- Page 3 and 4:
SERIE DIVULGACIÓN TÉCNICA Institu
- Page 5:
Índice de contenidos Introducción
- Page 8 and 9:
degna (Italia), la Región de Apuli
- Page 11:
Programa del Seminario y Poster 11
- Page 14 and 15:
PROGRAMME imida 1st day: 8 SEPTEMBE
- Page 17:
Intervenciones Presentación en ing
- Page 20 and 21:
Main objectives of the project Gene
- Page 22 and 23:
What is a « Sustainable Mediterran
- Page 24 and 25:
Possible criteria for the implement
- Page 26 and 27:
Some considerations and facts on bi
- Page 28 and 29: DENERAL DATA OF On Cultivos PROJECT
- Page 30 and 31: Preliminary evaluation results with
- Page 32 and 33: Preliminary evaluation results ofSo
- Page 34 and 35: Preliminary evaluation results of s
- Page 36 and 37: Experiemental parcels in On Cultivo
- Page 38 and 39: Panicum virgatum var. Cave in Rock
- Page 40 and 41: Andropogon gerardii var. Roundtree
- Page 42 and 43: ESTRATEGY FOR THE SUSTAINABLE INTRO
- Page 44 and 45: Correlation between economic and en
- Page 46 and 47: Energy crops for marginal rainfed l
- Page 48 and 49: ECONOMICAL • Energy production in
- Page 50 and 51: PRESELECTION OF NATIVE SPECIES OF M
- Page 52 and 53: May 2010 IRRIGATED June 2010 RAINFE
- Page 54 and 55: Other yields during 2010 (Plant den
- Page 56 and 57: CONCLUSIONS •There is not a globa
- Page 58 and 59: Marginal croplands 1956 Environment
- Page 60 and 61: Marginal croplands • mediterranea
- Page 62 and 63: Objective crops Environmental impac
- Page 64 and 65: Environmental impacts of energy cro
- Page 66 and 67: A new balance? • Aethiessa floral
- Page 68 and 69: Steppe birds • Lek: : grouping of
- Page 70 and 71: Sustainable management of Mediterra
- Page 72 and 73: NOVAGRIMED PROGRESS UNTIL 2011: Tec
- Page 74 and 75: NOVAGRIMED PROGRESS UNTIL 2011: Leg
- Page 76 and 77: NOVAGRIMED FORESTRY MYTHS AND LEGEN
- Page 81 and 82: 54% OF THE COMARCAL AREA ARE WOODED
- Page 83 and 84: Implementation of Bioenergy Distric
- Page 85 and 86: Le Plan du district agro-énergéti
- Page 87 and 88: Les outils GIS pour le district agr
- Page 89 and 90: Les outils GIS pour le district agr
- Page 91 and 92: Les outils GIS pour le district agr
- Page 93 and 94: Les outils GIS pour le district agr
- Page 95 and 96: Développement de l’idée du dist
- Page 97 and 98: Implementation of Bioenergy Distric
- Page 99 and 100: 1- Type of biomass sources and wher
- Page 101 and 102: 1- Type of biomass sources and wher
- Page 103 and 104: 3- Biomass cost transport. Landuse
- Page 105 and 106: 4- Example maps produced. Isochrone
- Page 107 and 108: Biomass power plants to produce ele
- Page 109 and 110: 66% 34% 100% 76% 50% 24% 50%
- Page 111 and 112: 111
- Page 113 and 114: 113 Tallinn (Estonia)
- Page 115 and 116: Broad experience in Biomass has lea
- Page 117 and 118: 117
- Page 119 and 120: INDUSTRIAS DAVID S.L.U. Red de dist
- Page 121 and 122: No se pude mostrar la imagen vincul
- Page 123 and 124: No se pude mostrar la imagen vincul
- Page 125 and 126: INDUSTRIAS DAVID S.L.U. Nuestros pr
- Page 127 and 128: Producción y obtención de biomasa
- Page 129 and 130:
Mantenimiento de pistas forestales,
- Page 131 and 132:
27 INDUSTRIAS DAVID S.L.U. Especial
- Page 133 and 134:
Laboratory facilities at the HFR
- Page 135 and 136:
The role of biomass in a 100% renew
- Page 137 and 138:
Bioenergiedorf Mauenheim: Village w
- Page 139 and 140:
100% Renewable Energy Regions Outli
- Page 141 and 142:
• Wood chips Customizing biofuels
- Page 143 and 144:
• 200 -2000 kW el. • el. effici
- Page 145 and 146:
Relevant characteristics of solid b
- Page 147 and 148:
NO x emissions Source: Obernberger
- Page 149 and 150:
Combustion of spelt husks in an und
- Page 151 and 152:
Sources • OBERNBERGER, I.: The pr
- Page 153 and 154:
Quality & Standardization of biomas
- Page 155 and 156:
Quality & Standardization of biomas
- Page 157 and 158:
Quality & Standardization of biomas
- Page 159 and 160:
Quality & Standardization of biomas
- Page 161 and 162:
Quality & Standardization of biomas
- Page 163 and 164:
Ponencias en español EL PROYECTO N
- Page 165 and 166:
• principios de funcionamiento.
