strong> Industrial Drive<br />

routes;<br />

• Faci litating the efficient use <strong>of</strong> land by encouraging compact high-density<br />

development (13 to 17 dweling units per acre) that is supportive <strong>of</strong> mass transit;<br />

• Large open space areas that protect significant trees, wetlands, and provide for<br />

recreational opportunities;<br />

• Compatibility with adjoining uses such as the <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II through the<br />

collaborative development <strong>of</strong> Lindburg Road SE;<br />

• Implementation <strong>of</strong> necessary infrastructure and services such as transporation (as<br />

described above), sanitary sewer, stormwater management, and water services, etc;<br />

• Encourages high densities and sustainable site development practices and efficient<br />

use <strong>of</strong> land as describe above, as well as utilization <strong>of</strong> construction techniques and<br />

management practices that will control soil erosion and stream sedimentation;<br />

• Providing for a neighborhood scale mix <strong>of</strong> <strong>of</strong>fice/commercial that will enhance and<br />

encourage economic opportunities that support the local economy;<br />

• Including energy efficient multi-family construction that meets modern energy codes<br />

with comparatively reduced energy consumption needs;<br />

• Improving air and water quality through preservation <strong>of</strong> significant trees and inclusion<br />

<strong>of</strong> generous open space areas; and a substantial stormwater attenuation area;<br />

• Complies with the requirements <strong>of</strong> the FMU zone and other applicable <strong>City</strong> standards<br />

except where refinements to said standards are established herein; and<br />

• Offers diverse recreational opportunities for residents such as childrens play areas,<br />

recreation centers, sport-court, multi-use path, etc.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

9


The development <strong>of</strong> the <strong>Refinement</strong> <strong>Plan</strong> area will occur over time in phases as outlined<br />

in Sections (11) and (13).<br />

GENERAL ALLOCATION AND IDENTIFICATION OF MAJOR<br />

PROPOSED LAND USES (2)<br />

The general allocation <strong>of</strong> major land uses follows the adopted <strong>Fairview</strong> Master <strong>Plan</strong> and<br />

Figure 143C-2 <strong>of</strong> the SRC, with only one zone (MI) present in this <strong>Refinement</strong> <strong>Plan</strong> area as<br />

shown on Figure 7 below.<br />

• Mixed-Intensity (MI)<br />

o Residential uses and neighborhood commercial, employment, and civic<br />

uses.<br />

o 7 to 35 dwelling units per gross acre for all residential development in the<br />

FMU zone.<br />

o No building used exclusively for a non-residential use shall have a building<br />

footprint greater than 6,000 square feet for non-residential development.<br />

The <strong>Refinement</strong> <strong>Plan</strong> area also includes several open space areas comprised <strong>of</strong> two<br />

natural drainages, wetlands, trees, and stormwater quality/detention area .<br />

The May 2011 <strong>Salem</strong>-Keizer Housing Needs Analysis 2012 to 2032 prepared for the Mid­<br />

Willamette Valley Council <strong>of</strong> Governments states that "<strong>Salem</strong> has a deficit <strong>of</strong> multifamily<br />

land" and needs approximately "3,283 dwelling units". The <strong>Refinement</strong> <strong>Plan</strong> density and<br />

proposed uses outlined below help to reduce this multifamily deficit.<br />

• Apartments I Multi-family Residential<br />

o Lot 1 (15.43± gross acres): 219± units= 14± dwelling units per gross acre<br />

o Lot 2 (13.40± g·ross acres): 222± units= 17± dwelling units per gross acre<br />

• Neighborhood Commercial, Employment and/or Civic Uses<br />

o Lot 3 (9.81± gross acres): 24,000± square feet <strong>of</strong> buildings including a mix<br />

<strong>of</strong> parking, open space, natural areas, and a stormwater facility.<br />

The above number <strong>of</strong> units and commercial building square footage are approximate as<br />

the final numbers may vary depending on market demand.<br />

This provides an overall residential use density <strong>of</strong> 15± units/acre with approximately<br />

441± residential units on 28.83± gross acres <strong>of</strong> land; and no commercial building<br />

footprint exceeding 6,000 square feet in conformance with Table 143C-1 "non-<br />

' · <strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

15


NAME, LOCATION AND EXTENT OF EXISTING OR PROPOSED<br />

MAJOR STREETS (3)<br />

The refinement area street network consists <strong>of</strong> a series <strong>of</strong> local streets accessing the<br />

principal collector street (Lindburg Road SE), approved as part <strong>of</strong> the <strong>Fairview</strong><br />

<strong>Refinement</strong> <strong>Plan</strong> II, as well as Battle Creek Road SE (minor arterial) and Reed Road SE<br />

(minor arterial). All streets proposed within the <strong>Refinement</strong> <strong>Plan</strong> area will be dedicated<br />

to the public and constructed in conformance with <strong>City</strong> <strong>of</strong> Sa lem local street standards<br />

with the exception <strong>of</strong> Lindburg Road SE.<br />

Lindburg Road SE will be constructed in accordance with the <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II<br />

from Reed Road west along the north <strong>Fairview</strong> Hills property line in a cooperative effort<br />

between Simpson Hil ls, LLC and Sustainable <strong>Fairview</strong> Associates (SFA).<br />

Development <strong>of</strong> Lot 2 will include construction <strong>of</strong> a local street ("B" Street") with a 30<br />

foot wide paved street section from Lindburg Road SE south to Battle Creek Road . The<br />

typical section for "B" Street along the Lot 2 frontage will include curbs, pavement, and<br />

required utilities along with sidewalks, street trees, and lighting on the west side only<br />

(Lot 2 frontage). The sidewalks, street trees, and lighting along the Lot 3 frontage on "B"<br />

Street (east side) will be installed with the Lot 3 development (building permit). Figures 9<br />

and 10 in Section (4) below provide further clarification on the "B" Street improvements<br />

associated with Lot 2 development (building permit). Curbs, sidewalks, street trees,<br />

lighting, and utilities for "B" Street south <strong>of</strong> "2nd" Street will be constructed as part <strong>of</strong> a<br />

subsequent <strong>Refinement</strong> <strong>Plan</strong> and development (building permit) for the southern portion<br />

<strong>of</strong> the <strong>Fairview</strong> Hills property.<br />

The Lot 3 frontage on Reed Road from Lindburg Road SE south to "2nd" Street will be<br />

improved and right-<strong>of</strong>-way dedicated in accordance with the Preliminary Declaration for<br />

Urban Growth Area Development Permit No. 04-8 (UGA) approved by the <strong>City</strong> <strong>of</strong> <strong>Salem</strong><br />

on August 4, 2011 at the time <strong>of</strong> building construction on Lot 3.<br />

The remainder <strong>of</strong> the future internal street network shown within the refinement area<br />

will be built to <strong>City</strong> local street standards as required with development (building permit)<br />

for each lot as outlined in Section (11).<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

17


TYPICAL STREET SECTIONS (4)<br />

The streets within the <strong>Refinement</strong> <strong>Plan</strong> area are necessary and will serve many users,<br />

including future residents within the site, existing and future residents surrounding the<br />

site, service providers (including emergency vehicles, transit providers (including school<br />

bus, <strong>Salem</strong>-Keizer transit}, etc. Public ownership and maintenance <strong>of</strong> streets providing<br />

public access and benefits as described above provide the best public safety, provide<br />

flexibility for transit shelters/ stops, allow for economical future maintenance, ensure a<br />

minimum practical design life <strong>of</strong> 20 years, and handle the typical traffic needs <strong>of</strong> the <strong>City</strong><br />

<strong>of</strong> <strong>Salem</strong>.<br />

Public streets will increase affordability to the future residents within the <strong>Refinement</strong><br />

<strong>Plan</strong> area. This is due to the fact that private road maintenance assessments and fees<br />

that are necessary for private streets are not required for public streets. Such costs<br />

result in increased rents or dues which are ultimately born by future residents.<br />

Therefore, a system <strong>of</strong> publicly owned and maintained streets is supportive <strong>of</strong> the<br />

<strong>Fairview</strong> <strong>Plan</strong>'s stated goal <strong>of</strong> increased housing affordability. The <strong>City</strong> adopted typical<br />

street sections call for a planter strip for ground cover and street trees with the goal <strong>of</strong><br />

providing shade tree lined streets. Traditional planter strips reduce on-going<br />

maintenance costs and provide for a safe level area where pedestrian activity is<br />

occurring. The Public Works Department would allow the planter strips to be storm<br />

water facilities <strong>of</strong> some type but will not allow the standard curb and gutter to be<br />

eliminated and still accept the streets as public. This makes the incorporation <strong>of</strong> storm<br />

water facilities in the planter strip more challenging and creates a significant increase in<br />

on-going maintenance for the already strained <strong>City</strong> maintenance budget. Without<br />

regular maintenance planter strip storm water facilities tend to collect trash, debris,<br />

become overgrown with noxious weeds, plug, cease to function as designed due to lack<br />

<strong>of</strong> maintenance and then overflow across sidewalks and curbs. The depression <strong>of</strong> the<br />

planter strip for storm water facilities also challenges pedestrian and pet activity due to<br />

the wet nature <strong>of</strong> the planter and generally uneven ground. The traditional planter strips<br />

in the <strong>City</strong> Transportation Master <strong>Plan</strong> provide for the safest, low maintenance, and most<br />

cost effective long term solution while at the same time creating a usable pedestrian and<br />

pet area .<br />

The streets should be public <strong>City</strong> streets built to public <strong>City</strong> standards as illustrated in the<br />

cross sections provided below. Multi-use pathways will generally conform to the typical<br />

sections illustrated below. Together, the proposed street system (including public<br />

sidewa lks) and multi-use path system supports a variety <strong>of</strong> transportation choices for<br />

moving people that is safe, convenient, efficient, and economical.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

19


.-<br />

VARIES: 1 0' -15'<br />

,f--- PAVED PATH - ------,r<br />

MULll-USE PATH<br />

NOT TO SCALE<br />

Figure 11: Conceptual multi-use path cross section<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

22


Figure 12: Conceptual trail cross section<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

NOT TO SCALE<br />

23


PERMilTED LAND USES (5)<br />

The overlay designation within the <strong>Refinement</strong> <strong>Plan</strong> area is Mixed-Intensity (MI) as<br />

designated on the FMU Overlay Pfan (Figure 143C-2) and generally described in SRC<br />

143C.040.(b). Permitted uses are as identified in Table 143C-1 <strong>of</strong> <strong>Salem</strong> Revised Codes<br />

(SRC) Chapter 143C, including refinements in Section (6), as <strong>of</strong> the date <strong>of</strong> submittal <strong>of</strong><br />

this <strong>Refinement</strong> <strong>Plan</strong>. The Ml overlay permitted uses include all typical residential uses<br />

and a variety <strong>of</strong> neighborhood commercial, employment, and civic uses. Permitted uses<br />

<strong>of</strong> land as well as applicable residential densities are described in Section (2). It is<br />

understood that the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> is currently in the process <strong>of</strong> developing a policyneutral<br />

code re-write changing from SIC to 'use' based classifications. Based upon this<br />

understanding, the uses currently permitted in the FMU zone (including those proposed<br />

in this refinement plan) will continue to be permitted upon completion <strong>of</strong> the <strong>City</strong> Code<br />

update. Please also refer to Sections (6) and (15) for additional information regarding<br />

permitted uses.<br />

DEVELOPMENT STANDARDS FOR FMU ZONES (6)<br />

Development standards, regulations and guidelines in this <strong>Refinement</strong> <strong>Plan</strong> incorporate<br />

the general intent <strong>of</strong> the adopted <strong>Fairview</strong> Master <strong>Plan</strong> and provide for development<br />

consistent with the <strong>Fairview</strong> Mixed Use (FMU) zone per SRC Chapter 143C.<br />

Development will comply with the pertinent sections <strong>of</strong> the SRC including, but not<br />

limited to, Chapters 68, 69, 125, 126, 130, 131, 132, 133, and 143C, as well as the<br />

Development Design Handbook (DOH), unless modified herein. Commercial<br />

development within the <strong>Refinement</strong> <strong>Plan</strong> Area will comply with the development<br />

standards <strong>of</strong> SRC 153 as well as other pertinent section <strong>of</strong> the SRC. A goal <strong>of</strong> the<br />

<strong>Refinement</strong> <strong>Plan</strong> is to meet the existing standards except where deviations will result in<br />

an improved project design, increased opportunities for economic development, and/or<br />

compliance is otherwise impracticable due to existing conditions such as topographic<br />

grade, tree preservation, wetlands, and finish grade transition requirements.<br />

