03.03.2013 Views

Agendapkt032212 A.pdf - Amador Water Agency

Agendapkt032212 A.pdf - Amador Water Agency

Agendapkt032212 A.pdf - Amador Water Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AMADOR WATER AGENGY<br />

Board of Directors<br />

Regular Meeting<br />

12800 Ridge Road, Sutter Creek, CA 95685<br />

March 22,2012<br />

9:00 a.m.<br />

Webs ite Add ress : www.amadonrater.oro<br />

Please Note: Members of the public will have the opportunity to directly address the <strong>Agency</strong> Board of<br />

Directors concerning any item listed on the Agenda below before or during consíderation of that item.<br />

ln order to better accommodate members of the public, specific times for Agenda ltems will be heard at<br />

the specified time or soon thereafter. Agenda ltems without specific times may be rearranged to<br />

accommodate the Board's schedule.<br />

1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE<br />

2. ADDITIONS TO AGENDA<br />

a. ltems added to the agenda must be approved by the Board pursuant to Government<br />

Code Section 54954.2.<br />

3. PUBLIC COMMENT FOR MATTERS NOT ON THE AGENDA<br />

Discussion items only, no action to be taken. Any person may address the Board at this time upon any<br />

subject within the jurisdiction of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>; however, any matter that requires action will be<br />

referred to Staff for a report and action at a subsequent Board meeting. Please note there is a five (5)<br />

minute time limit per person<br />

4. CONSENT AGENDA<br />

Items listed on the consent agenda (see attached) are considered routine and may be enacted by one<br />

motion. Any item may be removed for discussion and made a part of the regular agenda at the request<br />

of a Board member(s).<br />

5. AGENCY GENERAL<br />

A. Proposition 84 lmplementation Grant<br />

1. Discussion and direction to Upper Mokelumne River <strong>Water</strong>shed Authority (UMRWA)<br />

representative respecting the Grant Agreement between the State of California<br />

(Department of <strong>Water</strong> Resources) and Upper Mokelumne River <strong>Water</strong>shed Authority<br />

respecting Integrated Regional <strong>Water</strong> Management lmplementation Grants which will be<br />

considered at the next UMRWA.<br />

2. Discussion and direction to the UMRWA representative regarding the Consulting<br />

Services Agreement between UMRWA and RMC <strong>Water</strong> and Environment, INC<br />

respecting consultant services for the Proposition 84 lmplementation Grant.<br />

BOARD OF DIRECTORS<br />

Gary Thomas, President Paul Molinelli, Vice President Don Cooper Robert Manassero Art Toy


3. Discussion and possible approval of the Project Sponsor Agreement between the<br />

Upper Mokelumne River <strong>Water</strong>shed Authority, <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>, and Calaveras<br />

County <strong>Water</strong> District respecting certain obligations of each entity for the lmplementation<br />

Grant.<br />

B. Administrative Policy Section 2025<br />

1. Discussion and possible adoption of Resolution No. 2012-05 approving revisions to Policy<br />

2025 regarding Board Meeting Agendas.<br />

C. FY 2010-2011 Financial Audit (10:30 or as soon thereafter as it can be heard)<br />

1. Presentation by Mr. Mike Zizzi of Leaf and Cole, LLP and possible action to accept<br />

the 201012011 Fiscal Year Audit.<br />

2. Direction to auditors to finalize the report.<br />

6. OVERVIEW OF AMADOR WATER AGENCY REVENUE PLAN<br />

A. Presentation by SCI Consultants on the proposed <strong>Amador</strong> <strong>Water</strong> System Community<br />

Facility District, the Gravity Supply Line Community Facility District, and the <strong>Agency</strong> System-<br />

Wide <strong>Water</strong> Rates.<br />

7. AMADOR WATER AGENCY SYSTEM.WIDE WATER RATE STUDY<br />

A. Presentation by Reed Consulting, discussion, and possible direction to send Proposition<br />

218 notices regarding the proposed <strong>Agency</strong> System-Wide <strong>Water</strong> Rates.<br />

8. CAWP<br />

A. Gravity Supply Line Community Facility District<br />

1. Discussion and possible adoption of Resolution 2012-05 Declaring lntention to Establish a<br />

Community Facility District respecting the Gravity Supply Line Project.<br />

9. COMMITTEE REPORTS<br />

a. Budget and Finance (03-07-12)<br />

b. Engineering Committee (03-l 4-121<br />

c. Gommunity Outreach Gommittee (3-15-121<br />

d. Policies Gommittee (3-15-12)<br />

10. BOARD OF DIRECTOR DISTRICT REPORTS - The Board Members may report on various<br />

activities, meetings, etc. that they have been involved in within their respective districts.<br />

Discussion only, no formal action will be taken. Any matter requiring action will be placed on an<br />

upcoming agenda for consideration.<br />

11. GENERAL MANAGER'S REPORT- General discussion of various issues for informational and<br />

communication purposes. Discussion only, no formal action will be taken. Any matter requiring<br />

action will be placed on an upcoming agenda for consideration.<br />

12. FUTURE AGENDA TOPICS -This item is to provide the Board Members an opportunity to<br />

request items to be placed on future agendas.<br />

BOARD OFDIRECTORS<br />

Gary Thomas, President Paul Molinelli, Vice President Don Cooper Robert Manassero Art Toy