- Page 167 and 168:
LA BIOMASA COMO RECURSO ENERGÉTICO
- Page 169 and 170:
tendrán o apenas aumentará, mient
- Page 171 and 172:
- las producciones de chopo en Espa
- Page 173 and 174:
Nuevos cultivos evaluados desde el
- Page 175 and 176:
- gramíneas perennes: a) en secano
- Page 177 and 178:
CULTIVOS ENERGÉTICOS PARA TIERRAS
- Page 179 and 180:
Nuestra fi nca de ensayos está sit
- Page 181 and 182:
a 4 plantas/m 2 favoreció el rendi
- Page 183 and 184:
IMPACTOS AMBIENTALES DE LOS CULTIVO
- Page 185 and 186:
Influencia de la agricultura actual
- Page 187 and 188:
das y pesticidas que eliminan hierb
- Page 189 and 190:
PRODUCCIÓN ENERGÉTICA Y MANEJO SO
- Page 191 and 192:
• registro de cultivos energétic
- Page 193 and 194:
Objetivos de PROFOMUR a) Gestión f
- Page 195 and 196:
IMPLEMENTACIÓN DE DISTRITOS BIOENE
- Page 197 and 198:
Biomasa agrícola y forestal: culti
- Page 199 and 200:
• ayudas del 30% para la inversi
- Page 201 and 202:
geodatos, nos preguntamos cuál ser
- Page 203 and 204:
CENTRALES DE BIOMASA PARA GENERACI
- Page 205 and 206:
enovables (ER), pero España, de ac
- Page 207 and 208:
TECNOLOGÍAS DISPONIBLES PARA LA CO
- Page 209 and 210:
actualidad, las energías alternati
- Page 211 and 212:
En general, los problemas que con m
- Page 213 and 214:
¿Por qué es necesaria una cierta
- Page 215 and 216:
Pellets: para esta forma de biomasa
- Page 217 and 218:
distrito, nuestro primer trabajo es
- Page 219 and 220:
una empresa detrás como ENCE, líd
- Page 221 and 222:
Presentación de Roque Pérez, Dire
- Page 223 and 224:
Presentación de Joaquín Atenza, G
- Page 225 and 226:
no tiene b.6.1? Tiene que seguir da
- Page 227 and 228:
(P12) María Sánchez, Cultivos ene
- Page 229 and 230:
Presentación de Martin Brunotte, U
- Page 231 and 232:
Hoy en día la emisión de partícu
- Page 233:
(P4) Enrique Correal, Equipo Cultiv
- Page 237 and 238:
Durante el Seminario, expertos regi
- Page 239 and 240:
Massimo Rocchitta, responsable de p
- Page 241:
Mesa redonda sobre producción de b
- Page 244 and 245:
pasar a un desarrollo preindustrial
- Page 246 and 247:
proyecto que pronto será una reali
- Page 248 and 249:
(C5) Pedro Robles, Ingeniero Agrón
- Page 250 and 251:
Querría hacer una puntualización
- Page 253:
Plataforma para elaboración y pres
- Page 256 and 257:
Ejemplos de propuesta BIOENERGY PRO
- Page 258 and 259:
PRODUCTION AND UTILIZATION OF ENERG
- Page 260 and 261:
MACHINERY for biomass crops: -estab
- Page 262 and 263:
- develop energy crops adapted to d
- Page 264 and 265:
BIOENERGY: BIOMASS CROPS Plant-deri
- Page 266 and 267:
AGRICULTURAL CROPS FOR HEAT AND ELE
- Page 268 and 269:
268 6) movilizar los residuos agrí
- Page 270 and 271:
The specifi c objectives of the AGR
- Page 273 and 274:
Consejería de Agricultura y Agua C
- Page 275 and 276:
Además, se destacó la importancia
- Page 277:
ginales europeos, que, según el di