<strong>IGM</strong>/10/14-01/Appendix 1<br />
<strong>SPG</strong>/10/14-01/Appendix 1<br />
• In assuring financial stability, and both sustainability and sustainable<br />
development; continuity is important and CAPaBLE should not be viewed as a<br />
“limited” programme with a shelf life.<br />
• Both success of the Programme and transparency of procedural aspects and<br />
dissemination is of prime significance to ensure a future <strong>for</strong> CAPaBLE<br />
The summarized points above led to the development of a draft TOR (Appendix<br />
2).<br />
Item 5: Financial Report and 2004 Budget Status<br />
The CAPaBLE Budget was presented by Mr. Yukihiro Imanari. A summary of the<br />
presentation and discussion is outlined:<br />
• Approximately USD 80,000 is available <strong>for</strong> funding <strong>for</strong> the current year (2004)<br />
• A contingency fund of about USD 20,000 (buffer to offset any negative<br />
exchange rate fluctuations) is also available.<br />
• Approximately USD 11,000 is available <strong>for</strong> mentors (advisors). These funds<br />
are to be used <strong>for</strong> both CB and CRP activities.<br />
• In total, there is currently USD 111,000 available under the CAPaBLE<br />
Programme.<br />
• The CSC Committee agreed that, while there needs to be important emphasis<br />
on financial reports, there needs to be major review on the OUPUTS versus<br />
the original objectives.<br />
The financial report is attached as Appendix 3<br />
Items 6 and 7: Comprehensive Research Projects & Capacity Building<br />
Activities<br />
Main outcomes:<br />
• The two current CRPS (see Appendix 2) were considered to be progressing<br />
extremely well and continuation into the second year was approved with<br />
some specific recommendations.<br />
• The four continuing capacity building projects were also accepted <strong>for</strong><br />
additional funding again with specific recommendations.<br />
• Three completed projects are to submit a final report according to the<br />
specified template with emphasis on follow-up and self-sustainability in<br />
respect of the original objectives of the CAPaBLE Programme and the activity<br />
itself.<br />
• For project 2003-CB-07 the project is ongoing and moving into Phase II. The<br />
balance available from the original allocation is to be used <strong>for</strong> phase 2<br />
activities of the project. Justification – request modification to a plan of<br />
activities but the original objectives must be kept in place. This is a <strong>for</strong>mless<br />
application.<br />
• Mechanism <strong>for</strong> follow-up needs to be effectively put into place.<br />
• Award letters to be issued and budget negotiated as per APN’s standard<br />
practice.<br />
• For the 10 th <strong>IGM</strong> a Phase I intermediate product to be published highlighting<br />
the activities and successes to date. This is <strong>for</strong>eseen to be a glossy document,<br />
perhaps 10-15 pages that can be distributed to the wider audience in a<br />
strategic ef<strong>for</strong>t to enhance the CAPaBLE Programme and attract other<br />
stakeholders.<br />
• Concept of a contact point between the CAPaBLE Standing Committee and the<br />
project is a must that PIs would have to live with but the role of mentoring<br />
should be at the higher advisory level that implies “helping” not “supervising”<br />
to ensure the project meets its goals.<br />
�99