I3. CLOSED SESSION.<br />

A. Pursuant to Government Code Section 54957.6 -Conference with Labor Negotiato(s)<br />

(Gene Mancebo, Karen Gish, Gary Thomas, Paul Molinelli) - Confidential Bargaining Unit<br />

(CBU) and AWA Employee Association<br />

B. Conference with Legal Counsel Pursuant to Government Code Section 54956.9(a)-<br />

Pending Litigation- Kenneth Perano and Ken Berry vs <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> (<strong>Amador</strong><br />

Superior Court Case No. 12-CV-7718)<br />

14. ADJOURNMENT<br />

BOARD OF DIRECTORS<br />

Gary Thomas, President Paul Molinelli, Vice President Don Cooper Robert Manassero Art Toy


AMADOR WATER AGENCY<br />

CONSENT AGENDA<br />

March 22,2012<br />

Items listed on the consent agenda are considered routine and may be enacted by one motion. Any item may be removed for<br />

discussion and made a part of the regular agenda at the request of a Board member(s).<br />

1. MINUTES<br />

A. Approval of minutes of the Special Board Meeting of March 5,2012<br />

B. Approval of minutes of the Special Board Meeting of March 6,2012<br />

2. MISCELLANEOUS APPROVALS<br />

A. Approval of Accounts Payable for the month of February<br />

ln compliance with the Americans with Disabilities Act, if you are a disabled person and you<br />

need a disability-related modification or accommodation to participate in this meeting, then<br />

please contact Cris Thompson at (209) 223-3018 or (209) 257-5281 (fax). Reguesfs must be made<br />

as early as possró/e, and at least two-fullóusrness days before the start of the meeting.<br />

Documents and materials relating to an open sessr'on agenda item that are provided to the <strong>Amador</strong> <strong>Water</strong><br />

<strong>Agency</strong> Board of Directors less than 72 hours prior to a regular meeting will be available for public inspection<br />

and copying at 12800 Ridge Rd, Sutter Creek CA 95685<br />

BOARD OFDIRECTORS<br />

Gary Thomas, President Paul Molinelli, Vice President Don Cooper Robert Manassero Art Toy


A<br />

Gonsent Agendo ltem | ,fi unapproved<br />

AMADOR WATER AGENCY BOARD OF DIRECTORS<br />

Special Board Meeting<br />

March 5,2012<br />

MINUTES<br />

Directors Present: Gary Thomas, President<br />

Robert Manassero<br />

Paul Molinelli<br />

Art Toy<br />

Directors Absent: Don Cooper<br />

Staff Present: Gene Mancebo, General Manager<br />

Cris Thompson, Clerk of the Board<br />

<strong>Agency</strong> Counsel Josh Horowitz, via teleconference<br />

CALL TO ORDER President Thomas called the Special Board meeting to order at 3:01<br />

p.m.<br />

PLEDGE OF ALLEGIANCE<br />

CAWP RETAIL<br />

Discussion and possible action regarding past due payments for the Ranch House<br />

Storage Tank Agreements regarding parcel APN 038-21 0-068.<br />

Direction was given to General Manager to proceed with discussions with the potential<br />

buyer of the property and schedule a closed session meeting for real property<br />

negotiations on Tuesday March 6,2012 at 4:30 p.m.<br />

MOTION: lt was moved by Director Toy, seconded by Director Molinelli and carried to<br />

adjourn the meeting.<br />

ADJOURNMENT- President Thomas adjourned the meeting at 3:52 p.m.<br />

Cris L. Thompson<br />

Clerk of the Board of Directors<br />

Approved:<br />

i, ,eci¡; Bo;L'riINI ;eting<br />

M¿rr h 5 2012<br />

tagel


Consent Agendo ltem I , b,<br />

AMADOR WATER AGENCY BOARD OF DIRECTORS<br />

Special Board Meeting<br />

March 6,2012<br />

MINUTES<br />

Directors Present: Gary Thomas, President<br />

Robert Manassero<br />

Art Toy<br />

Directors Absent: Don Cooper<br />

Paul Molinelli<br />

Unapproved<br />

Staff Present: Gene Mancebo, General Manager<br />

Cris Thompson, Clerk of the Board<br />

<strong>Agency</strong> Counsel Josh Horowitz, via teleconference<br />

CALL TO ORDER President Thomas called the Special Board meeting to order aI 4:31<br />

p.m.<br />

GLOSED SESSION was called at 4:32 p.m.<br />

Pursuant to Government Code Section 54956.8- Conference with Real Property<br />

Negotiators- <strong>Agency</strong> Negotiator, Gene Mancebo concerning APN 038-210-068<br />