Multi-family development will either meet the standards contained in the <strong>City</strong> <strong>of</strong> <strong>Salem</strong><br />

Development Design Handbook (DOH) including compliance with the refinements below<br />

or will be reviewed by the <strong>Plan</strong>ning Commission pursuant to the DOH guidelines and SRC<br />

Chapter 120.<br />

The following is a summary <strong>of</strong> the refinements to the <strong>Salem</strong> Revised Codes (SRC) and <strong>City</strong><br />

<strong>of</strong> <strong>Salem</strong> Development Design Handbook (DOH).<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

25


'<br />

Figure 15A: Example Building Front Offset for refinement to DDH 2.E.4.b.1) as indicated<br />

in the above table<br />

Figure 15B: Example Building Back Offset for refinement to DDH 2.E.4.b.1) as indicated<br />

in the above table<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

30


2' TO 4' DEEP OFFSETS<br />

Figure 15C: Example Building Front Offset for refinement to DDH 2.E.4.b.1} as indicated<br />

in the above table<br />

Figure 15D: Example Building Back Offset for refinement to DDH 2.E.4.b.1} as indicated<br />

in the above table<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

31


Surface Water<br />

Two existing uphill drainage basins (shown on Figure 22) discharge to the <strong>Fairview</strong> Hills<br />

property through existing culverts crossing underneath Battle Creek Road SE. Infiltration<br />

testing has been performed by GeoPacific Engineering, Inc. in several areas throughout<br />

the <strong>Fairview</strong> Hills property. This testing illustrates that infiltration rates vary from 0.1 to<br />

0.5 inches per hour or less throughout the property, making the degree <strong>of</strong> infiltration<br />

that was envisioned in the <strong>Fairview</strong> Master <strong>Plan</strong> impractical. The pertinent sections <strong>of</strong><br />

the GeoPacific Geotechnical Investigation report have been included in the Appendix.<br />

Therefore, the <strong>Refinement</strong> <strong>Plan</strong> area incorporates a storm water attenuation area<br />

allowing for natural infiltration to the extent possible, and that provides responsible onsite<br />

storm water management that accommodates the existing <strong>of</strong>f-site flows from across<br />

Battle Creek Road.<br />

The stormwat er facility will be designed as an extended dry basin that provides both<br />

water quant ity attenuation and water quality treatment that is appropriate for this<br />

setting given the existing soils, hydrology, topogra phy, and surrounding environment. It<br />

will be designed in accord ance wit h t he Low Impact Development Approaches Handbook<br />

adopted by Clean Water Services <strong>of</strong> Washington County.<br />

The facility will be integrated into the surrounding landscaping and will appear as a<br />

shallow landscaped depression wit h a flat bottom t hat collects and holds stormwater<br />

run<strong>of</strong>f, allowing pollutants to settle and filter out as· the water infiltrates into the ground<br />

(to the extent possible) prior to release. The entire facility area, including side slopes and<br />

treatment area will feature vegetation that is appropriate for the varying conditions<br />

within the extended dry basin. Vegetation will be established through dense plantings<br />

which will include a variety <strong>of</strong> native plants as well as non-invasive ornamentals that<br />

provide aesthetic and functional value. Species will be selected to assure successful<br />

establishment based on climate, soil type, and moisture tolerance. Selections will be<br />

made to ensure that they are harmonious with the surrounding sensitive areas and<br />

existing vegetation.<br />

Soils<br />

Minimization <strong>of</strong> potential erosion <strong>of</strong> the on-site soils is critical to protecting local<br />

streams, wetlands) and drainage cou rses. Development will comply with <strong>City</strong> <strong>of</strong> <strong>Salem</strong><br />

erosion control standards. Construction areas disturbing more than one (1) acre shall<br />

obtain a National Pollutant Discharge Elimination System (NPD ES) 1200C permit from the<br />

<strong>Oregon</strong> Department <strong>of</strong> Environmental Quality (DEQ). Pro<strong>of</strong> <strong>of</strong> a valid DEQ permit must<br />

be submitted to the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> prior to issuance <strong>of</strong> building permits. GeoPacific<br />

Engineering, Inc. has completed a Geological Hazard Assessment Report for the site<br />

which has been included in the Appendix.<br />

"' <strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

33


Reuse <strong>of</strong> on-site Materials<br />

Construction will reuse the substantial amount <strong>of</strong> gravel and crushed rock piles that<br />

currently exist from prior work on the property when feasible. Utilizing this material for<br />

road bases, trenches and structural backfill will reduce the need for importing these<br />

materials thereby reducing the impact <strong>of</strong> construction traffic on local roads and<br />

infrastructure. The reuse <strong>of</strong> materials will also help reduce the carbon footprint.<br />

Vegetation<br />

Vegetative cover is crucial to the health <strong>of</strong> the soil structure and the animals that<br />

traditionally inhabit the South <strong>Salem</strong> hills. Establishment and re-establishment <strong>of</strong><br />

vegetation native to the area is important to the successful maintenance <strong>of</strong> natural<br />

areas. Re-establishment <strong>of</strong> vegetation within the limits <strong>of</strong> construction will also be<br />

critical to minimizing the potential for erosion and shall be incorporated into<br />

construction drawings for development within the <strong>Refinement</strong> <strong>Plan</strong> area.<br />

Wildlife<br />

The incorporation <strong>of</strong> open space and re-establishment <strong>of</strong> vegetation native to the<br />

Willamette Valley will provide habitat inviting local wildlife to share in the diversity <strong>of</strong> the<br />

site that is not typically present in other development projects.<br />

WETLAND AND TREE INVENTORY (8)<br />

Wetlands<br />

The wetland map (Exhibit 4 - Figure 5) included in the Natural Resources Inventory <strong>of</strong> the<br />

<strong>Fairview</strong> Master <strong>Plan</strong> is outdated. The wetland map prepared by W&H Pacific in 2003<br />

and approved by the Department <strong>of</strong> State Lands (DSL) on July 15, 2004 expired July 15,<br />

2009. PBS Engineering+ Environmental was retained to complete a wetland delineation<br />

<strong>of</strong> the <strong>Fairview</strong> Hills property in 2009. The PBS wetland delineation was submitted to DSL<br />

and the U.S. Army Corps <strong>of</strong> Engineers (USACE) on September 1, 2009 which was<br />

approved by DSL on June 1, 2010 and the USACE on July 6, 2010. The DSL issued a<br />

removal/fill permit for the site which identifies the areas <strong>of</strong> permanent and temporary<br />

impacts and outlines the mitigation requirements for the entire <strong>Fairview</strong> Hills property.<br />

Several wetlands will remain on the property and be incorporated into the site's open<br />

space. The wetlands regulated by the current permit are shown on Figures 16 and 17.<br />

Tree Inventory<br />

A certified pr<strong>of</strong>essional arborist evaluated the trees on the <strong>Fairview</strong> Hills property. Trees<br />

were identified by species, type, size and general condition. The <strong>Refinement</strong> <strong>Plan</strong> area<br />

has several existing trees that will be retained in accordance with the <strong>City</strong> approved May<br />

"" <strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

34


, .<br />

METHODS OF PROTECTION FOR NATURAL FEATURES (9)<br />

Historic Structures<br />

The site contains no designated historic structures. The State <strong>of</strong> <strong>Oregon</strong> Archaeologist<br />

issued a letter dated July 7, 2009, a copy <strong>of</strong> which is included in the Appendix, stating<br />

" ... the project will have no effect on any known cultural resources. No further<br />

archaeological research is needed with this project." In order to further protect any<br />

potential discovery <strong>of</strong> cultural resources and to comply with state law an inadvertent<br />

discovery plan is included in the Appendix and shall be included as part <strong>of</strong> the<br />

construction documents for every development on the property.<br />

Natural Features<br />

Mature trees existing at the property and existing wetland areas will be protected for<br />

incorporation into open spaces where possible. A tree inventory for the property was<br />

previously approved by the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> as Tree Variance <strong>Case</strong> No. 09-1. Any<br />

modifications to the previously approved tree conservation plan will be processed as<br />

required by SRC Chapter 68.<br />

Trees<br />

During all clearing, grading and construction activities, protective fencing shall be<br />

installed and maintained around all trees designated for retention by the approved tree<br />

conservation plan for the property including any adjustments thereto. Any heritage or<br />

significant tree shall have protective fencing at least seventy percent <strong>of</strong> a circular area<br />

beneath the tree measuring one foot in radius for every one-inch <strong>of</strong> diameter at breast<br />

height (dbh}, or as otherwise allowed by the project arborist.<br />

View Sheds<br />

The view sheds identified in the adopted <strong>Fairview</strong> Master <strong>Plan</strong> on the western portion <strong>of</strong><br />

the <strong>Refinement</strong> <strong>Plan</strong> area have natural topography that may provide for views to the<br />

north and east. The layout and development <strong>of</strong> this area <strong>of</strong> the <strong>Refinement</strong> <strong>Plan</strong><br />

incorporates the natural topography into the site design to help maintain and/or<br />

enhance views to the north and east where feasible. Figure 18 shows the <strong>Refinement</strong><br />

<strong>Plan</strong> area view sheds in the <strong>Fairview</strong> Master <strong>Plan</strong> context.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

36


MAINTENANCE OF INFRASTRUCTURE ( 1 0)<br />

Streets and infrastructure will be constructed to <strong>City</strong> local street standards, unless<br />

modified herein, and dedicated to the <strong>City</strong> <strong>of</strong> <strong>Salem</strong>. The <strong>City</strong> will be responsible for<br />

maintaining the public right-<strong>of</strong>-way, streets, sidewalks, lights, trees and public utility<br />

infrastructure within the refinement area. The public utility infrastructure typically<br />

includes, but is not limited to, public water, fire hydrants, valves, manholes, sanitary<br />

sewer, cleanouts, storm drain mains, manholes & catch basins, public storm drain facility,<br />

and public street furnishings/trash/recycling cans/etc.<br />

A Property Owner Association (POA} will be created to own and manage privately owned<br />

green corridors (drainages}, pedestrian/bike paths, private site furnishings/trash<br />

cans/recycling, and open space within the refinement area. The POA will establish<br />

operation and maintenance standards for the private infrastructure, perpetual<br />

maintenance <strong>of</strong> any open space, and community amenities.<br />

CONSTRUCTION PHASING OF STREETS ( 1 1)<br />

Street construction phasing will be tied to building permits for development on each lot<br />

within the refinement area. Lots 1, 2, and 3 are located within the <strong>Refinement</strong> <strong>Plan</strong> area.<br />

Lots 4 and 5 are outside <strong>of</strong> the refinement area; however street improvements required<br />

by the <strong>City</strong> as a condition <strong>of</strong> development on these two lots (Lots 4 & 5} is discussed<br />

below to describe how the UGA permit conditions <strong>of</strong> approval are being implemented<br />

and to provide a more complete picture <strong>of</strong> future improvements. We have also included<br />

a discussion <strong>of</strong> anticipated phasing for the remainder <strong>of</strong> the future conceptual internal<br />

street network shown within the <strong>Refinement</strong> <strong>Plan</strong> area.<br />

Lot 1 (Inside <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong> area)<br />

• Linking Street<br />

Improve Lindburg Road SE from "1st" Street to "B" Street in cooperation with SFA and<br />

improve "B" Street from Lindburg Road SE to Battle Creek Road SE.<br />

• Boundary Street<br />

• Improve "A" Street and "1st" Street in cooperation with SFA. (Note: Although "2nd"<br />

Street is along the southern boundary <strong>of</strong> Lot 1, the development <strong>of</strong> Lot 4 will be<br />

required to make the full street improvement.}<br />

• Internal Street<br />

None.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

39


Lot 2 {Inside <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong> area)<br />

• Linking Street<br />

Improve "B" Street from "2nd" Street to Battle Creek Road SE.<br />

• Boundary Street<br />

Improve Lindburg Road SE in cooperation with SFA along the north property frontage<br />

and up to a 3/4 street improvement along the property frontage on "B" Street.<br />

(Note: Although "2nd" Street is along the southern boundary <strong>of</strong> Lot 2, the<br />

development <strong>of</strong> Lot 4 will be required to make the full street improvement.}<br />

• Internal Street<br />

None.<br />

Lot 3 {Inside <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong> area)<br />

• Linking Street<br />

Improve "B" Street from "2nd" Street to Battle Creek Road SE.<br />

• Boundary Street<br />

Improve Lindburg Road SE in cooperation with SFA along the north property frontage<br />

and up to a 3/4 street improvement along the property frontage on "B" Street, "2nd"<br />

Street, and Reed Road SE.<br />

• Internal Street<br />

None.<br />

Lot 4 {Outside <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong> area)<br />

