13.07.2015 Views

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SALINANGlobal Marine Sytem LtdHuawei Tech. Investment Co. Ltd.Huawei Submarine System Co. Ltd. (JV)Huawei Marine System Co. Ltd.Huawei Marine Networks Co. LtdPT Huawei Tech InvestmentPT Sansaine ExindoHuawei Sansaine Consortiumf. Bahwa berdasarkan struktur organisasi tersebut dapatdisimpulkan sebenarnya secara formal tidak terjadiperubahan kapasitas bidder karena masih diwakili olehperusahaan yang terafiliasi; ----------------------------------------g. Bahwa oleh karena itu, secara formal Huawei SansaineConsortium masih dapat dikategorikan sebagai eligiblebidder dalam <strong>Tender</strong> MKCS; --------------------------------------1.3.4.2. Aspek Materiil atau Substansial; --------------------------------------a. Bahwa pada proses tender <strong>Palapa</strong> <strong>Ring</strong> tahun 2008ditetapkan persyaratan kriteria peserta sebagai berikut: -------- Bidders must be: (i) owner or manufacturer of submarinetechnology/equipment (Submarine Line Terminal Equipment/DenseWavelength Division Multiplexing and repeater equipment) (ii)provider of marine services for submarine transmission system;- If bidder does not intend to act as a sole supplier (which totallyown or manufacture submarine technology/equipment, providemarine services of submarine transmission system and own ormanufacture submarine cable system), bidder may choose subcontractor(s)or establish a consortium under followingrequirements: bidder as main-contractor or consortium-leader act as a projectleader which is responsibility to the entire project duringprocurement, manufacturing, construction, and warranty support.... role and responsibility of each sub-contractor or or consortiummemberfor SLTE (DWDM) and repeater equipment, marineservices of submarine transmission system, and submarine cablesystem shall be defined under single responsibility basis to themain-contractor or consortium leader.- Bidder as well as each sub-contractor or consortium-member forDLTE (DWDM) and repeater equipment, marine services ofsubmarine transmission system, and submarine cable system shallfulfill following requirement: Shall have experiences as main-contractor or consortium-leaderor sub-contractor or consortium-member in deploying orsupplying marine services for repeater and repeater-lesssubmarine and inland optical cable system project at least at 2(two) Telecommunication Companies/Operators out of origincountry; and Shall have experiences in handling preliminary survey anddeploying repeater and repeater-less submarine and inland50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!