Tosk I Deliverobles:<br />
- UMRWA - CCWD gronf ogreement<br />
- Project stort-up coordinotion meeling<br />
- Monthly invoices<br />
- Reimbursementrequesls<br />
- Project Monitoring Plon<br />
- Project stotus reports to the Boord of Directors<br />
Tosk 2: Lobor Complionce Progrom<br />
Grant Agreement No. 460000XXXX<br />
Page 19 of42<br />
CCWD will retoin on opproved Third Porty Lobor Complionce (LCP) consultoni (B CCR 916426) to provide lhe<br />
LCP ond reporting.<br />
Tosk 2 Deliverobles:<br />
- Lobor Complionce Progrom<br />
- Annuol Reoort<br />
Tosk 3: Reporting<br />
Quorterly Progress Reports will be prepored ossessing the progress ond occomplishments of the West Point<br />
Woter Moin & Tonk Replocement Projecl. The Quorterly Reports will likely include the following informotion:<br />
. The time period covered by the report<br />
. Description of octivities since the previous report<br />
o Stotus of the project relotive to lhe progress schedule<br />
. An estimote of the percentoge of work completed<br />
. Records of exoenditures<br />
. Percenloges of Stote ond totol funding expended to dote<br />
. Key issues thot need to be resolved<br />
A Project Completion Report will olso be prepored of The end of the project. The report will include the<br />
following:<br />
. An executive summory (two poge moximum)<br />
. Records of expenditures<br />
¡ A con'ìgorison of the projected benefits versus the meosured benefits<br />
. A comporison of lhe originol schedule ond the octuolschedule<br />
. A discussion of problems thot occurred during construction ond how the problems were solved<br />
. Submittol of ony required deliverobles thot were not previously submitied<br />
. A lisi of required deliverobles submitted previously with dotes of submiltol ond DWR occeptonce<br />
CCWD will keep oll records ond documents pertoining Ìo the project for three yeors ofter project completion.<br />
Tosk 3 Deliverobles:<br />
- Quorterly Reports<br />
- Project Completion Report<br />
Budget Calegory (b): Lond PurchoselEosemenl<br />
CCWD will prepore legol descriptions for required pipeline eosements ond negotiote with property owners to<br />
ocouire the eosements. The eosements will then be recorded with the County. Lond for the Bummerville tonk<br />
site wos purchosed by CCWD in 1995 ond is olreody under Ìheir ownership.<br />
Budgef Cotegory (c): Plonning/DesignlEngineeringlEnvironmentol Documentolion<br />
Tosk 4: Assessment ond Evoluotion