Novapoint Civil Construction
Novapoint Civil Construction
Novapoint Civil Construction
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Ewald Kjølbro, LANDSVERK<br />
PILOT PROJECT IN 3D<br />
NEW AIRPORT IN THE FAER<br />
The Faeroese Road Directorate, LANDSVERK, is responsible for managing<br />
the public construction of roads, harbors, airports, tunnels and buildings<br />
in the Faeroe Islands.<br />
LANDSVERK owns, plans and maintains all main roads. There are<br />
approximately 1,000 kilometers road system in the Faeroe Islands, of<br />
which circa 500 kilometers are main roads.<br />
Furthermore, the approximately 200 employees manage authority functions in relation to harbors,<br />
roads, tunnels, airports and are also in charge of planning the Faeroese in-frastructure. The<br />
infrastructure (road system, bridges, tunnels, harbors) in the Faeroe Islands is to be expanded<br />
for a total amount of 103 mio. DKK in 2009.<br />
The current, and only, airport in the Faeroe Islands, Vágar Airport, is located on Vágar Island. The<br />
airport has scheduled departures to several destinations with the largest faeroese airline: Atlantic<br />
Airways.<br />
LANDSVERK employ <strong>Novapoint</strong> for road planning. That is why it is natural to use the program as<br />
a planning tool for preliminary studies of possible locations for a new airport in the Faeroe Islands.<br />
The runway on the current airport is too small and a lar-ger and longer runway is needed in order<br />
to transport imported goods with larger transportation planes.<br />
A preliminary study examines whether a project is doable in the prospective terrain. Such studies<br />
are especially comprehensive in the Faeroe Islands because of the very demanding terrain<br />
conditions with large altitude differences. This results in special challenges when planning new<br />
roads and – of course – airports.<br />
LANDSVERK has performed a preliminary study on Vágar, north of Vágar Airport. Here it is possible<br />
that a new runway can expand the airport sufficiently. This will save a great deal of costs<br />
because they do not have to build a completely new airport.<br />
CONSTRUCTION OF MODEL<br />
A terrain model has been formed on the basis of terrain data: contour lines, break lines and<br />
datum points. The runway is calculated in 3D via <strong>Novapoint</strong> functions after which it can be added<br />
to the model. From the very beginning the model has been put in No-vapoint Virtual Map. This<br />
means that you can move around inside the model.<br />
Placing an ortophoto over the terrain makes it possible to see the potential location of the new,<br />
2.6 kilometer long, runway. The present runway is visible in the right side of the image.<br />
28