OPEN SESSION RESUMED at 4:49 p.m.<br />

President Thomas reported that the Board voted to accept Amendment #1 to the<br />

agreement respecting a combined storage facility dated June 25, 2003, and affirmation<br />

and assumption of said agreement by the following vote:<br />

Ayes: Director Thomas, Director Toy and Director Manassero<br />

Noes:<br />

Absent: Director Cooper, Director Molinelli<br />

MOTION: lt was moved by Director Toy, seconded by Director Manassero and carried<br />

to adjourn the meeting.<br />

Special Board Meeting<br />

March 6,2072<br />

Page 1


ADJOURNMENT- President Thomas adjourned the meeting at 4:52 p.m.<br />

Cris L. Thompson<br />

Clerk of the Board of Directors<br />

Approved:<br />

raicl ; leeting<br />

iarci. ,,2072<br />

Page2


i:HEf i{,*<br />

5-f4Ðtr<br />

-¡.?,1,f,4<br />

-i?'t'¡1<br />

-i?4ÉÉ<br />

s.74{r7<br />

n?+'3if<br />

tr?qd"<br />

È? q ì,]<br />

-¡?4 i I<br />

s?,t 1P<br />

,{?.ì I r,<br />

È?414<br />

-\9.11 !<br />

È,Í4 1Ë<br />

,À:r,ì i G<br />

Li?'5 l. ?<br />

-a94Eir<br />

ð?{el<br />

L\?4ge<br />

Èt,¡31<br />

tç,ï:'¡<br />

È?431r<br />

-i? iig-r.<br />

F?,TEf<br />

-i?4eE<br />

ti?,rtg5<br />

È"4:{i<br />

s'+,,ì I1<br />

-i?^t:ii=<br />

-i?4f iì<br />

.i?41,¡<br />

,i?4f5<br />

!r?ll'-1.Í<br />

É.?4fl<br />

Ê?4ìA<br />

F74l?<br />

.Àç44t¿<br />

L\?,ì-+3<br />

h?44f<br />

à?9.ìE<br />

¡?9.i6<br />

_


Ál'í9,ÐÉft t\iÉlËii: AÈP:i'l{]I<br />

åti:L-iit,¿-i-Ff FA\'*DLe L iÊ F<br />

ÊDR PË¡l IBE FEû ¡¡1, eç1e TriRrfUG!-i FEã eF/ el.i.<br />

,il-i:üvl* PAf EÊ f,'Er:ii]iì iFTiiii!<br />

Èçr+5¿ gjtJEEli- PËA ljEeÏÉ+j f {.Ê. r'.ir1t+FELL Ì-- LiTT Sï,5i'9<br />

És.+54 :4fiaHuÉ,J Tii{ t}tilECTOñ:ã Ë:l(FE¡'l.9E<br />

.tr?!+E(+ t,{ 5 Eêf4!4. rlti.îPLrËrt+'IÍ cñEf,,I? [,ÊtìÐ, +êí1+1<br />

å++9= Ul{rl.¡EeSrilt 8!-¡tLC.Ii'.f,ç SEAVI ÊLH\¡Lfr¡(Ì 9i¡PFLïEÞ<br />

å1':if i i-¡F-{iltt¡Tai' FÐltt- ilE¡¡tHF cHL_,31t !¡JE<br />

r,94Sf !,¡ÐL[ê¡if] ìl?t4l,tut.irc4Trrj¡¡.t ,É Êt1Çí{.tia-RtJ1t-qi_,¡¡\t-rÎu ['!åLEiii,] ¡a,il-E.Ì<br />

ÊJ9+=E SEErlä¡1|í lii1î{ LûE!"iit ÌftÉi¡E'.-<br />

¡..ç¡+51 I'ISTE¡ÌEU+-.]E ËC,:.e |J.qIEÊEL¡F-.E AEEú{lI.qTitlh!<br />

F-?4LQ i'¡ECÐ I¡¡ã,UËTÊIÍ5 EE¡EA i{CEE ?t=¿C.-'a<br />

#r+â1. tjILEY FRTCE 7¡1 ÊAilljL!1,.ãC|+ teSÐF.¡E¡¿"cLÐYl^lH',FF LéFl<br />

ÞF.|¡E-C ÉFL+i: PnËi-lrff,a.t *Bi:t'fi<br />

Ê.ì-+Él ,/;El,rIÌ"i ,qt{[,EeF.!]f\1 ttEF:;i''ll FAÊ e54 5F.j{F1¡9ii<br />

s?JiÐj,<br />

'lLiFìüE¡r<br />

LÐAltl SEñVíriË5 ÊÊFuNiü' FilF ii.t{j,¡ift PIiiË 3t.<br />

¿9+E5 Ð-llDrllrf r:Ei'.lThl+L f¡î(l LÐAÉEht ?;3?tç;å+,+п<br />

jlt(.¡ GÐuEE¡11.18t,!T lr,jrl F!_A¡JTfiÐf.,iEC5 PÐE1 iiß<br />

åF4rÈi" r:Ë¡¡Tt¡Ëv. el ftËFlr¡ti.-Fr3ã-, -¿G+f= l,!&îl¡4'tiåt+ÊÉ-'<br />

I I fY ili- 5l-!TIEF CAËF-?'<br />

ÂçGËEi(El',iî lii<br />

ÉjF'+81 =ETTLE|.|!:¡,1Í<br />

i_-E.:lí_E\' ilL E?{Ef'lT rEi.Uf'.iS FìfFt 1C,¿11 FL=EÍAF.1'<br />

,59+9íl riÐLgl"iEl-i_ Ê*¡.íf1Eñ AEF;-lal:i J:Ðft. a+7 EAiIL¿ L1F.<br />

È-?+91 tll{E.q-Tce 1{E|'1EE¡ìSH!F'ftE¡¡El.lê;_./r}LrËt{rlFì\.i<br />

à91¡9e ßAFFER TIÉE CiltlPÁilï i!.,]C f]!trìlc, lE4ã 1I¡ìEE FÐ-C12¿<br />

Èl/+9:l B,¡\l,¡Ei{FqrñI PñÈPERÍ IF:-l - FlEi{:'flF FËÊl fã7il SLJîllT r:;=rirAÈ<br />