• Linking Street<br />

None.<br />

• Boundary Street<br />

Full street improvement to "2nd" Street from "A" Street to "B" Street. Up to 3/4<br />

street improvement along property frontages on Battle Creek Road SE and "B" Street.<br />

• Internal Street<br />

Full street improvements with all internal streets shown on future plans, unless a<br />

street is planned along the west property boundary as that improvement would be<br />

completed in cooperation with SFA.<br />

Lot 5 {Outside <strong>of</strong> <strong>Refinement</strong> <strong>Plan</strong> area)<br />

• Linking Street<br />

None.<br />

• Boundary Street<br />

Up to 3/4 street improvement along all property frontages <strong>of</strong> "2nd" Street, Battle<br />

Creek Road SE, "B" Street, and Reed Road SE<br />

• Internal Street<br />

'" <strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

40


Phase 3 will preserve and expand the green corridor {drainage) along the east boundary<br />

<strong>of</strong> Lot 1. The conceptual site plan for the planned apartments has incorporated the<br />

natural topography <strong>of</strong> this hillside to capture the north and northeast views. The layout<br />

is ringed following the natural contours <strong>of</strong> the view shed and steps up the hillside<br />

allowing views from most <strong>of</strong> the planned units.<br />

Phase 4 (Lot 1)<br />

Phase 4 would consist <strong>of</strong> the second half <strong>of</strong> the total planned apartment units and final<br />

multi-use path connections to complete the project.<br />

This phase also preserves and expands the green corridor (drainage) along the east<br />

boundary <strong>of</strong> Lot 1. The conceptual site plan for the planned apartments has<br />

incorporated the natural topography <strong>of</strong> this hillside to capture the north and northeast<br />

views. The layout is ringed following the natural contours <strong>of</strong> the view shed and steps up<br />

the hillside allowing views from most <strong>of</strong> the planned units.<br />

Phase 5, 6 and/or 7 (Lot 3)<br />

These phases would consist <strong>of</strong> commercial building(sL parking area(sL possible<br />

stormwater facility expansion/modification, supporting features such as landscaping and<br />

other amenities, and construction <strong>of</strong> Reed Road frontage improvements, a portion <strong>of</strong><br />

"2nd" Street and "B" Street as explained in Section (11). This may occur with all the<br />

buildings being constructed in one phase or with any combination <strong>of</strong> buildings depending<br />

on market conditions at the time <strong>of</strong> development.<br />

The existing wetlands and green corridor (drainage) located on Lot 3 will also be<br />

preserved as part <strong>of</strong> the development. There are no significant view sheds identified<br />

within the limits <strong>of</strong> Lot 3.<br />

Each phase <strong>of</strong> development will stand alone with regards to streets and utilities. No<br />

phase is to be developed without adequate streets and utilities available.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

43


<strong>Fairview</strong> Training Center property. The Infrastructure Agreement is currently being<br />

updated to insure changes in infrastructure project needs are addressed.<br />

EXTENT THE REFINEMENT PLAN SUPPLEMENTS & SUPERSEDES<br />

ADOPTED CITY REGULATIONS ( 1 5)<br />

Specific standards that supplement and supersede <strong>City</strong> regulations are contained in this<br />

<strong>Refinement</strong> <strong>Plan</strong> as outlined previously in the Development Standards for FMU Zones (6).<br />

The provisions <strong>of</strong> the SRC shall apply unless specifically addressed in this <strong>Refinement</strong><br />

<strong>Plan</strong>.<br />

STANDARDS FOR INTERPRETING THE REFINEMENT PLAN ( 16)<br />

Development within the <strong>Refinement</strong> <strong>Plan</strong> area will be designed to meet the intent <strong>of</strong> the<br />

adopted <strong>Fairview</strong> Master <strong>Plan</strong> and the <strong>Fairview</strong> Mixed Use (FMU ) zone code. The FMU<br />

zone, <strong>Fairview</strong> Master <strong>Plan</strong>, and this <strong>Refinement</strong> <strong>Plan</strong> have land use regulations different<br />

from the zoning regulations applicable to other zoning districts and therefore are subject<br />

to the hierarchy established under SRC 143C.050.<br />

DESIGN GUIDELINES AND APPROVAL PROCESS ( 1 7)<br />

Future development will be designed to comply with this <strong>Refinement</strong> <strong>Plan</strong>, the <strong>Salem</strong><br />

Revised Code, and Development Design Handbook for multi-family developments,<br />

including the modifications stated in t his document. The <strong>City</strong> <strong>of</strong> <strong>Salem</strong> will review plans<br />

for conformance and issue approvals. This will occur through submittal <strong>of</strong> subdivision<br />

and site plan review applications, subsequent <strong>Refinement</strong> <strong>Plan</strong>(s) and other standard <strong>City</strong><br />

requirements, as is customary and appropriate.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

45


GENERAL LANDSCAPE PLAN ( 1 8)<br />

Critical elements <strong>of</strong> the general landscape plan include: 1} retention <strong>of</strong> mature trees in<br />

accordance with the <strong>City</strong> approved tree conservation plan, including any amendments<br />

thereto; 2} preservation <strong>of</strong> existing wetlands; and 3} providing opportunities for passive<br />

and active recreational activities. The layouts shown in the <strong>Refinement</strong> <strong>Plan</strong> have<br />

carefully considered opportunities to protect existing trees and wetlands as well as<br />

provide for active and passive recreational activities. Three main landscape types have<br />

been included for the <strong>Refinement</strong> <strong>Plan</strong> area.<br />

• Natural Open Space with wetlands and drainages. Native vegetation is<br />

encouraged within these areas.<br />

• Open Space includes multi-use path and trail areas where active and passive<br />

recreational activities are provided.<br />

• Private Landscape areas falling within the limits <strong>of</strong> private developments.<br />

The multi-family developments will provide Common Open Space within each<br />

development as required by the Development Design Handbook Section 2-Multiple<br />

Family-Open Space A. 2.b (1} (d) (3} is 1,000 S. F. with an additional 250 S.F. for every 20<br />

units. The anticipated Common Open Space for each development is about 4,000 S.F.<br />

and will consist <strong>of</strong> exterior active play areas including children play structures and lawn<br />

areas and swimming pool areas. In addition, Private Open Space will be provided for each<br />

apartment unit as required by the Development Design Handbook Section 2-Multiple<br />

Family-Open Space A.4.b. (1} (a} and (b) or at least 96 S.F. per grade unit in the form <strong>of</strong><br />

patio and adjacent lawn and at least 48 S.F. at units above grade in the form <strong>of</strong> a private<br />

deck.<br />

Common Open Space as required by the Development Design Handbook Section 2-<br />

Multiple Family-Open Space A.2.b (1} (a } and (b) requirement will be at least 30% <strong>of</strong> the<br />

site area. The anticipated amount <strong>of</strong> Common Open Space for each development is in<br />

excess <strong>of</strong> 40% <strong>of</strong> the site area. Common open space includes landscaping, walkways,<br />

play areas, swimming pools, and other areas which provide visual or recreational<br />

amenities for the residents. The amount <strong>of</strong> this open space cannot exceed 15% <strong>of</strong> the<br />

open space requirement when located on existing grade slopes with 25% or more grade<br />

slope.<br />

Natural Open Space will be provided in the two natural drainage areas located on the<br />

property in order to adequately protect this natural resource.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

46


Final delineation <strong>of</strong> the various types <strong>of</strong> open and natural spaces will occur during the<br />

Site <strong>Plan</strong> Review and Design Review, if applicable.<br />

<strong>Plan</strong>t species tolerant <strong>of</strong> soil and hydrologic conditions without ongoing irrigation are<br />

preferred for all landscaping within the refinement area . In addition to incorporation <strong>of</strong><br />

native drought tolerant plant and tree species, private development will be required to<br />

comply with the applicable sections <strong>of</strong> the SRC for landscape standards. The multi-use<br />

path between Lots 1 and 2 w ill include way finding sign age. The landscape plan for the<br />

area surrounding the <strong>Oregon</strong> White Oak grove at the northeast corner <strong>of</strong> the property<br />

will be designed to minimize impacts to the existing trees and/or retain in its current<br />

natural state.<br />

Street trees will be planted in accordance with SRC Chapter 86 to provide shade tree<br />

lined public streets within the limits <strong>of</strong> the <strong>Refinement</strong> <strong>Plan</strong>.<br />

The general landscape plan shown below further illust rat es these concepts. Detailed<br />

landscape plans w ill be submitted when required as pa rt <strong>of</strong> the standard Cit y<br />

requirements for development on each lot.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

47


The <strong>City</strong> <strong>of</strong> <strong>Salem</strong> has not adopted storm water quality standards as <strong>of</strong> the date <strong>of</strong> this<br />

<strong>Refinement</strong> <strong>Plan</strong>. Therefore, stormwater quality treatment <strong>of</strong> run<strong>of</strong>f from impervious<br />

surfaces will be provided for all development within the <strong>Refinement</strong> <strong>Plan</strong> area (43.2±<br />

acres) and the remaining 60.6± acres <strong>of</strong> the <strong>Fairview</strong> Hills property located outside <strong>of</strong> the<br />

<strong>Refinement</strong> <strong>Plan</strong> area in conformance with the applicable policies and procedures <strong>of</strong><br />

Clean Water Services <strong>of</strong> Washington County (CWS) Design and Construction Standards<br />

(R&O 07-20} as <strong>of</strong> the date <strong>of</strong> this <strong>Refinement</strong> <strong>Plan</strong>. This is an example <strong>of</strong> the innovative<br />

solutions being implemented throughout this <strong>Refinement</strong> <strong>Plan</strong>.<br />

Section II. B. <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> Public Works Department Design Standards for<br />

Stormwater Management dated March 16, 2007 states that as interim design standards<br />

for stormwater quality the <strong>City</strong> will accept stormwater quality facilities designed in<br />

accordance with Clean Water Services (CWS} standards. Stormwater run<strong>of</strong>f originating<br />

on the <strong>Fairview</strong> Hills property will be detained in conformance with the <strong>City</strong> <strong>of</strong> <strong>Salem</strong><br />

Public Works Department Design Standards for Stormwater Management dated March<br />

16, 2007 and in effect as <strong>of</strong> the date <strong>of</strong> this <strong>Refinement</strong> <strong>Plan</strong>.<br />

A public extended dry detention basin is planned for the northeast corner <strong>of</strong> the<br />

refinement area (Lot 3} to serve public right-<strong>of</strong>-ways as well as private development<br />

areas for the full build-out <strong>of</strong> the property currently owned by Simpson Hills, LLC (103.8±<br />

acres). The basin will be designed and constructed in accordance with CWS standards to<br />

provide stormwater quality treatment and stormwater quantity management (detentior))<br />

per <strong>City</strong> <strong>of</strong> <strong>Salem</strong> standards as approved by the Public Works Department. The<br />

stormwater discharge location is planned as a new public storm drain outfall to the West<br />

Middle Fork Pringle Creek in the proximity <strong>of</strong> the Lindburg Road SE and Reed Road<br />

intersection.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

50


impact to approximately 12,000 trips. Subsequently, K&A prepared another update on<br />

February 7, 2012 based on the <strong>Fairview</strong> Hills <strong>Refinement</strong> <strong>Plan</strong> which indicates that<br />

approximately 3,390 new daily trips would be generated if the refinement area, upon full<br />

development, matches the conceptual layouts shown. For further information a copy <strong>of</strong><br />

the K&A memorandum has been included in the Appendix.<br />

IMPACTS ON EXISTING STRUCTURES AND OTHER<br />

DEVELOPMENT (2 1)<br />

The <strong>Refinement</strong> <strong>Plan</strong> area is bordered on the north and west by Sustainable <strong>Fairview</strong><br />

Associates {SFA) which is subject to SRC 143C FMU zoning; on the east by Hillcrest Youth<br />

Correctional Facility operated by the <strong>Oregon</strong> Youth Authority {OVA); and on the south by<br />

existing single-family residences. Multi-use pedestrian/bike pathways through the<br />

property are important amenities that will increase recreational opportunities in the<br />

neighborhood. The multi-use paths will coordinate with the <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II.<br />

Future SFA refinement plans and <strong>Fairview</strong> Hills refinement plans will be required to<br />

coordinate with all <strong>City</strong> approved refinement plans and the general intent <strong>of</strong> t he adopted<br />

<strong>Fairview</strong> Master <strong>Plan</strong>.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

