Agendapkt032212 A.pdf - Amador Water Agency
Agendapkt032212 A.pdf - Amador Water Agency
Agendapkt032212 A.pdf - Amador Water Agency
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tosk I I Deliverobles:<br />
- lnspectors' Doily Reports<br />
Budget Cotegory (g): Other Cosfs<br />
Grant Agreement No. 460000XXXX<br />
Page 17 of42<br />
Costs ossocioted with required project-reloted consultotion with the AWA ottorney ond reloted fees ore<br />
included in this budget cotegory.<br />
Budget Cotegory (h): Construction I lmplemenÍotion Confingency<br />
Not opplicoble. There is no contingency opplied to this project.<br />
West Point Woter Moin & Tonk Replocement Proiect<br />
Projecl Sponsor;<br />
Coloveros County Woter District<br />
Project Descriplion:<br />
The Coloveros County Woter District (CCWD) will improve the domestic woter system serving the community of<br />
West Point by replocing deterioroting woter moins, oppurtenonces (such os hydronts, oir volves, ond service<br />
lines) ond o leoking redwood woter storoge tonk. The woter moin replocement will include 4,200 leeI of 12inch-diometer<br />
tronsmission moin olong Winlon Rood between the woter treotmenf plont ond downtown West<br />
Point ond on odditionol 2,000 feet of woter moins within lhe downtown oreo olong Moin Street ond Pine Street.<br />
Trenching within public roods will require removol ond replocemenl of on estimoted 450 tons of ospholfic<br />
concrele poving. A new ó0,000-9ollon, ignition-resistont, gloss-fused, bolted, steel woter storoge tonk will<br />
reploce lhe leoking redwood tonk ond 1,200 feet of golvonized steel woter line supplying the tonk will be<br />
reploced with o ductile iron woter line. Figure I shows the locotion of the infrostructure replocemenf.<br />
Budgel Cotegory (o): Direct Proiecf Administrotion Cosfs<br />
Tosk l: Administrotion<br />
Coordinotion<br />
UMRWA will be responsible for monoging ond distributing oworded gronl funds to Project Sponsor CCWD. Any<br />
gront money oworded to the West Point Woter Moin & Tonk Replocement Project will be directed to CCWD by<br />
UMRWA under on ogreemenl between the two ogencies.<br />
Work items to be included under this tosk include the UMRWA - CCWD gront ogreement, generol project<br />
odministrotion tosks (project stort-up coordinofion meeting, cloim preporotion, communicotions with UMRWA,<br />
ond Boord communicotions), progress meelings throughout the durotion of the project, preporotion ond<br />
implementotion of o Project Performonce Monitoring Plon, documenfs monogement ond schedule review.<br />
Additionolly, os porl of this tosk CCWD stoff willcoordinote internolly ond with other necessory ogencies,<br />
consultonts ond controciors in order to implement the project. Coordinotion will be required to execute The<br />
gront ogreement with DWR, obtoin the gront funds, ond complete invoices ond reimbursemenf requesls.<br />
Project Performonce Monitoring Plon<br />
A Monitoring Plon will be prepored for lhe West Point Woter Moin & Tonk Replocement Project to provide o<br />
fromework for ossessing ond evoluoting the project performonce once il is implemented. The Monitoring Plon<br />
will idenlify the meosures thot will be used to monitor progress toword ochieving the specific projeci gools of<br />
reducing/minimizing woter losses within CCWD's woter system, improving wofer quoliÌy ond improving woter<br />
supply reliobility. The Monitoring Plon will olso provide tools to monitor ond meosure project processes ond will<br />
guide finol project performonce reporting thot willfulfill gront ogreement requiremenfs.