,f?+?Ji Et'!PLri\'î'18¡¡T tEVEt-ilPi{i¡,lt r::&L-iF i-r¡.¡E,1FL.,lYt{E¡lf :i.1:È S5'+ri.-<br />

¡-F]+tE tl {s¡¡ ËG¡{I ¡l:EF{-;!!tr -;Ê i:li',;Li¡¡Tnli E;lfr<br />

5--.,i;'4 Fåij-tEi{*î{f 4{CESFI I-¡TIL ñÉË+-¡¡\iì¡ ií}+ 2=t¿41. äï"¡* EÈ<br />

Ê-?4+-f FEI-CAt"tELLfA \.rftLLEl fÊÉË5 .tBPi,/[r]í,rF<br />

É-9+ç-Ê Èf-r{ nOO,r=- ñEFl-¡liB 'a,]n eÛf Eii¡;EÐRCi'lír, EÊ<br />

å9++ï- í'(Attgft L çiSH Tgir\rEi::/ f ítÉri-li!il]]<br />

uqÉ¿çtli r]¡ ÍT,l FDr3T,4L_ iieÉ DÍ:nf fiÍ-F<br />

,t'l5rli fi91:íl ìjlj¡1Pp,l{'r' Fl-!¡j¡jL-ìí- liÉ[, ÐFEr:<br />

bç.Êr1-1¿ LtçåN äEI¡',íE1EÊ ãËFr¡ñã FÐ+ :elzrl ifÉ,\üüídl]íiB¡-l$<br />

.å95rlf A¡4BEEA Hr¡¡TD!,,t ]-Rp.r¡tl¡¡r]<br />

..999ù4 Hfjl'{r ?,1 Srll..fE !¡.iC rit,,íLE,qüER I}*SELi¡lE FÐ.q .{A¡,1<br />

¿t545 ig,)ll.] r-iFFICE::EJ¡:¡-rlI$¡iE ÂBi,tI-il/-SHllFfË¡¡G Ê*ãf:Efi ],!rhil.¿I<br />

|-î5L1å ',iål't$.IF- FAÊ]'¡\tEÊ5ii:P F-:€Fl.rl,it FtlËì iÊ7tii, âLr6ll(t r.iEl,-rAR<br />

F-FÍllf F,ii'¿+É8Dtt .jlli\lÌ-:S EEFr-:¡ili FÐh'' í¿¿'Ê5 E"tEi-fl,i íi¡ìi'<br />

,5F5C,E l'fr: i'låËTEErl&r=F¿ ll'¿il ãf&ilrlLEã5-Ëj'E€L c.;:ÊEVE./1c1PÊ<br />

Ê.ttilì LAFñ/ l,l'fEãS F¿EFLrl.¡t t}.aÉl alE.Eü {'lflÐC.FErìt'¡ BR<br />

¿:'51C ¡¡ùÊEt4 CÐNÐ1JL-TIi{ç fi{REFE¡IßEitî t;ï?_¡By if- 1lÂ,{iF<br />

,5Fç11 CêñÐf:- t-jr-5ifl.¿ Ê';Fr-I¡ìi} FIE lrlÊÊ! ELír¡#fiir=ÐB I,JeÍi<br />

t,ì=,L'F: Í G ù. 'r_ F¡,¡Fiji{¡-- ilÊ,/17.5ì:}!-i 1Ë5iå<br />

à'ìEíf PAiE Sl-rFet-'!'ii.thli l--iirE tAiìE =Íf:\ ?rj:E'1,,_L<br />

ålgi+ íjí_¡F':í í5iiEÊ êEF:í.,¡i+ FEF.L 1!jrÐ.'l- ¡!ÌilttËËA C,¿<br />

ta?=_1E çUSIi'iEtr]3<br />

"ROçEEESM ,r-UÐ -J.LrÉ.ERr,rIÊ,1ÊE .;AFE"f-.t<br />

Ë¡_iLLETii,¡<br />

L1'i7È. IÌUÍLL ÙÐËÊÐIIA|íIfI,,¡ AFF'CE .9!-IIFLIEE<br />

ñ?5.'r" i{i/i¡¡Ði I?EE¡E - FFFI.ìF}E FrlÊ tàÐ.-re ÊE'tAÉ t+l.=I$ä-Ërf<br />

ú7:13 tiil-JEFtÍ iìÈFìi4'ì ¡l;.ii:f,tr'lû'¡ii¡E i_ü!lF, r_tiL,iFl_TEf{, REp!-AilE Fnâ¡tT<br />