52


300 0<br />

-- MULTI-USE PATH<br />

----- CONCEPTUAL MULTI- USE PATH<br />

- - TRAILS<br />

,---, AREA SUBJECT TO<br />

L__J REFINEMENT PLAN<br />

FUTURE PATHWAYS<br />

{FAIRVIEW MASTER PLAN)<br />

FUTURE STREETS<br />

(FAIRVIEW MASTER PLAN)<br />

Figure 24: Conceptual Pedestrian Connectivity, Multi-Use Pathway, & Trail <strong>Plan</strong><br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

53


IMPACTS ON EXISTING INFRASTRUCTURE AND PUBLIC<br />

SERVICES (22)<br />

The Urban Growth Area (UGA) Development Permit (No. 04-8) coupled with the<br />

Infrastructure Agreement (lA) entered into by Sustainable <strong>Fairview</strong> Associates, LLC and<br />

the <strong>City</strong> <strong>of</strong> Sa lem on September 20, 2005 identify the infrastructure improvement needs<br />

required due to the impacts on the existing infrastructure and public services that the<br />

development <strong>of</strong> the former <strong>Fairview</strong> Training Center site will create. The lA provides for<br />

the method <strong>of</strong> financing the infrastructure improvements as well as the timing for<br />

construction based on triggers due to traffic impacts (K&A Memo) as the former <strong>Fairview</strong><br />

Training Center property develops. The refinement area shows development that is<br />

consistent with the adopted <strong>Fairview</strong> Master <strong>Plan</strong> and the impacts to the <strong>of</strong>f-site<br />

infrastructure as outlined in the lA.<br />

LOCATION AND EXTENT OF SANITARY SEWER, STORM<br />

DRAINAGE AND UTILITIES (23)<br />

Water, sanitary sewer, and storm drain main lines will be public and constructed within<br />

street right-<strong>of</strong>-ways or easements as required by <strong>City</strong> standards. Separate public water,<br />

sanitary sewer and storm drain easements outside <strong>of</strong> the right-<strong>of</strong>-ways may be necessary<br />

to serve proposed development. Water, sanitary sewer, and storm drain lines will be<br />

sized in accordance with <strong>City</strong> <strong>of</strong> <strong>Salem</strong> design standards. Power, telephone, gas and<br />

cable lines will be installed within public utility easements following the alignment <strong>of</strong><br />

several <strong>of</strong> the public street right-<strong>of</strong>-ways.<br />

Private sanitary sewer, domestic water, irrigation, fire, storm drains and utilities will be<br />

constructed with development <strong>of</strong> each lot within the <strong>Refinement</strong> <strong>Plan</strong> area. Final designs<br />

will be completed with construction plans for development <strong>of</strong> each lot and submitted to<br />

the <strong>City</strong> <strong>of</strong> Sa lem for review and permitting as required.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

54


------ EXISTING WATER<br />

--NEW STORM DRAIN<br />

--NEW SANITARY SEWER<br />

------ EXISTING SANITARY SEWER<br />

EXISTlNG STORM DRAIN<br />

AREA SUBJECT TO<br />

REFINEMENT PLAN<br />

. j<br />

/<br />

)<br />

)<br />

Figure 25: General Public Utilities Conceptual <strong>Plan</strong><br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

LOT2<br />

FAIRVIEW HILLS<br />

BOUNDARY LINE<br />

55


EXISTING "HISTORICALLY SIGNIFICANT" RESOURCES (24)<br />

The adopted <strong>Fairview</strong> Master <strong>Plan</strong> inventory does not identify buildings, structures or<br />

sites, which possess the criteria for historic resource designation under SRC Chapter<br />

120A.040 or which have been designated as "historically significant", as being located<br />

within the <strong>Refinement</strong> <strong>Plan</strong> area.<br />

As stated in Section 7, there are several potential cultural sites identified in the<br />

Archaeological Cultural Resources Inventory & Assessment {Exhibit 6) <strong>of</strong> the <strong>Fairview</strong><br />

Master <strong>Plan</strong> dated August 2004, as well as Appendix 'A' dated June 2004, which have<br />

been shown on Figure 17. In order to more definitely determine the presence <strong>of</strong> any<br />

cultural resources, two extensive cultural resource investigations that focused on the<br />

103.8± acre <strong>Fairview</strong> Hills project site where conducted including background research,<br />

pedestrian surveys, the excavation <strong>of</strong> 170 shovel test pits, and the use <strong>of</strong> a<br />

magnetometer to locate evidence for historic-era burials. The report makes the<br />

following statements.<br />

"No evidence for burials or a cemetery was uncovered during the fieldwork."<br />

"Despite intensive efforts to locate archaeological deposits, combined results <strong>of</strong> AAR's<br />

surveys suggest that the development area contains very sparse archaeological<br />

• II<br />

remams ...<br />

A copy <strong>of</strong> the September 9, 2010 AAR investigation has been included in the Appendix.<br />

<strong>Fairview</strong> Hills<br />

<strong>Refinement</strong> <strong>Plan</strong><br />

February 17, 2012<br />

56


NOTICE:<br />

THIS DOCUMENT MUST BE AVAILABLE ON SITE AND MUST BE REVIEWED<br />

WITH ALL CONSTRUCTION MANAGERS AND EMPLOYEES INVOLVED IN ANY<br />

EARTHWORK FOR THIS PROJECT.<br />

<strong>Fairview</strong> Hills Development Project<br />

Human Remains Protocol<br />

Treatment <strong>of</strong> Native American and other Human Remains Discovered Inadvertently or<br />

Through Criminal Investigations.<br />

Native American burial sites are not simply artifacts <strong>of</strong> the tribe's cultural past, but are<br />

considered sacred and represent a continuing connection with their ancestors. Native American<br />

ancestral remains, funerary objects, sacred objects and objects <strong>of</strong> cultural patrimony associated<br />

with <strong>Oregon</strong> Tribes are protected under state law, including criminal penalties (ORS 97.740-.994<br />

and 358.905-.961). The laws recognize and codifY the Tribes' rights in the decision-making<br />

process regarding ancestral remains and associated objects. Therefore both the discovered<br />

ancestral remains and their associated objects should be treated in a sensitive and respectful<br />

manner by all parties involved.<br />

Identification <strong>of</strong> Human Remains<br />

• <strong>Oregon</strong> laws (ORS 146.090 & .095) outline the types <strong>of</strong> deaths that require investigation<br />

and the accompanying responsibilities for that investigation. The law enforcement<br />

<strong>of</strong>ficial, district medical examiner, and the district attorney for the county where the death<br />

occurs are responsible for deaths requiring investigation. Deaths that require investigation<br />

include those occurring under suspicious or unknown circumstances.<br />

• If human remains that are inadvertently discovered or discovered through criminal<br />

investigations are not clearly modern, then there is high probability that the remains are<br />

Native American and therefore ORS 97.745(4) applies, which requires immediate<br />

notification with State Police, State Historic Preservation Office, Commission on Indian<br />

Services, and all appropriate Native American Tribes. To determine who the "appropriate<br />

Native American Tribe" the responsible parties shonld contact the Legislative<br />

Commission on Indian Services (CIS). To determine whether the human remains are<br />

Native American the responsible parties should contact the appropriate Native American<br />

• Tribes at the initial discovery. It shonld be noted that there may be more than one<br />

appropriate Native American Tribe to be contacted.<br />

• If the human remains are possibly Native American then the area should be secured from<br />

further disturbance. The human remains and associated objects should not be disturbed,<br />

manipulated, or transported from the original location until a plan is developed in<br />

consultation with the above named parties. These actions will help ensure compliance<br />

with <strong>Oregon</strong> state law that prohibits any person willfully removing human remains and/or<br />

objects <strong>of</strong> cultural significance from its original location (ORS 97.745).<br />

• All parties involved and the appropriate Native American Tribes shall implement a<br />

culturally sensitive plan for reburial.


Notification<br />

• State law [ORS 97.745 (4)] requires that any discovered human remains suspected to be<br />

Native American shall be reported to-<br />

1. State Police (current contact Lt. Steven R. Lane, Department <strong>of</strong> State Police,<br />

<strong>of</strong>fice phone 503-934-0324, cell 503-931-7273<br />

2. AKS Engineering & Forestry, LLC<br />

• Primary Contact- J. Michael Poissant, <strong>of</strong>fice phone 503-400-6028, cell<br />

phone 503-428-3469<br />

• Secondary Contact- Alex Hurley, <strong>of</strong>fice phone 503-925-8799, cell phone<br />

503-407-4536<br />

3. State Historic Preservation Office (SHPO)<br />

• Below-Ground Resources contact- John Pouley, <strong>of</strong>fice phone 503-986-<br />

0675, email john.pouley@state.or.us<br />

• Above-Ground Resources contact- Ian Johnson, <strong>of</strong>fice phone 503-986-<br />

0678, email ian.johnson@,state.or.us<br />

4. Commission on Indian Services (CIS)<br />

• Current contact- Karen Quigley, Director, <strong>of</strong>fice phone 503-986-1067.<br />

Karen will provide the list <strong>of</strong> appropriate Native American Tribes.<br />

5. All appropriate Native American Tribes provided by CIS. This list includes but is<br />

not limited to the following:<br />

• Confederated Tribes <strong>of</strong> Grand Ronde- Eirik Thorsgard, 503-879-1630;<br />

cell971-241-2696<br />

• Confederated Tribes <strong>of</strong> Siletz - Robeli Kentta, 541-444-2532; cell 541-<br />

351-0148<br />

• Confederated Tribes <strong>of</strong> Warm Springs- Sally Bird 541-553-3555<br />

6. Applied Archaeological Research, Inc.<br />

• Primary contact- Bill Roulette, Principal Investigator, <strong>of</strong>fice phone 503-<br />

281-9451<br />

• Secondary contact -Jessica Hale, Project Archaeologist, <strong>of</strong>fice phone 503-<br />

281-9451, cell phone 503-888-9399


1<br />

i<br />

KITTELSON & ASSOCIATES, INC.<br />

TRANSPORTATION ENGINEERING I PLANNING<br />

610 SW Alder Street, Suite 700, Portland, OR 97206 503.228.5230 503.273.8"1 69<br />

MEMORANDUM<br />

Date:<br />

To:<br />

From:<br />

Project:<br />

Subject:<br />

February 7, 2012<br />

Matt Harrell<br />

Simpson Hills LLC<br />

2260 McGilchrist Street SE<br />

<strong>Salem</strong>, <strong>Oregon</strong> 97302<br />

Chris Tiesler, P.E.<br />

Sustainable <strong>Fairview</strong> Development- <strong>Fairview</strong> Hills<br />

Phase II Trip Generation Analysis<br />

This memorandum serves to update trip generation estimates for the <strong>Fairview</strong> Hills portion <strong>of</strong><br />

Phase II <strong>of</strong> the Sustainable <strong>Fairview</strong> development located between Battle Creek Road SE, Reed<br />

Road SE, and Strong Road SE in <strong>Salem</strong>, <strong>Oregon</strong>. Simpson Hills has revised their land use plan<br />

since the last trip generation analysis (memorandum prepared by Kittelson & Associates, Inc.!).<br />

Phase II follows the first phase <strong>of</strong> development (Pringle Creek Community -September 2005) and<br />

continues to follow the Sustainable <strong>Fairview</strong> Development <strong>Plan</strong>, previously submitted and<br />

approved by the <strong>City</strong> <strong>of</strong> <strong>Salem</strong>.<br />

The purpose <strong>of</strong> this memorandum is update the number <strong>of</strong> Phase II daily, weekday a.m., and<br />

weekday p.m. peak hour net new site-generated trips generated by the new <strong>Fairview</strong> Hills plan,<br />

and determine if any transportation improvements identified in the development's Area Facilities<br />

<strong>Plan</strong> will be required as a result.<br />

The Pringle Creek Community development (Phase I) generated 1,770 net new daily trips and did<br />

not trigger any <strong>of</strong>f-site transportation improvements according to the Area Facilities <strong>Plan</strong> (see<br />

Attachment "A"). Phase II <strong>of</strong> the development is anticipated to generate approximately 5,190<br />

additional net new daily trips. Based on the Area Facilities <strong>Plan</strong>, this will trigger two <strong>of</strong>f-site<br />

transportation improvements (sum <strong>of</strong> Phase I & Phase II net new daily trips).<br />

DEVELOPMENT PlAN<br />

Sustainable <strong>Fairview</strong> Associates LLC and Simpson Hill LLC propose to develop the next phase <strong>of</strong><br />

the Sustainable <strong>Fairview</strong> mixed-use development incorporating additional <strong>of</strong>fice and retail land<br />

1 Kittelson & Associates, Inc. Sustainable <strong>Fairview</strong> Development - Phase Il Trip Generation Analysis. July 22,<br />

