13.07.2015 Views

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

Tender Pengadaan Palapa Ring Mataram-Kupang Cable ... - KPPU

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SALINANoptical cable system at minimum of 1.000 km length in a singleproject or contract or comulative of 10.000 km length in multipleproject; and Shall have experiences minimum 5 (five) years in producing orsupplying or deploying SLTE (DWDM) and repeater equipment,marine service of submarine transmission system, and submarinecable system.b. Bahwa pada <strong>Tender</strong> MKCS ditetapkan persyaratan kriteriapeserta sebagai berikut: ---------------------------------------------- The bidder(s) must be submarine cable owner or submarine lineterminal equipment owner or submarine cable system constructor,which are already pass the <strong>Palapa</strong> <strong>Ring</strong> prequalification biddingprocess (butir 2.1 RFP)- In Case the bidder(s) do not have its own complete systemsolution and comply the technical requirement stated in Section III,the bidder shall provide the sub-system solution with the followingcriteria: The un-repeater submarine cable shall pass the technicalrequirement at <strong>Palapa</strong> <strong>Ring</strong> prequalification bidding processwhich are Alcatel, Nexan, NSW, OCC, and Tyco <strong>Cable</strong>; The WDM terrestrial equipment shall have OTN and ROADMcapability; The SLTE shall have proven in 390 km distance of un-repeatersubmarine system(butir 2.2 RFP)- The bidder shall have experience as the un-repeater submarinetransmission system provider as a main contractor and orsubcontractor at least at 2 (two) telecommunication companies/operators out of origin country (2.3 RFP)- If the bidder can not intend to act as a sole supplier referringclause 2.2, the bidder shall establish a consortium or choose subcontractor(s),subject to the following requirement: The consortium leader or main contractor shall be submarinecable owner or submarine line terminal equipment owner orsubmarine cable system constructor; The consortium leader or main contractor acts as a projectleader which is responsible of whole project during procurement,construction and warranty support as mentioned in Section IVarticle 29; The member of consortium for WDM terrestrial shall haverepresentative office in Indonesia; Establish a consortium agreement legalized by Notarizes deedunder the law of Indonesia or submits supporting letter forsubmits letter from sub-contractors; The role and responsibility of each member consortium or subcontractorshall be duly establish and set forth clearly in thebidder agreement including inter alia each consortium memberor sub-contract’s responsibility and liability in.(butir 2.6 RFP)c. Bahwa berdasarkan uraian kedua kriteria perserta tersebutdapat diketahui bahwa tidak ada perbedaan secarasubstansial dimana peserta yang dapat mengikuti tenderharus memenuhi persyaratan sebagai berikut: -------------------(1) perusahaan pemilik produk kabel laut; atau --------------(2) pemilik teknologi perangkat terminal; atau ---------------(3) konstruktor sistem kabel laut. ------------------------------d. Bahwa apabila direlevansikan dengan kapasitas HuaweiSansaine Consortium dalam proses <strong>Tender</strong> MKCS makadapat diuraikan sebagai berikut: -----------------------------------51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!