å9É-!l- E¡.-I iêDËîlí ãt,f!11- frE'aí.¿¡ii, i,:lil lÈlrêi TirEE¡lf St<br />

ÈçgËci TIi4 Lì¡ìLÐEã-Ê F=Fi,tl'iF if¡E Ê5+ sFt¡+{Sil Éf<br />

s?:ã1 f-:AþìCr* ä,:iJl,rLI ÐEPDË.rl VEFr-,lil) FEE ¡tl.iì<br />

f'Jr^Ë {<br />

ét,1ìtLq'tT<br />

f , Pe{:. {irj<br />

E+ J¿E<br />

l, 19F Ðf<br />

1-Ct ,5i<br />

i-L<br />

>)l<br />

Ðtr-7 îq<br />

É+. T:<br />

¿(f,r:¡ . "l'G<br />

f ,sFlti z5<br />

.1ì- t--,çt<br />

t,{+E- 7l}<br />

È,? +i,<br />

Ë? iê<br />

¿fÐ E1<br />

åe1 ec<br />

+ -+- ,--j<br />

el. ¿,1.9 le<br />

1i1¿ .-rE<br />

1.4. ¡cÊ<br />

ê"-ÌÉ ';c.<br />

1-19. 4ti<br />

EqÞ t]4,<br />

E-il, !!I r--irj<br />

ltl' +¡-<br />

E. =C'<br />

'êe. fz<br />

aÊ ii?<br />

liriE å3<br />

iL Í"<br />

!r:15 E\-'<br />

TÌ çÉ<br />

'I È-q . rl7<br />

7, ,tir.a Zt-<br />

3,.tt7 t+<br />

1¿ 5ç<br />

¡rJ r:'i]<br />

thE, 4È<br />

-J1 Êe<br />

11l]. 1fû<br />

LAE L+<br />

aÞL +d<br />

i:17 \-e<br />

ih It<br />

t+ =-L<br />

¡':,rÞ 91<br />

9::ql<br />

ttl¡ i2--7<br />

AE È,?<br />

:Fl<br />

=l<br />

i. ,:ì¡:1t ,:t;r


Mñ Mætingt fitllaruft 222Ol2 AGENDA TTETIil 5.A.1 &2&3<br />

STATFREFORT<br />

Proposition 84<br />

lm plementation Grant Agreement approval and<br />

Dircction to U M RWA Representative<br />

Reouested Action:<br />

Approve the Project Sponsor Agreement between Upper Mokelumne River <strong>Water</strong>shed Authority<br />

(UMRWA) and the <strong>Water</strong> <strong>Agency</strong> regarding the Proposition 84 lmplementation Grant and provide<br />

direction to the <strong>Agency</strong>'s representative to vote in favor of approving proposed agreements<br />

between UMRWA and the State of California and between UMRWA and RMC <strong>Water</strong> and<br />

Environment, INC respecting the implementation Grant.<br />

Backaround:<br />

The <strong>Water</strong> <strong>Agency</strong> through UMRWA has been awarded $570,830 in grant funds for the Lake<br />

Camanche Village Tank Rehabilitation and Lateral Replacement project and $232,573 in grant<br />

funds for the <strong>Amador</strong> <strong>Water</strong> System Leak Detection and Repair project. The Lake Camanche<br />

Project is nearly 100% grant funded with a small amount matching funds (in kind labor<br />

acceptable) while the <strong>Amador</strong> <strong>Water</strong> System project requires a 25% match. These primarily grant<br />

funded projects have been reviewed by the Board with direction to proceed. These agreements<br />

set forth certain requirements associated with the implementation of the projects. All three of<br />

these agreements have been reviewed by legal counsel for UMRWA and are recommended for<br />

approval.<br />

Fiscal lmpact:<br />

Matching funds for the Lake Camanche project are $6,580 and for the <strong>Amador</strong> <strong>Water</strong> System<br />

project, matching funds are $77,667. Both projects must be included for the overall grant.<br />

Reviewed bv Committee: No.<br />

Recommendation: Approve the Project Sponsor agreement and direct the AWA UMRWA<br />

representative to vote in favor of the two UMRWA agreements mentioned above associated with<br />

Proposition 84 lmplementation grant.<br />

Prepared bv:<br />

Gene Mancebo, General Manager


UPPER MOKELUMNE RIVER WATERSHED AUTHORITY<br />

PROJECT AGREEMENT<br />

PROPOSITION 84 IMPLEMENTATION GRANT PROJECT<br />

2012, by and<br />

This Agreement is made and entered into as of the<br />

- day of<br />

between the Upper Mokelumne River<br />

-,<br />

'<strong>Water</strong>shed Authority (UMRWA), a joint exercise of<br />

powers authority formed under California Govemment Code section 6500, and <strong>Amador</strong> <strong>Water</strong><br />

<strong>Agency</strong> and Calaveras County <strong>Water</strong> District, upon their execution of this Agreement (who are<br />

referred to in this Agreement as Project Sponsors), to provide for carrying out the Project<br />

Sponsors implementation projects funded wholly or in part by a Proposition 84 Implementation<br />

Grant.<br />

RECITALS<br />

A. UMRWA is a joint powers authority, formed in the year 2000 to serve and represent<br />

regional water resource interests and to assist its members in protecting and enhancing water<br />

quality, water supply and the environment.<br />

B. <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> (AWA) is a water agency formed by a 1959 special act of the<br />

California Legislature as the <strong>Amador</strong> County <strong>Water</strong> <strong>Agency</strong> for the pu{pose of providing water,<br />

wastewater and storm drain services to <strong>Amador</strong> County.<br />

C. Calaveras County <strong>Water</strong> District (CCWD) is a water district formed in 1946 under the<br />

laws of the state of California for the purpose of providing water and wastewater service to the<br />

residents of Calaveras Countv. California.<br />

D. UMRV/A, on behalf of Member Agencies, applied for and has been awarded a<br />

Proposition 84 Implementation Grant to fund implementation projects by Project Sponsors.<br />