2009.<br />

FILENAME: K:\H_PORTLAND\PROJFILE\12243- SIMPSON HILLS TRIP GENERATION<br />

LETTER\REPORT\FINAL \12243_MEMO_FINAL.DOC


Sustainable <strong>Fairview</strong> Development - <strong>Fairview</strong> Hills<br />

February 7, 2012<br />

Project#: 12243<br />

Page2<br />

uses, a private K-8 school, a public park, and a mixture <strong>of</strong> residential dwellings. An exact<br />

breakdown <strong>of</strong> the size, number, and mixture <strong>of</strong> these land uses is presented in the next section <strong>of</strong><br />

this memorandum.<br />

TRIP GENERATION<br />

Kittelson & Associates, Inc. (KAI) prepared estimates <strong>of</strong> daily, weekday a.m., and weekday p.m.<br />

peak hour vehicle trip ends for Phase II <strong>of</strong> site development based on empirical observations at<br />

similar land uses. These observations are summarized in the standard reference Trip Generation,<br />

Slh Edition, published by the Institute <strong>of</strong> Transportation Engineers (Reference 1 ). This<br />

methodology is consistent with the methodology followed in the Sustainable <strong>Fairview</strong><br />

Development <strong>Plan</strong>.<br />

As the data represented in the ITE trip generation manual is primarily collected at suburban<br />

locations with little or no transit service and minimal pedestrian or bicycle facilities, the process<br />

likely overestimates the trip generation <strong>of</strong> the proposed mixed-use development. To adjust for<br />

this, trip generation estimates were reduced by ten percent to represent this multi-modal<br />

development. The ten percent reduction is consistent with the Transportation <strong>Plan</strong>ning Rule<br />

(TPR) policies and the <strong>City</strong> <strong>of</strong> <strong>Salem</strong> agreed to its application in this case.<br />

The Trip Generation Handbook, published by the Institute <strong>of</strong> Transportation Engineers (Reference 2)<br />

provides estimates for pass-by and internal trips. Internal trip reductions for each identified land<br />

use were based on the mixed-use nature ·<strong>of</strong> the proposed development. The mix <strong>of</strong> land uses<br />

proposed in Phase II is roughly equivalent and consistent with the original Sustainable <strong>Fairview</strong><br />

Development <strong>Plan</strong>; as such, the same internal trip reductions were applied accordingly. The passby<br />

reduction is only applicable to the retail component <strong>of</strong> the development; as such, pass-by trips<br />

were deducted from the total trips generated by the retail use. These reductions were subtracted<br />

from the total site-generated trips to calculate the final net new trips attributable to the site.<br />

Table 1 summarizes the estimated site trip generation during a typical weekday as well as during<br />

the weekday a.m. and p.m. peak hours for Phase II <strong>of</strong> the development. Trip generation estimates<br />

shown in the table below are rounded to the nearest five trips.<br />

Kittelson & Associates, Inc. Portland, <strong>Oregon</strong>


Sustainable <strong>Fairview</strong> Development - <strong>Fairview</strong> Hills<br />

February 7, 2012<br />

Table 1<br />

Estimated Trip Generation - Phase II<br />

Project#: 12243<br />

Page 3<br />

ITE Size Daily<br />

Weekday AM Peak Hour Weekday PM Peak Hour<br />

Land Use Code (s.f./units) Trips Total In Out Total In Out<br />

.<br />

<strong>Fairview</strong> Hills<br />

Apartment 2,850 225 45 180 280<br />

220 450 units<br />

Internal Trips (5%) (140) (10) (5) (5) (10)<br />

Shopping Center 1,030 25 15 10 90<br />

820 24,000 s.f.<br />

Pass-By (34%} (350) (10) (5) (5) (30)<br />

Sustainable <strong>Fairview</strong><br />

Private School (K-8)<br />

500<br />

1,3801 455 250 205 300<br />

534<br />

Internal Trips (4%)<br />

students<br />

(60} (20) (10) (10) (10)<br />

General Office 550 80 70 10 75<br />

710 50,000 s.f.<br />

Internal Trips ( 4%) (20) (5) (5) (0) (5)<br />

Specialty Retail 890 0 0 0 70<br />

814 20,000 s.f.<br />

Pass-By (34%}' (300} (0) (0) (0) (20)<br />

<strong>City</strong> Park 3 10 0 0 0 0<br />

411 5 acres<br />

Internal Trips ( 4%) (0) (0) (0} (0) (0)<br />

Total Site-Generated Trips (Phase II) 6,710 785 380 405 815<br />

Total Internal Trips (220) (35) (20} (15) (25)<br />

10% TPR Reduction (650) (75) (35) (40) (80)<br />

Total Pass-By Trips (650) (10) (5) (5) (50)<br />

NET NEW TRIPS (Phase II) 5,190 665 320 345 660<br />

Phase I Net New Trips - September 2005<br />

NET NEW TRIPS (Phase I) 1,770 140 40 100 160<br />

TOTAL NET NEW TRIPS (Phase I + Phase II)<br />

TOTAL NET NEW TRIPS 6,960 805 360 445 820<br />

1 Dally trips estimated based on the relationship <strong>of</strong> p.m. peak hour trips to daily trips <strong>of</strong> ITE #530 (Elementary School). No daily<br />

trip data is available for ITE #534.<br />

2 Pass-by rate taken from ITE #820. No pass-by rate Is available for ITE #814.<br />

3 No ITE data is provided for a.m. or p.m. peak hours. Given the relatively small size <strong>of</strong> the park and its central location within the<br />

development, no net new vehicle trips are assumed to occur during the weekday a.m. or p.m. peak hours.<br />

As shown in Table 1, Phase II <strong>of</strong> the development is anticipated to generate approximately 5,190<br />

net new daily trips. Of these trips, 665 (320 in/345 out) are anticipated during the weekday a.m.<br />

peak hour and 660 (335 in/325 out) are anticipated during the weekday p.m. peak hour. Overall,<br />

Phases I and II combined are estimated to generate 6,960 net new daily trips.<br />

Kittelson & Associates, Inc. Portland, <strong>Oregon</strong><br />

180<br />

(5)<br />

45<br />

(15)<br />

140<br />

(5)<br />

15<br />

(0)<br />

30<br />

(10)<br />

0<br />

(0)<br />

410<br />

(10)<br />

(40)<br />

(25)<br />

335<br />

95<br />

430<br />

100<br />

(5)<br />

45<br />

(15)<br />

160<br />

(5)<br />

60<br />

(5)<br />

40<br />

(10)<br />

0<br />

(0)<br />

405<br />

(15)<br />

(40)<br />

(25)<br />

325<br />

65<br />

390


Sustainable <strong>Fairview</strong> Development - <strong>Fairview</strong> Hills<br />

February 7, 2012<br />

AREA FACILITIES PLAN<br />

Project#: 12243<br />

Page 4<br />

The development team and <strong>City</strong> <strong>of</strong> <strong>Salem</strong> have collectively developed an Area Facilities <strong>Plan</strong> for<br />

the entire Sustainable <strong>Fairview</strong> development to identify specific required public improvements<br />

and the trigger for each improvement. Table 2 summarizes the improvements triggered by Phase<br />

II.<br />

Table 2<br />

Area Facilities <strong>Plan</strong> - Anticipated Off-Site Improvements<br />

Trigger<br />

Required Public Improvement (Net New Daily Trips) Estimated Cost•<br />

Battle Creek Road SE/Kuebler Boulevard SE<br />

- Construct eastbound and westbound right-turn lanes<br />

within the existing right-<strong>of</strong>-way. 2,000 $300,000<br />

-Traffic signal modifications to allow protected<br />

permissive left-turns and right-turn overlap phasing.<br />

25th Street SE[Madrona Avenue SE<br />

- Realign Mad rona Avenue SE with 25'" Street SE and<br />

Airway Drive SE with Madrona Avenue SE. 6,000 $3,000,000 2<br />

- Widen Madrona Avenue SE to a five-lane crosssection<br />

east <strong>of</strong> the railroad to 25th Street SE.<br />

Commercial Street SE[Madrona Avenue SE<br />

- Construct a westbound right-turn lane within the 8,000 $175,000<br />

existing right-<strong>of</strong>-way.<br />

1 Cost estimates in year 2004 dollars.<br />

2 Cost estimate includes right-<strong>of</strong>-way acquisition.<br />

As shown in Table 2, two public improvements are triggered by the combined total <strong>of</strong> 6,960 net<br />

new daily trips generated by Phases I and II. The next transportation improvement is not<br />

triggered until the development reaches 8,000 net new daily trips per the Area Facilities <strong>Plan</strong>.<br />

We trust this memorandum addresses the impacts <strong>of</strong> Phase II <strong>of</strong> the Sustainable <strong>Fairview</strong><br />

development. If you any questions, please call us at (503) 228-5230.<br />

REFERENCES<br />

1. Institute <strong>of</strong> Transportation Engineers. Trip Generation, S'h Edition. 2008.<br />

2. Institute <strong>of</strong> Transportation Engineers. Trip Generation Handbook. 2004.<br />

ATTACHMENTS<br />

Attachment" A" -Sustainable <strong>Fairview</strong> Development Area Facilities <strong>Plan</strong><br />

Kittelson & Associates, Inc. Portland, <strong>Oregon</strong>


Attach.ment "A"<br />

Area Facilities <strong>Plan</strong>


1. Water and sewer systems are addressed in the <strong>Fairview</strong> Development District approval and<br />

are adequate to serve the proposed refinement plan.<br />

TI.GJP:G:\GROUP\PUBWKS\PlAN_ACT\PAANAUl\MISC\FAIRVIEW HILLS REANEMENT PlAN NEW. DOC


To: Jason Richlihg, <strong>Case</strong> Manager • S RECEIVED<br />

From: Jim Stewart, Deputy Fire Chief'...J b<br />

MAR 1 2 2012 .<br />

Date:<br />

Marcl) 12, 2012<br />

Subject: <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill- FRP12-01<br />

We have review the above-referenced project and have the following comments:<br />

· CONlMUNITY DEVELOPMENT<br />

1. Primary and secondary fire department access shall. be provided in accordance with the<br />

<strong>Salem</strong> Fire Prevention Code and shall address phasing plans. Multi-family housing<br />

access requirements Include secondary fire department access for projects having more<br />

than 1 00 dwelling units, or more than 200 dwelling units when approved automatic fire<br />

sprinkler systems are installed.<br />

Please contact me if you have any questions.<br />

ATTACHMENT 5


March 12, 2012<br />

To: Jason Rich ling, <strong>City</strong> <strong>of</strong> <strong>Salem</strong> Community Developm·ent Department<br />

cc. Matt Harrell, Simpson Hills, LLC; Michael Poissant, AKS Engineering<br />

From: Sam Hall, Managing Member<br />

Sustainable <strong>Fairview</strong> Associates, LLC<br />

P.O. Box 144, <strong>Salem</strong>, OR, 97308<br />

Subject: Comments on <strong>Fairview</strong> Training Site <strong>Refinement</strong> <strong>Plan</strong> Ill (<strong>Case</strong> No. FRP 12-01)<br />

RECEIVED<br />

MAR 1 2 2012<br />

COMMUNITY DEVELOPMENT<br />

SFA owns 140 acres <strong>of</strong> the former <strong>Fairview</strong> Training Center site adjacent north and west <strong>of</strong> the property<br />

in this refinement plan. SFA bought the entire property from the State <strong>of</strong> <strong>Oregon</strong> in 2002, and we<br />

worked with the <strong>City</strong> to create the <strong>Fairview</strong> Mixed-Use Zone and the <strong>Fairview</strong> Center Redevelopment<br />

<strong>Plan</strong> (FCRP.). in.2004-2005. We continue to have an active interest in ensuring that any refinement plan<br />

for the property honors the intent expressed by SFA and the <strong>City</strong> in the Master <strong>Plan</strong>(FCRP).<br />

We are pleased that there are several aspects <strong>of</strong> the refinement plan that conform with the rezoning<br />

and Master <strong>Plan</strong>. However, there are some aspects <strong>of</strong> the plan as submitted (and with what we know<br />

about its elaboration in the draft subdivision plan, site plan, and design review plan that we understand<br />

have also been submitted) that fall substantially short <strong>of</strong> conformance .. ·<br />

