Grant Agreement No. 460000XXXX<br />
Page I5 of42<br />
Not opplicoble. The project is investigotory in nolure ond will provide the necessory doto for AWA Engineering<br />
Deportmenl to ossess ond prescribe future improvements.<br />
Tosk 5: Finol Design<br />
AWA project monoger, ossistonÌ engineer ond distribution operotor will colloborote on the design of the<br />
project. The l0% design willshow project siting ond loyout of the moster meters, ond contoin bockground<br />
geologic reseorch ond ony constroints there moy be lhot opply to the project. The 100% or finol design will<br />
consist of the complete, signed plons ond specificotions.<br />
During project development the following methodologies ond stondords will be used:<br />
. Americon Woter Works Associotion (AWWA) moteriols stondords<br />
. Americon Society for Testing ond Moteriols (ASTM) stondords<br />
. Amodor Woter <strong>Agency</strong> hydroulic modeling stondords (H2ONet)<br />
. Olhers os identified os opplicoble<br />
Additionolly, during design, AWWA ond ASTM Construction Stondords, AWA Stondord SpecificoÌions, ond<br />
Occupotionol SofeÌy & Heolth Administrotion (OSHA) regulotions ond industry stondord proctice will be used os<br />
construction stondords ond heolfh ond sofety stondords.<br />
Tosk 5 Deliverobles:<br />
. lO% Design<br />
. Finol (100%) Design Pockoge<br />
Tosk ó: Environmentol Documentotion<br />
Becouse the project involves instollotion of meters on existing woter system infrostructure there ore no<br />
significont onticipoted projecT impocts. For CEQA complionce on lnitiol Study (lS) will be prepored following<br />
completion of the l0% design. Following completion of the lS o Negotive Declorotion or Mitigoted Negolive<br />
Declorotion, os oppropriote, will be declored. The Negotive Declorotion (or Mitigoted NegoÌive Declorotion)<br />
will be circuloted for o 30-doy public review period ond will include the following:<br />
. A descripfion of the AWS Leok Detection & Repoir Progrom ond Phose I Project<br />
. The locolion of the project ond o site mop<br />
. The need for the project<br />
. A proposed findíng thot the Project will nol hove o significonl effect on lhe environment<br />
. An ottoched copy of the lnitiolStudy documenting reosons for the finding of no significont impocts<br />
. Mitigotion meosures, if opplicoble<br />
After the public review period, the Negotive Declorotion (or MitigoÌed Negotive Declorotion) will be finolized<br />
ond notice published.<br />
Note: This Work Plon provides for on lS ond Negotive Declorotion (or Mitigoted Negotive Declorotion) process<br />
to fulfill CEQA complionce. lf AWA Legol Counsel determines the project is Cotegoricolly Exempt under CEQA<br />
then the obove described tosk ond ossocioted tosk budget will be odjusted occordingly.<br />
Tosk ó Deliverobles:<br />
. lnitiolStudy<br />
. Approved ond odopted Negotive Declorotion or Mitigoted Negotive Declorotion<br />
. Publish Notice<br />
Tosk 7: Permitting