E. UMRWA and the Project Sponsors desire to carry out the projects funded wholly or in<br />

part by the Proposition 84 Implementation Grant.<br />

In consideration of the promises, terms, conditions and covenants contained herein, the<br />

parties to this Agreement hereby agree as follows:<br />

1. Recitals Incorporated. The foregoing recitals are hereby incorporated by reference.<br />

2. Implementation Projects. The projects that UMRWA and the Project Sponsors<br />

desire to carry out, and the associated grant amounts, are the following.<br />

l. Lake Camanche Tank Rehabilitation &,Lateral Replacement Project AWA $ 570,830<br />

2. <strong>Amador</strong>'<strong>Water</strong> System Leak Detection and Repair AWA s 232.573<br />

3. West Point <strong>Water</strong> Main and Tank Replacement Project CCWD 91,494,596<br />

Total $2,298,000<br />

1


3. Implementation Project Coordination Committee. The Project Sponsors and<br />

UMRWA hereby form an Implementation Project Coordination Committee consisting of one<br />

representative (and one or more alternates) designated by each. This committee will meet as<br />

necessary from time to time to address issues related to the administration of the Implementation<br />

Grant and the implementation of this Agreement.<br />

4. Role of Project Sponsors. The Project Sponsors acknowledge that UMRWA will<br />

execute a grant agreement with the Califomia Department of <strong>Water</strong> Resources (DWR) to accept<br />

the Integrated Regional <strong>Water</strong> Management Implementation Grant. The Project Sponsors shall<br />

assume responsibility of individual project management, oversight, compliance, and operations<br />

and maintenance of their respective projects. The Project Sponsors shall also act on behalf of<br />

UMRWA in the fulfillment of responsibilities as specified in the grant agreement with DWR.<br />

Specihed responsibilities are identified in Exhibit I of this Project Agreement. UMRWA will<br />

have no obligation to prepare and submit invoices or take any other actions on behalf of, or<br />

liability for failing to take any action in regard to obtaining reimbursement for, any Project<br />

Sponsor that breaches one or more of its responsibilities provided in this Agreement or Exhibit 1<br />

hereof and that fails to cure such breach promptly after receipt of notice from UMRWA of the<br />

breach and requirements for curing the breach. UMRWA also will have no liability to any<br />

Project Sponsor for the unavailability of grant funds from the DWR or any other state or federal<br />

agency.<br />

5. Role of UMRWA. The Executive Officer of UMRWA will: (a) administer the<br />

Proposition 84 Implementation Grant with DWR on behalf of UMRWA and the Project<br />

Sponsors consistent with the terms of the Proposition 84 Grant Agreement and the provisions of<br />

this Agreement, (b) provide information to the Project Sponsors on grant administration status<br />

and related matters of mutual interest, and (c) serve as chair of the Implementation Project<br />

Coordinating Committee in carrying out its activities under this Agreement.<br />

6. UMR\ryA Grant Administration Expenses. Of the $100,289 in Direct Project<br />

Administration grant funding, 569,557 will fund UMRWA's grant administration expenses. This<br />

amount will be designated to pay UMRWA's costs for managing and performing grant<br />

administration activities under this Agreement (including consultant fees, data collection and<br />

retrieval, report preparation, contract management, and related activities necessary to fuIfilI the<br />

terms of the Proposition 84 Implementation Grant agreement). The $69,557 for UMRWA grant<br />

administration costs will be charged by UMRWA to the three project budgets as follows.<br />

Project Total Grant Direct Project Project Sponsor UMRWA<br />

Lake Camanche Tank<br />

Rehabilitation & Lateral<br />

$ 570,830<br />

Admin Grant<br />

s 43,242<br />

Amount<br />

s12,342<br />

Amount<br />

$ 30,900<br />

Replacement Proiect<br />

<strong>Amador</strong> <strong>Water</strong> System Leak<br />

Detection and Repair<br />

s 232,573 $ 15,000 s0 $ 15,000<br />

West Point <strong>Water</strong> Main and<br />

Tank Replacement Proiect<br />

s7,494,596 s 42,047 $ 18,390 s 23,657<br />

Total $ 2.298.000 s 100.289 $30,732 $ 69,557<br />

2


7. Disbursement of Grant Funds to Project Sponsors. UMRWA will disburse to<br />

Project Sponsors within 30 days of receipt of the grant funds approved and paid through normal<br />

State processes. Funds will be disbursed by UMRWA consistent with each State approved<br />

invoice and in accordance with the project budgets contained in Exhibit C of the Proposition 84<br />

Grant Agreement. Any and all money disbursed to Project Sponsors under this agreement and<br />

any and all interest earned by Project Sponsors on such money shall be used solely to pay<br />

Eligible Costs as defined in Exhibit 1 attached hereto.<br />

8. Unfunded Grant Administration Costs. In the event the 569,557 grant amount<br />

specified in paragraph 6 for grant administration costs is insufficient to cover UMRWA's grant<br />

administration costs the Project Sponsors will pay an apportioned share of those unfunded grant<br />

administration costs as follows: AWA's apportioned share is 67%; CCWD's apportioned share is<br />