We limit our comments here primarily to the subdivision plan, but can't avoid looking ahead some at<br />

the.detailed plans that we know will come. We have conveyed several <strong>of</strong> our concerns to<br />

representatives <strong>of</strong> Simpson Hills, LLC and continue to try to engage them in discussion that might<br />

eliminate sciine <strong>of</strong> the issues we are raising. We are generally supportive <strong>of</strong> the plan to develop<br />

apartments on the site, but there is little evidence that their plan for apartments at <strong>Fairview</strong> is different. '<br />

from the projects they say they have done many times before on properties all over the country. We see<br />

very little understanding or recognition <strong>of</strong> the goals <strong>of</strong> the Master <strong>Plan</strong> and the nature <strong>of</strong>the <strong>Fairview</strong><br />

site.<br />

As a preliminary matter, the "A" street and "1 ""street <strong>of</strong> the plan appear to lie on the property lines<br />

with SFA and straddle the property lines. There is not (yet) agreement with SFA about the location <strong>of</strong><br />

those streets nor the design <strong>of</strong> the streets.<br />

The applicants address in the Introduction to the <strong>Refinement</strong> plan their response to the criteria and<br />

Principles <strong>of</strong> the Master <strong>Plan</strong>. We think it appropriate to focus our comments and criticisms on those<br />

statements. We will quote text (in italics) from the Master <strong>Plan</strong> and compare with the Simpson Hills<br />

plan. Rather than address all12 Principles, we focus on those that seem most pressing as issues for the<br />

refinement plan.<br />

ATTACHMENT 7


Principle 5: Build Innovative Green Buildings; Principle 1: Build in Economic and Social Diversity<br />

The refinement plan states "multi-family homes are by their very nature 'Green' buildings" and that they<br />

will be built to "meet and exceed current state and/or model energy code requirements". However, the<br />

remainder <strong>of</strong> the refinement plan text on these topics weakens whatever commitment is contained in<br />

those statements. The innovative green buildings envisioned in the Master <strong>Plan</strong> would achieve the kind<br />

<strong>of</strong> natural resource use and energy efficiency incorporated in standards such as Earth Advantage or<br />

LEED.<br />

SFA applauds the Simpson Hills plan for the urban density <strong>of</strong> housing it achieves and the apparent<br />

intended affordability <strong>of</strong> the units. This is a part <strong>of</strong> the mix <strong>of</strong> types <strong>of</strong> housing units included in the<br />

Master <strong>Plan</strong>. The plan falls short, however, in the uniformity <strong>of</strong> type over a relatively large area. The<br />

Master <strong>Plan</strong> says: "To the maximum extent possible, these units will be mixed so that every block will<br />

have homes for different types <strong>of</strong> people at different stages <strong>of</strong> lives and earning potentials." Lots 1 arid<br />

2 appear to have one type <strong>of</strong> building with one type <strong>of</strong> rental (with 1-3 bedrooms) and, perhaps, one<br />

type <strong>of</strong> townhouse. In the words <strong>of</strong> one <strong>of</strong> the original team for the Master <strong>Plan</strong>, the proposal provides<br />

a "relentless repetition <strong>of</strong> single building type". In this respect, the refinement plan detracts from the<br />

goal <strong>of</strong> a visually and socially diverse community in a variety <strong>of</strong> building types.<br />

Principle 2: Create a Center; Principle 4: Create Local Employment<br />

The Center envisioned in the Master <strong>Plan</strong> lies on SFA property directly north <strong>of</strong> Lot 2 <strong>of</strong> the refinement<br />

plan. The refinement plan does. leave intact most <strong>of</strong> the basic topography that orients the site toward<br />

that Center. The design and layout <strong>of</strong> the apartment complexes, however, largely ignore the future<br />

Center. The housing units on the north <strong>of</strong> Lot 2 could contribute to the Principles if they were mixed­<br />

use or similarly designed to face and participate in the future development across the street.<br />

The commercial space shown on Lot 3 and Lot 5 appears to be designed for automobile traffic passing<br />

by on Reed Road and B street. The location <strong>of</strong> the commercial space does not look conveniently<br />

accessible to other kinds <strong>of</strong> transport. Depending on the type <strong>of</strong> business attracted, it might well detract<br />

from the commercial viability <strong>of</strong> the Center. The location and layout work to elevate B street from the<br />

(narrow) local street <strong>of</strong> the Master <strong>Plan</strong> to compete with Lindburg Street as "Main Street'' for the<br />

entrance to the entire development.<br />

Principle 11: Transit Close at Hand<br />

The refinement plan Figure 13 shows the probable future extensions <strong>of</strong> public transit routes. In spite <strong>of</strong><br />

the explanation in the plan, it is difficult to see how the tenants on Lots 1 and 2 could easily get to the<br />

extended route 6. It is also hard to see the promised "interconnected public street/sidewalk system<br />

that blends with <strong>of</strong>f-site properties". As noted earlier, the northern facades <strong>of</strong> the two apartment<br />

compounds do not appear to encourage pedestrian or bicycle traffic from the 103-acre Simpson Hill site<br />

to the probable extension <strong>of</strong> route 7 on Lindburg Street.


The consultant team that develpped the Master <strong>Plan</strong> for SFA assisted in preparing this memo<br />

and much <strong>of</strong>the commentary originates from them. In addition, they have given SFA several<br />

recommendations for changes in the Simpson Hills/AKS proposal that are doable and would<br />

move this refinement plan much closer to the Principles <strong>of</strong> the Master <strong>Plan</strong>. SFA is willing to continue to<br />

work with the Simpson Hills planners in the hope <strong>of</strong> obtaining a cooperative development <strong>of</strong> the former<br />

FTC that meets the essential needs <strong>of</strong> both groups.


- 'Mar-12-12 11:53A P.Ol.<br />

Pringle Creek Watershed Council<br />

March 12, 2012 RECEIVED<br />

Jason M. Richli ng MAR 1 2 2012<br />

community Development Department<br />

<strong>City</strong> <strong>of</strong> <strong>Salem</strong><br />

555 Liberty St SE I Room 305<br />

<strong>Salem</strong>, OR 97301<br />

Re: <strong>Fairview</strong> Hills <strong>Refinement</strong> <strong>Plan</strong><br />

COMMUNITY DEVELOPMENT<br />

Pringle Creek Watershed Council has worked over the decades to promote<br />

watershed health in our community. In partnership with many other organizations,<br />

we've contributed thousands <strong>of</strong> volunteer hours removing invasive species and<br />

enhancing riparian areas through native plant restoration. Our Board, which<br />

consists <strong>of</strong> citizens from diverse backgrounds and pr<strong>of</strong>essions, is also part <strong>of</strong> the<br />

larger <strong>Salem</strong>-Keizer Watershed Alliance, working with the city to improve the health<br />

<strong>of</strong> our watershed.<br />

The Pringle Creek Watershed Council Board reviewed the <strong>Fairview</strong> Hills <strong>Refinement</strong><br />

<strong>Plan</strong> dated February 12, 2012. ·<br />

We are disappointed to see a centralized storm water detention basin for the run<strong>of</strong>f<br />

from the full 100+ acre development. ·<br />

One <strong>of</strong> the central principles <strong>of</strong> the adopted <strong>Fairview</strong> Master <strong>Plan</strong> is "zero impact to<br />

the watershed" through the use <strong>of</strong> "green infrastructure." The Master <strong>Plan</strong> says the<br />

development "will protect nature and develop new techniques for integrating the<br />

natural and built environments• and "encourage creative ideas, products, and<br />

processes," and "incorporate the best existing ideas about designing and<br />

constructing infrastructure, including utilities, streets, energy systems, water; [and]<br />

stormwater" while providing "opportunities to experiment with .leading-edge<br />

technologies and to create the technologies that will guide future infrastructure<br />

development."<br />

We do not see these criteria being met. Distributed systems, such as porous<br />

pavements and rain-gardens, more closely mimic the natural environment in terms<br />

<strong>of</strong> natural infiltration, retention, and pollution control, as compared to piping run<strong>of</strong>f<br />

to a large detention pond. Natural infiltration and groundwater recharge is critical<br />

for watershed health because groundwater percolates clean and cool water to our<br />

streams and waterways throughout the year, particularly in the summer months,<br />

when fish and other organisms need it most.<br />

Jhere are hints within the <strong>Refinement</strong> <strong>Plan</strong> that more innovative approaches such<br />

?S porous pavements and rain-gardens might be used, but for city <strong>of</strong> <strong>Salem</strong> street<br />

ATTACHMENT 8


Natural Resources Inventory, consistent with Principle 6 <strong>of</strong> the <strong>Fairview</strong> <strong>Plan</strong>. With respect to<br />

the design <strong>of</strong> the proposal working with rather than against the landscape, Figure 18 <strong>of</strong> the<br />

refinement plan shows the proposed street alignments, vehicle accessways and building layouts<br />

generally conforming to and preserving existing site topography.<br />

Issues regarding the 2009 soil remediation work pre-date the proposed refinement plan, and the<br />

applicant indicates that the current proposal is designed to respect the landscape in accordance<br />

with the <strong>Fairview</strong> Master <strong>Plan</strong>. With regard to site disturbance resulting from 2009 soil<br />

remediation activities, <strong>City</strong> aerial photographs and existing site elevation contours do show<br />

excavation from the toe <strong>of</strong> the central ridge on the Simpson Hills property, which appears to<br />

have significantly altered the topography <strong>of</strong> the site at that location from its natural disposition.<br />

This area intersects a small portion <strong>of</strong> the refinement plan area in the vicinity <strong>of</strong> proposed '2"d'<br />

Street. The 2009 grading activities referenced in the SFA comments appear to be inconsistent<br />

with Principle 6 <strong>of</strong> the <strong>Fairview</strong> Master <strong>Plan</strong>. A stated previously, the current proposal appears<br />

to incorporate existing site topography, and future development activities on the site will be<br />

required to adhere to the principles <strong>of</strong> the <strong>Plan</strong> as required by SRC Chapter 143C.<br />

Prepared by Jason Richling, <strong>Plan</strong>ner II<br />

G:\CD\PLANNING\CASE APPLICATION FILES 2011-0n\FAIRVIEW PLAN- <strong>Refinement</strong>\1-Staff Reports\ FRP12-<br />

01.SUPPLEMENTAL.jmr.docx


zone and foster greater consistency <strong>of</strong> development within the FMU-zone with the<br />

diverse housing envisioned in the <strong>Fairview</strong> <strong>Plan</strong>. The applicant states that the multifamily<br />

housing will include studio; 1 , 2 and 3 bedroom rental unit types that will<br />

appeal to tenant groups such as single adults, students, couples, single parent<br />

households, and couples with families <strong>of</strong> varying ages and income levels .. Therefore,<br />

the proposal conforms to this principle.<br />

2. Create a Center. The topography <strong>of</strong> the <strong>Fairview</strong> site is unique. It is like an upturned<br />

right hand, with the palm in the center and five fingers spreading up and out toward the<br />

edges <strong>of</strong> the site. The plan capitalizes on natural conditions. Since the human and<br />

natural flows <strong>of</strong> the site converge in the hollow "palm" <strong>of</strong> the site, a new center is<br />

envisioned there. This center will be the focus <strong>of</strong> the most intense urban activity, and it<br />

will also be the place with the most dramatic green spaces. Several "central parks" will<br />

include manicured play fields that are surrounded by naturalized zones to collect,<br />

mitigate and celebrate occasional rainwater flows from the upper portions <strong>of</strong> the<br />

community.<br />

Finding: The refinement plan is located at a transition between the toe-slopes <strong>of</strong><br />

several. ridges and the 'palm' envisioned as the location for the new 'Center'. The<br />

'Center' contemplated in the <strong>Fairview</strong> <strong>Plan</strong> is located within the 'Village Center (VC)<br />

overlay zone which is immediately adjacent to the north <strong>of</strong> the refinement plan area.<br />

A proposal for the 'Village Center' was approved as <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II in<br />

2009. The current plan capitalizes on natural site conditions by locating residential<br />

development between the 'palm' and lower hill slopes; integrating viewsheds<br />

identified in the <strong>Fairview</strong> <strong>Plan</strong> and including open spaces and 'green corridors'<br />

leading to the VC overlay to the north. In the northeast portion <strong>of</strong> the site,<br />

immediately adjacent to the 'Village Center', the plan includes a stormwater<br />

attenuation area designed to collect rainwater and mitigate stormwater flows from the<br />

upper portions <strong>of</strong> the property.<br />

The multi-family housing and neighborhood-scale commercial area contained in the<br />

refinement plan will be located across Lindburg Road SE from the 'Village Center'<br />

and are designed as a thoughtful transition between the civic, commercial, and<br />

mixed use developments contemplated in the 'Center' and the future lower-intensity<br />

housing to the south and west as depicted in the <strong>Fairview</strong> <strong>Plan</strong>. Furthermore, the<br />

massing <strong>of</strong> multi-family residential structures adjacent to the Lindburg Rd SE<br />

streetscape, as depicted throughout the refinement plan document, will foster an<br />

