12.05.2020 Views

ATH-Heinl Bedienungsanleitung M72Z Plus

ATH-Heinl Bedienungsanleitung M72Z Plus

ATH-Heinl Bedienungsanleitung M72Z Plus

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.9.1. Securing the machine<br />

It is recommended that the machine is secured to the floor at the four points provided using M8 anchor<br />

screws and the corresponding dowels.<br />

Drill holes, observing<br />

the necessary drill depth<br />

A and drill diameter of<br />

the dowel manufacturer<br />

Clean out the inside of<br />

the holes<br />

Insert the anchor bolts<br />

into the holes until they<br />

have reached an<br />

appropriate depth.<br />

Tighten the nuts to the<br />

torque specified by the<br />

manufacturer<br />

Clamping thickness B<br />

varies depending on the<br />

floor covering<br />

2.10 Completion of Work<br />

Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic<br />

lines and, if necessary, tighten these. Warning: in some cases, this must be checked at<br />

regular intervals and tightened if necessary (note in the instructions).<br />

® Copyright <strong>ATH</strong>-<strong>Heinl</strong> GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-04<br />

Manufacturer <strong>ATH</strong>-<strong>Heinl</strong> GmbH & CO.KG<br />

- 29 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!