33Yo. Any request by UMRWA for additional grant administration funds will be presented in<br />

writing with supporting documentation to AWA and CCWD,<br />

9. Authorization to Proceed with the Project. The Project is authorizedto proceed<br />

upon execution of this Agreement.<br />

10. Term. This Agreement will remain in effect for as long as any obligations under<br />

this Agreement remain outstanding.<br />

11. Amendments. This Agreement may be amended by the parties hereto only in<br />

writing and signed by both parties.<br />

12. General Provisions. Any notice to be given under this Agreement may be made<br />

by: (a) depositing in any United States Post Office, postage prepaid, and shall be deemed<br />

received at the expiration of 72 hours after its deposit; (b) transmission by facsimile copy; (c)<br />

transmission by electronic mail; or (d) personal delivery. This Agreement shall be governed by<br />

the laws of the State of California. This Agreement may be executed by the parties in<br />

counterpart, each of which when executed and delivered shall be an original and all of which<br />

together will constitute one and the same document.<br />

The foregoing Proposition 84 Implementation Grant Project Agreement is hereby<br />

consented to and authorized by UMRWA and the Project Sponsors.<br />

Dated: _,2072<br />

Upper Mokelumne River<br />

<strong>Water</strong>shed Authority<br />

n<br />

J


Dated: ____-2012<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

Dated: _,2012<br />

Calaveras County <strong>Water</strong> District<br />

AT


EXHIBIT 1<br />

PROJECT SPONSOR OBLIGATIONS UNDER DWR PROPOSITION 84<br />

IMPLEMENTATION GRAI{T AGREEMENT<br />

Each Project Sponsor has agreed in accordance with Section 5 of the Project Agreement that it<br />

will fully and timely perform all Project Sponsor obligations. Under Article 6 of the Proposition<br />

84 grant agreement between UMRWA and DWR ("Grant Agreement"), each Project Sponsor is<br />

required to act on behalf of UMRWA for the purposes of individual project management,<br />

oversight, compliance, and operations and maintenance, and to act on behalf of UMRWA in the<br />

fulfillment of UMRWA's responsibilities under the grant agreement.<br />

The draft Grant Agreement is attached as Appendix A to this Exhibit I and made apart hereof.<br />

The attached draft agreement will be replaced, when executed, with the f,rnal document.<br />

UMRWA will provide each Project Sponsor with a copy of any revised drafts and the executed<br />

final Grant Agreement. Any new or amended terms and conditions in subsequent versions of the<br />

Grant Agreement will govern over the similar terms and conditions stated in this Exhibit 1.<br />

Each Project Sponsor will include all applicable provisions in this Exhibit 1 as contract terms,<br />

conditions or specifications in any consulting, construction or other contract let to a contractor or<br />

subcontractor to carry out any portion of a project funded under the Grant Agreement.<br />

With reference to the attached Grant Agreement, each Project Sponsor is required to:<br />

I. Financial Provisions<br />

A. Cost Share. Each Project Sponsor shall be obligated to provide its agreed local cost share for<br />

its project in the amount agreed between UMRWA and DWR and approved by Project Sponsor.<br />

These costs may include any costs for its project incurred after September 30, 2008 if so<br />

identified in the Implementation Grant application.<br />

B. General Funding Conditions. In order to be eligible for reimbursement of project costs, each<br />

Project Sponsor is required to comply with the following general conditions: (1) demonstrate the<br />

availability of sufficient funds to complete its project by submitting the most recent 3 years of<br />

audited financial statements; (2) if applicable, comply with Public Resources Code sectionl5102<br />

to notify any Califomia Native American tribe with traditional lands located within the project<br />

area of project construction (using contact list maintained by the Native American Heritage<br />

Commission); and (3) for groundwater management and recharge projects and projects with<br />

potential groundwater impacts, demonstrate compliance with the groundwater compliance<br />

options set forth on page I 5 of the IRWM Program Guidelines, dated August 2010.<br />

C. Elieible Project Costs. Project Sponsors may only apply grant funds to eligible project costs<br />

in accordance with applicable provisions of the law and Exhibit C of the attached Grant<br />

Agreement. Eligible project costs include the reasonable costs of studies, engineering, design,<br />

5


land and easement acquisition, legal fees, preparation of environmental documentation,<br />

environmental mitigations, monitoring, and project construction. Reasonable administrative<br />

expenses may be included as Project Costs, depending on the complexity of the project<br />

preparation, planning, coordination, construction, acquisitions, implementation, and<br />

maintenance. For a more detailed description of project costs that are eligible for reimbursement<br />

and costs that are not eligible for reimbursement, Project Sponsors should review Article 9,page<br />

2, of the attached Grant Agreement.<br />

D. Invoice Information. Invoices must include all of the information provided in Article 10, page<br />

3 of the attached Grant Agreement. UMRWA will provide Project Sponsors with information on<br />

preparing reimbursement requests and the information required to prepare and submit invoices to<br />

DWR. Each Project Sponsor will promptly respond to any UMRWA request for additional<br />

information necessary for UMRWA staff to prepare reimbursement requests acceptable to DWR.<br />