·active pedestrian environment adjacent to the future 'Village Center;' as anticipated<br />

in the <strong>Fairview</strong> <strong>Plan</strong>. The proposal therefore conforms to this principal.<br />

3. Re-use, retr<strong>of</strong>it The <strong>Fairview</strong> site has a large inventory <strong>of</strong> existing structures. SFA ·<br />

intends to adapt and reuse as many existing buildings as possible, particularly older<br />

buildings that presently form the "crescent". Buildings are not the only asset to be<br />

reused and retr<strong>of</strong>itted. Existing infrastructure, particularly the existing water system,<br />

may be an appropriate candidate for re-use and expansion, reducing the strain on the<br />

municipal system, and providing a more distributed green infrastructure.<br />

Finding: The refinement plan area does not encompass the older buildings<br />

identified as priority candidates for potential adaption and re-use in the 'crescent.'<br />

These structures are located approximately 600 feet to the northeast <strong>of</strong> the Simpson<br />

Hills LLC property. Permits were issued in 2009 authorizing demolition <strong>of</strong> Benton,<br />

Steel and Martin Halls on the subject site. These structures, categorized for<br />

FRP 12-01 Supplemental Staff Report Page 2 <strong>of</strong>8


"Deconstruction: Primarily for deconstruction with the option for reuse" on the<br />

<strong>Fairview</strong> <strong>Plan</strong>, Existing Building Reuse <strong>Plan</strong>, were removed to facilitate future<br />

economic use <strong>of</strong> the properties .. The refinement plan indicates that one existing<br />

structure, a well house, is located within the plan area. The <strong>Fairview</strong> <strong>Plan</strong><br />

categorizes this structure for "Deconstruction: Primarily for deconstruction with the<br />

option for reuse." The applicant has indicated that this structure will be retained, if<br />

possible, within the western 'green corridor' depicted in the plan document. The<br />

refinement plan does not indicate the presence <strong>of</strong> viable existing infrastructure;<br />

however, in an effort to reduce overall site water usage the plan states that plant<br />

species tolerant <strong>of</strong> soil and hydrologic conditions without ongoing irrigation are<br />

preferred for all landscaping within the refinement area. The proposal is therefore<br />

consistent with this principal.<br />

4. · Create Local Employment. Many <strong>of</strong> the existing buildings are suitable for conversion<br />

to business and light industrial uses. New buildings in the center will also provide <strong>of</strong>fice<br />

and commercial employment opportunities. Ultimately the objective is to provide one job<br />

perhousehold. This does not imply that all residents will work at FTCR [<strong>Fairview</strong><br />

Training Center Redevelopment], but many may. Combined with home occupations,<br />

allowed by right, these employment opportunities will reduce <strong>of</strong>f-site transportation<br />

impacts.<br />

Finding: The refinement plan calls for approximately 24,000 square feet <strong>of</strong> <strong>of</strong>fice<br />

and commercial space within a neighborhood-scale commercial center located<br />

· adjacent to the proposed multi-family residential development, thereby creating<br />

opportunities for local employment in close proximity to area residents and<br />

contributing to the <strong>Fairview</strong> <strong>Plan</strong> goal <strong>of</strong> providing one job per household. In order to<br />

maximize economic flexibility within the plan area the proposal also allows the full<br />

range <strong>of</strong> FMU-zone uses per SRC Table 143C-1. By siting higher-density residential<br />

uses within convenient walking distance from the proposed commercial area and<br />

adjacent to the future commercial and civic uses in the 'Village Center' approved in<br />

<strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II, the plan encourages local employment and fosters<br />

potential reductions in <strong>of</strong>f-site transportation impacts, therefore conforming to this<br />

principle.<br />

5. Build Innovative Gr.een Buildings. The site provides ample opportunities for green<br />

building innovation. While SFA will not itself develop all buildings on the site, it is<br />

committed to setting minimum energy standards and to seeking cost-effective ways to<br />

reduce the resources and energy required by all new and retr<strong>of</strong>itted buildings.<br />

Finding: According to the applicant, the multi-family structures will be designed to<br />

meet and exceed current state and/or model energy code requirements, and will<br />

incorporate cost-effective, energy-conserving, features such as energy efficient<br />

lighting in all common areas and apartment units where possible and energy efficient<br />

appliances, as well as low-VOC (volatile organic compound) interior finishes and<br />

other recycled-content building materials. The applicant notes that modern<br />

multi-family units stacked and grouped as proposed are very energy efficient when<br />

compared to detached single family homes; resulting in reduced heat loss and air<br />

infiltration rates by minimizing the percentage <strong>of</strong> exterior wall and ro<strong>of</strong> area per unit;<br />

and minimizing the resources necessary for unit construction and land area devoted<br />

to foundation area per living unit. In addition, the plan calls for the implementation <strong>of</strong><br />

sustainable development practices including local sourcing <strong>of</strong> primary building<br />

FRP 12-01 Supplemental Staff Report Page 3 <strong>of</strong>B


materials used in apartment construction such as wood, sand, gravel, gypsum, and<br />

water, which is a well accepted green building standard; and re-use <strong>of</strong> the existing<br />

gravel and crushed rock stockpiles on the property for road bases, trenches and<br />

structural backfill to the extent practical. According to the applicant, this will reduce<br />

the need for <strong>of</strong>f-site materials import and minimize overall fuel usage resulting from<br />

associated construction traffic. The proposal is therefore consistent with this .<br />

principle.<br />

SUSTAINABLE ECOLOGICAL SYSTEMS PRINCIPLES OF THE PLAN<br />

6. Respect the Landscape. The FTCR plan works with, not against, the existing<br />

landscape. The natural slopes on the site are preserved for recreational use, for habitat,<br />

. and for storm water flow. These slopes lead to the Village Green, which is both the<br />

ecological and the social heart <strong>of</strong> the community. Large existing wetlands and forest<br />

blocks are preserved, and, will be expanded over time.<br />

Finding: According to the applicant, the plan proposes to preserve, integrate and<br />

enhance existing drainage way and wetland elements identified in the <strong>Fairview</strong><br />

Master <strong>Plan</strong> Natural Resources Inventory. With respect to working the landscape,<br />

Figure 18 <strong>of</strong> the refinement plan shows the proposed street alignments, vehicle<br />

accessways and building layouts generally conforming to and preserving existing site<br />

topography. The property does not contain any large forest blocks; however, a stand<br />

<strong>of</strong> mature <strong>Oregon</strong> White Oak trees, identified as 'Significant Tree Stand No. 16' in<br />

the <strong>Fairview</strong> Master <strong>Plan</strong>, Natural Resources Inventory, will be preserved and<br />

showcased in the northeast corner <strong>of</strong> the site. Furthermore, the applicant has<br />

submitted a tree conservation plan (TCP) application· in conjunction with a concurrent<br />

proposal to subdivide the property, which identifies a total <strong>of</strong> 47 trees on the subject<br />

property. Under the city's tree preservation ordinance (SRC Chapter 68), tree<br />

conservation plans are required to preserve a minimum <strong>of</strong> 25 percent <strong>of</strong> the existing<br />

trees on the property; however, the applicant proposes to exceed the minimum tree<br />

retention requirements and preserve 68 percent <strong>of</strong> the existing trees on the site.<br />

In the northeast portion <strong>of</strong> the refinement plan the natural stormwater containment,<br />

infiltration and habitat functions <strong>of</strong> existing wetlands will be supplemented and<br />

enhanced by the creation <strong>of</strong> a stormwater attenuation basin. To preserve and<br />

enhance the water quality and habitat <strong>of</strong> the Pringle Creek watershed, the facility will<br />

be designed and vegetated in accordance with the Low Impact Development<br />

Approaches Handbook adopted by Clean Water Services <strong>of</strong> Washington County and<br />

integrated into the surrounding landscaping as a shallow landscaped depression that<br />

collects and holds stormwater run<strong>of</strong>f, allowing pollutants to settle and filter out as the<br />

water infiltrates into Jl}e ground to the extent possible prior to release. The facility will<br />

feature vegetation that is appropriate for the varying conditions within the extended<br />

dry basin. Vegetation will be established through dense plantings and will include a<br />

variety <strong>of</strong> native plants as well as non-invasive ornamentals that provide aesthetic<br />

and functional value. Therefore the proposal is consistent with this principle.<br />

7. Zero Impact to the Regional Watershed. The FTCR plan works with the natural<br />

capacities <strong>of</strong> the site, particularly in respects to water flow. Low cost and reduced cost<br />

infrastructure for parcels, road, and public green spaces will allow this new community to<br />

exert zero impact on the regional watershed and will improve, rather than degrade, the<br />

habitat <strong>of</strong> Pringle Creek.<br />

FRP 12-01 Supplemental Staff Report Page4 <strong>of</strong>B


Finding: In an effort to work with the natural capacities <strong>of</strong> the site, the refinement<br />

plan incorporates a storm water attenuation area allowing for natural infiltration to the<br />

extent possible, and to accommodate the existing <strong>of</strong>f-site flows from across Battle<br />

Creek Road. jnfiltration testing has been performed in several areas throughout the<br />

<strong>Fairview</strong> Hills property. This testing illustrates that infiltration rates vary from 0.1 to<br />

0.5 inches per hour or less, making the degree <strong>of</strong> infiltration that was envisioned in<br />

the <strong>Fairview</strong> <strong>Plan</strong> impractical. The applicant indicates that the proposed storniwater<br />

infrastructure is an optimal solution for the Simpson Hills LLC property based on<br />

existing soils, hydrology, and site topography. In addition, and as previously stated,<br />

in order to preserve and enhance the water quality and habitat <strong>of</strong> the Pringle Creek<br />

watershed, the stormwater attenuation facility will be designed and vegetated in<br />

accordance witl:l the Low Impact Development Approaches Handbook adopted by<br />

Clean Water Services <strong>of</strong> Washington County and will allow pollutants to settle and<br />

filter out as the water infiltrates into the ground to the extent possible prior to release.<br />

Therefore the proposal is consistent with this principle.<br />

8. Layer the Systems. FTCR is designed to integrate systems at all levels and across all<br />

categories. For example, business and commerce will be integrated with residential<br />

uses to create complete communities. Storm water mitigation strategies will be<br />

integrated with recreational, habitat and transportation uses. The integrated green<br />

infrastructure system will provide the framework for other sustainable site systems, such<br />

a district heat and potentially distributed ecological sanitary systems.<br />

Finding: Consistent with this principle, both residential and commercial land uses<br />

are included in the refinement plan to contribute toward development <strong>of</strong> the FMU<br />

zone as a 'complete' community. According to the applicant, the mix <strong>of</strong> land uses<br />

and layering <strong>of</strong> infrastructure and pedestrian facilities within 'green corridors' and<br />

open spaces represents a balanced approach to development <strong>of</strong> the site; one which<br />

includes proper stormwater management measures and promotes wetland, natural<br />

drainageway and habitat protection while fostering recreational opportunities and<br />

connectivity. The large amount <strong>of</strong> open space preserved in the refinement plan,<br />

accounting for nearly one-quarter <strong>of</strong> the plan area, allows sustainable site systems<br />

including the location <strong>of</strong> the stormwater containment and infiltration facility in the<br />

northeast corner <strong>of</strong> the property, which will enhance the habitat functions <strong>of</strong> existing<br />

drainage ways and wetlands leading to Pringle Creek. In addition, the open space<br />

areas designated within the plan foster opportunities for natural infiltration <strong>of</strong> rain<br />

water throughout the refinement plan area. The proposal therefore conforms to this<br />

principle.<br />

9. Close the Cycle <strong>of</strong> Energy and Material Flows. The systems described above will<br />

tighten the cycle <strong>of</strong> resources flows on the site. Rainwater that falls on the site will<br />

recharge the aquifer below, freshening and supplying the drinking water wells with clean<br />

water. Green wastes from the site will be composted and returned to enhance forest<br />

growth. Ideally, waste heat from commercial activities will be used to heat residential<br />

units in the same building or the same block. Geothermal energy from the ground may<br />

provide a practical means to reduce building operating costs. SFA also hopes to<br />

institute a state-<strong>of</strong>-the-art community recycling and composting facility.<br />

Finding: As discussed previously, the 'green corridors' and open space preserved<br />

on the site, together with the proposed stormwater attenuation system, allow for<br />

FRP 12-01 Supplemental Staff Report Page 5 <strong>of</strong> 8


on-site infiltration <strong>of</strong> rainwater to the extent possible given soil capabilities. This will<br />

contribute to recharge <strong>of</strong> the aquifer underlying the site as envisioned in the <strong>Fairview</strong><br />

