23.01.2013 Views

2005-IGM-SPG 10.pdf - Asia-Pacific Network for Global Change ...

2005-IGM-SPG 10.pdf - Asia-Pacific Network for Global Change ...

2005-IGM-SPG 10.pdf - Asia-Pacific Network for Global Change ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IGM</strong>/10/14-01/Appendix 1<br />

<strong>SPG</strong>/10/14-01/Appendix 1<br />

• In assuring financial stability, and both sustainability and sustainable<br />

development; continuity is important and CAPaBLE should not be viewed as a<br />

“limited” programme with a shelf life.<br />

• Both success of the Programme and transparency of procedural aspects and<br />

dissemination is of prime significance to ensure a future <strong>for</strong> CAPaBLE<br />

The summarized points above led to the development of a draft TOR (Appendix<br />

2).<br />

Item 5: Financial Report and 2004 Budget Status<br />

The CAPaBLE Budget was presented by Mr. Yukihiro Imanari. A summary of the<br />

presentation and discussion is outlined:<br />

• Approximately USD 80,000 is available <strong>for</strong> funding <strong>for</strong> the current year (2004)<br />

• A contingency fund of about USD 20,000 (buffer to offset any negative<br />

exchange rate fluctuations) is also available.<br />

• Approximately USD 11,000 is available <strong>for</strong> mentors (advisors). These funds<br />

are to be used <strong>for</strong> both CB and CRP activities.<br />

• In total, there is currently USD 111,000 available under the CAPaBLE<br />

Programme.<br />

• The CSC Committee agreed that, while there needs to be important emphasis<br />

on financial reports, there needs to be major review on the OUPUTS versus<br />

the original objectives.<br />

The financial report is attached as Appendix 3<br />

Items 6 and 7: Comprehensive Research Projects & Capacity Building<br />

Activities<br />

Main outcomes:<br />

• The two current CRPS (see Appendix 2) were considered to be progressing<br />

extremely well and continuation into the second year was approved with<br />

some specific recommendations.<br />

• The four continuing capacity building projects were also accepted <strong>for</strong><br />

additional funding again with specific recommendations.<br />

• Three completed projects are to submit a final report according to the<br />

specified template with emphasis on follow-up and self-sustainability in<br />

respect of the original objectives of the CAPaBLE Programme and the activity<br />

itself.<br />

• For project 2003-CB-07 the project is ongoing and moving into Phase II. The<br />

balance available from the original allocation is to be used <strong>for</strong> phase 2<br />

activities of the project. Justification – request modification to a plan of<br />

activities but the original objectives must be kept in place. This is a <strong>for</strong>mless<br />

application.<br />

• Mechanism <strong>for</strong> follow-up needs to be effectively put into place.<br />

• Award letters to be issued and budget negotiated as per APN’s standard<br />

practice.<br />

• For the 10 th <strong>IGM</strong> a Phase I intermediate product to be published highlighting<br />

the activities and successes to date. This is <strong>for</strong>eseen to be a glossy document,<br />

perhaps 10-15 pages that can be distributed to the wider audience in a<br />

strategic ef<strong>for</strong>t to enhance the CAPaBLE Programme and attract other<br />

stakeholders.<br />

• Concept of a contact point between the CAPaBLE Standing Committee and the<br />

project is a must that PIs would have to live with but the role of mentoring<br />

should be at the higher advisory level that implies “helping” not “supervising”<br />

to ensure the project meets its goals.<br />

�99�

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!