<strong>Plan</strong>. As stated previously, the refinement plan does not incorporate any forested<br />

areas in which green wastes converted to soil amendments may enhance growth;<br />

however, the plan will promote recycling and reduce overall site refuse volumes by<br />

incorporating central refuse compactor systems and covered recycling facilities<br />

within each <strong>of</strong> the multi-family developments. In addition, the plan recognizes the<br />

importance <strong>of</strong> erosion control measures to stabilize area soils and prevent topsoil<br />

erosion. The applicant states that re-establishment <strong>of</strong> vegetation within the limits <strong>of</strong><br />

construction, a critical factor to minimizing the potential for erosion, will be<br />

incorporated into construction drawings for all development within the refinement<br />

plan area. The refinement plan is therefore consistent with this principle.<br />

SUSTAINABLE TRANSPORTATION AND MOVEMENT PRINCIPLES EMBODIED IN THE<br />

PLAN<br />

10. Green Corridors for People and Other Living Things. Wide green corridors with<br />

direct connection to hundreds <strong>of</strong> front doors and porches are a signature feature <strong>of</strong> the<br />

new FTCR. Broad green swaths include a complex layering <strong>of</strong> habitat, drainage ways,<br />

community garden sites, play areas, walking and bike trails, and narrow, low speed<br />

vehicle ways.<br />

Finding: The refinement plan designates approximately 10 acres as open space,<br />

which includes the lower one-third <strong>of</strong> the central 'green corridor' depicted in the<br />

<strong>Fairview</strong> <strong>Plan</strong>, and a 6.01-acre open space area in the northeast portion <strong>of</strong> the site.<br />

The applicant's 'Pedestrian <strong>Plan</strong>' (Figure 8) and 'Illustrative Site <strong>Plan</strong>' (Figure 21)<br />

show multi-use pathways and trials providing multiple direct connections from the<br />

proposed multi-family developments to the green corridor. A pedestrian street<br />

crossing at Lindburg Rd SE and proposed 'B' Street SE connects the eastern multifamily<br />

development and the rest <strong>of</strong> the refinement plan area to a system <strong>of</strong> trails<br />

within the large open space area in the northeast corner <strong>of</strong> the site. Figure 21 also<br />

shows portions <strong>of</strong> the 'green corridor' and northeast open space area designated as<br />

'natural open space,' which will be landscaped with native and non-invasive species<br />

to enhance area wildlife habitat. All streets internal to the refinement plan are<br />

proposed as narrow 'local' streets. With the exception <strong>of</strong> the interim cross-section for<br />

'B' Street SE extending south <strong>of</strong> proposed •znd. Street SE, the local street network will<br />

allow for on-street parking, which promotes low-speed vehicle travel within the plan<br />

area. Therefore the plan is consistent with this principle.<br />

11. Transit Close at Hand. SFA is committed to the value <strong>of</strong> public transit as a<br />

fundamental <strong>of</strong> a more sustainable <strong>Fairview</strong> and a more sustainable <strong>Salem</strong> region. This<br />

commitment is epitomized by the inclusion <strong>of</strong> a "Main Street" that crosses the site from<br />

north to south. All homes will be within a six-minute walk <strong>of</strong> this central spine. The<br />

street axis has been aligned in such a way as to be compatible with a future streetcar or<br />

BRT (bus rapid transit), should such a system ever be developed in <strong>Salem</strong>. SFA hopes<br />

that regional transit authorities will provide frequent bus connections between the village<br />

center and region.<br />

Finding: The northeast boundary <strong>of</strong> the refinement plan includes a portion <strong>of</strong> the<br />

right-<strong>of</strong>-way for future Lindburg Rd SE, which is proposed as the 'Main Street'<br />

bisecting the FMU zone from south-to-north as contemplated in the <strong>Fairview</strong> <strong>Plan</strong>.<br />

FRP 12-01 Supplemental Staff Report Page 6 <strong>of</strong> 8


Consistent with this principle, the submitted 'Transit <strong>Plan</strong>' (Figure 13) demonstrates<br />

that all development within the refinement plan will be located within Y. mile walking<br />

distance <strong>of</strong> this 'Main Street' and the extension <strong>of</strong> future <strong>Salem</strong>-Keizer Transit District<br />

bus line No. 7 that is anticipated to provide service along it. The proposal provides<br />

for pedestrian and bicycle connectivity and supports transit usage, thereby<br />

conforming to this principle.<br />

12. An Interconnected Street System. FTCR's "Main Street" will be connected to the rest<br />

<strong>of</strong> the site by an interconnected web <strong>of</strong> streets. The lack <strong>of</strong> cul-de-sac streets ensures ·<br />

that all trips are made by the shortest possible route and that major streets are not<br />

overburdened with congestion. The interconnected pattern extends out to the edges <strong>of</strong><br />

the site, insuring a high degree <strong>of</strong> connection to surrounding neighborhoods. In this<br />

way, FTCR avoids the tendency toward "gated community" planning and provides,<br />

instead, a prototype for integration with surrounding areas. This pattern, in concert with<br />

the complete community pattern where everyday needs (school, shops, employment,<br />

transit) are close at hand, will minimize auto dependence and lead to reduced driving by<br />

residents.<br />

Finding: The northeast boundary <strong>of</strong> the refinement plan includes a portion <strong>of</strong> the<br />

right-<strong>of</strong>-way for the future 'Main Street' bisecting the FMU zone from south-to-north in<br />

accordance with the <strong>Fairview</strong> <strong>Plan</strong>. The local street network depicted within the plan<br />

area does not include any cul-de-sac streets, and generally conforms to the<br />

conceptual street layout provided in the <strong>Fairview</strong> <strong>Plan</strong>. The street system, which<br />

includes pedestrian walkways on both sides <strong>of</strong> all streets, provides roadway<br />

connections to all residential, commercial and open space areas identified in the<br />

refinement plan in addition to the 'Village Center' approved in <strong>Fairview</strong> <strong>Refinement</strong><br />

<strong>Plan</strong> II to the north and undeveloped portions <strong>of</strong> the FTCR site. The massing <strong>of</strong><br />

multi-family residential structures adjacent to the Lindburg Rd SE streetscape will<br />

further reinforce an active pedestrian environment adjacent to the future 'Village<br />

Center;' as anticipated in the <strong>Fairview</strong> <strong>Plan</strong>.<br />

The plan also calls for <strong>of</strong>f-street, multi-use, pathways and trails to provide diverse<br />

travel options within the pedestrian network and foster greater connectivity between<br />

the streetscape and residential, commercial and open space areas. In doing so, the<br />

refinement plan reduces dependency upon single-occupancy-vehicle (SOV) trips,<br />

supports transit usage and allows efficient movement <strong>of</strong> people within the plan area<br />

and between the plan area and surrounding land uses. The plan is therefore<br />

consistent with this principle.<br />

13. Walk Every Day. FTCR will be a walkable community with plenty <strong>of</strong> places to explore.<br />

The design promotes walking at all levels, from walkways on both sides <strong>of</strong> all streets, to<br />

neighborhood parks, to broad greenways leading to village center shops, to bus stops<br />

easily accessible from all homes. SFA hopes that by integrating walking· into the routine<br />

<strong>of</strong> all residents, they will enjoy robust health and an improved quality <strong>of</strong> life.<br />

Finding: The applicant states that the proposed refinement plan includes a<br />

multi-layered system <strong>of</strong> sidewalks, multi-use pathways, and pedestrian connections<br />

to ensure a walkablei community as envisioned in the <strong>Fairview</strong> <strong>Plan</strong>. Figure 8 <strong>of</strong> the<br />

refinement plan depicts sidewalks on both sides <strong>of</strong> all streets, <strong>of</strong>f-street multi-use<br />

pathways and a system <strong>of</strong> trails within the green corridor and open space areas, in<br />

addition to a system <strong>of</strong> pedestrian walkways within the multi-family residential<br />

FRP 12-01 Supplemental Staff Report Page 7 <strong>of</strong>B


developments. The pedestrian system illustrated in Figure 8 shows pedestrian<br />

connections between the streetscape, open spaces and natural areas, and<br />

residential and commercial uses within the plan area. In addition, Figure 21 shows<br />

numerous direct pedestrian pathway connections to Lindburg Rd SE along the<br />

northem refinement plan boundary, which connects the plan area to future transit<br />

connections along this roadway in addition to the more intensive commercial and<br />

civic uses envisioned in the 'Village Center' to the north <strong>of</strong> Lindburg Rd. The<br />

pedestrian system, which includes pedestrian sidewalks and <strong>of</strong>f-street multi-use<br />

pathways and trails, provides connections to all residential, commercial and open<br />

space areas identified in the refinement plan in addition to the 'Village Center'<br />

approved in <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> II to the north and undeveloped portions <strong>of</strong> the<br />

FTCR site. The plan is therefore consistent with this principle.<br />

Prepared by Jason Richling, <strong>Plan</strong>ner ll'""(fe_<br />

G:ICD\PLANNINGICASE APPLICATION FILES 2011-0n\FAIRVIEW PLAN- <strong>Refinement</strong>\1-Staff Reports\ FRP12-<br />

01.SUPPLEMENTAL.4.3.12.jmr_1.docx<br />

FRP 12-01 Supplemental Staff Report Page 8 <strong>of</strong>8


TO: PLANNING COMMIS<br />

FROM: GLENN W. GROSS<br />

URBAN PLANNIN AD<br />

SUPPLEMENTAL REPORT<br />

FOR MEETING OF: April3, 2012<br />

AGENDA ITEM NO.:_§,!<br />

SUBJECT: SUPPLEMENTAL STAFF REPORT REGARDING RECOMMENDED<br />

CONDITIONS OF APPROVAL FOR FRP12-01<br />

ISSUE<br />

Request for approval <strong>of</strong> <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill, a refinement plan for a portion <strong>of</strong> the<br />

former <strong>Fairview</strong> Training Center site, approximately 43.2 acres in size, pursuant to the<br />

requirements <strong>of</strong> the FMU (<strong>Fairview</strong> Mixed Use) zone, SRC Chapter 143C, for property<br />

designated "Mixed Use" on the <strong>Salem</strong> Area Comprehensive <strong>Plan</strong> map, zoned FMU (<strong>Fairview</strong><br />

Mixed Use), and located north <strong>of</strong> the intersection <strong>of</strong> Battle Creek Road SE and Reed Road SE<br />

(Marion County Assessor's Map and Tax Lot numbers: 083W11 I 00300 & 00400).<br />

RECOMMENDATION<br />

Staff recommends that the <strong>Plan</strong>ning Commission adopt the facts and findings <strong>of</strong> this<br />

supplemental staff report and the original staff report and approve <strong>Fairview</strong> <strong>Refinement</strong> <strong>Plan</strong> Ill,<br />

by resolution, with the addition <strong>of</strong> the condition <strong>of</strong> approval listed in this report.<br />

FACTS AND FINDINGS<br />

The staff report prepared for the March 20, 2012 <strong>Plan</strong>ning Commission meeting included<br />

responses to concerns raised by the adjacent property owner, Sustainable <strong>Fairview</strong> Associates<br />

(SFA) with regard to the alignments <strong>of</strong> proposed 'A' and '1st. streets. Specifically, SFA stated<br />

" ... the "A" street and "1 st.• street <strong>of</strong> the plan appear to lie on the property lines with SFA and<br />

straddle the property lines. There is not (yet) agreement with SFA about the location <strong>of</strong> those<br />

streets nor the design <strong>of</strong> the streets ... " In response, staff noted that the refinement plan may<br />

need to be modified to shift the proposed 'A' and '1st. street rights-<strong>of</strong>-way further onto the<br />

Simpson Hills LLC property if accordance could not be reached.<br />

In a subsequent conversation, Sam Hall, managing partner for SFA, indicated that agreement<br />

has not been reached on the proposed alignment or design <strong>of</strong> 'A' and '1st. streets. Therefore, in<br />

order to ensure conformance <strong>of</strong> the FRP12-01 street plan with the street cross-sections<br />

provided in the <strong>Salem</strong> Transportation System <strong>Plan</strong>, while providing flexibility for future<br />

negotiations between the applicant and SFA with regard to the alignment and design <strong>of</strong><br />

proposed 'A' and '1st. streets, staff recommends that the following condition <strong>of</strong> approval be<br />

added to the Jist <strong>of</strong> conditions included in the original staff report:<br />

Condition 5: Unless agreement can be reached with the adjacent property owner regarding<br />

the proposed alignment and design <strong>of</strong> 'A' and '1st• streets, the 'A' and'1st. street<br />

rights-<strong>of</strong>-way will need to be shifted onto the Simpson Hills LLC property.<br />

FRP 12-01 Supplemental Staff Report Page 1 <strong>of</strong> 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!