E. Accountin&and Return of Grant Disbursement. Each Project Sponsor is obligated to account<br />

for the expenditure of all grant funds received. Project Sponsor's obligations include all of the<br />

accounting, disclosure and return of funds provisions set forth in Article D.1, Exhibit D of the<br />

attached Grant Agreement.<br />

II. Permitting and Environmental Compliance<br />

A. Environmental Compliance. No Project Sponsor may proceed with any project work that is<br />

subject to CEQA and any other environmental permitting requirements until Participant: (1)<br />

submits all applicable environmental permits indicated on the Environmental Information Form<br />

to DWR; (2) provides copies of any CEQA documents required for its project to DWR; and (3)<br />

after DWR completes any required CEQA compliance review as a Responsible <strong>Agency</strong>, receives<br />

written concurrence from the DWR of Participant's CEQA documents and DWR's notice of<br />

verification o f environmental p ermit submi ttal.<br />

B. Permits. Licenses. and Approvals. Each Project Sponsor shall be responsible for ensuring that<br />

any and all permits, licenses, and approvals required for performing its project are obtained, and<br />

shall comply with federal, State and local laws, rules, and regulations, guidelines, and<br />

requirements applicable to its project. A partial list of such applicable laws is set forth in Article<br />

D.24, Exhibit D of the attached Grant Agreement.<br />

III. Reporting and Audit Obligations<br />

A. Submission of Reports. Each Project Sponsor will provide all reports (including Quarterly<br />

Progless, Project Completion, Grant Completion, and Post-Performance Reports), data,<br />

information, and certifications necessary for UMRWA to comply with all DWR reporting<br />

requirements provided in the Grant Agreement. UMRWA and/or its consultants will provide<br />

Project Sponsors with template report forms, reporting instructions and related assistance to<br />

ensure the timely preparation and submittal of all reports in the necessary formats required under<br />

the Grant Agreement. Project Sponsors will timely respond to any UMRWA requests for<br />

additional information and work on required reports. The types, format, content, and timing of<br />

-6-


equired reports is provided in Exhibit E to the attached Grant Agreement and Project Sponsors<br />

are encouraged to review and familiarize themselves with that information.<br />

B. State Audits. The State reserves the right to conduct an audit at any time between the<br />

execution of the Grant Agreement and the completion of any or all projects funded by the Grant<br />

Agreement. After completion of all projects, the State may require UMRWA to obtain a final<br />

audit conducted by an independent Certif,red Public Accountant. In addition, under Govemment<br />

Code section 8546.7, the State may audit the performance of the Grant Agreement or of<br />

individual projects for a period of three years after final pa),¡ment under the Grant Agreement<br />

(i.e., completion of all projects and payment of closing invoice). Project Sponsors, and their<br />

contractors and subcontractors, are required to preserve all project-related records and data for a<br />

minimum of three years after final payment under the Grant Agreement. See Exhibit H to the<br />

attached Grant Agreement for a listing of documents and records that State Auditors would<br />

require for review if this grant or any individual project(s) funded by it are audited.<br />

C. Disposition of Equipment. Upon UMRWA's request, each Project Sponsor shall provide a<br />

final inventory list of equipment purchased with grant funds provided by DWR with a current<br />

estimated fair market value of more than $5,000 per item. Under the Grant Agreement, DWR<br />

reserves the right to take title and possession of any items listed in the inventory that it identihed<br />

in writing within 60 days of receipt of such inventory. All other listed items shall become the<br />

Project Sponsor's property.<br />

D. Retention. DWR will retain l0o/o of the funds requested by UMRWA for reimbursement of<br />

project costs until after all projects are completed and UMRWA has complied with its obligation<br />

to submit all required reports as provided in Section III.A., above, and Article 17 of the Grant<br />

Agreement. Upon receipt of the retained funds held by DWR, UMRWA will distribute those<br />

funds to each Project Sponsor in accordance with the previously agreed amount due.<br />

IV. Project Construction and Operation<br />

A. Labor Compliance. Each Project Sponsor must independently adopt and enforce a Department<br />

of Industrial Relations-certified Labor Compliance Program ("LCP") meeting the requirements<br />

of Labor Code section 1771.5. Upon request by the State or UMRWA, each Project Sponsor<br />

will promptly submit written evidence of its compliance with the LCP requirements.<br />

B. Operation and Maintenance of Project. Each Project Sponsor shall ensure the proper start up<br />

and continued eff,rcient and economical operation of its project. Such obligation includes making<br />

all repairs, renewals, and replacements necessary to the efficient operation and maintenance of<br />

the project. Operations and maintenance costs of funded projects are not reimbursable expenses<br />

under the Grant Agreement and each Project Sponsor shall be solely liable for paynent of such<br />

costs.<br />

C. Acknowledsement of Credit. Project Sponsors shall include appropriate acknowledgement of<br />

the State and any cost-sharing partners for their support when promoting their projects or using<br />

any data or information developed under the Grant Agreement. During construction of a project,<br />

Project Sponsors must install a sign at a prominent location which shall include a statement that<br />

-7-


the project is financed under the Safe Drinking <strong>Water</strong>, <strong>Water</strong> Quality and Supply, Flood Control,<br />

River and Coastal Protection Bond Act of 2006, administered by State of California, Department<br />

of <strong>Water</strong> Resources. Each Project Sponsor shall notifu UMRWA and DV/R that the sign has<br />

been erected by providing them with a site map with the sign location noted and a photograph of<br />

the sign.<br />

D. Competitive Bidding and Procurement. Each Project Sponsor shall comply with all applicable<br />

competitive bidding and procurement laws and regulations when contracting for the acquisition<br />

of goods and services and construction of projects funded under the Grant Agreement.<br />

E. Inspections and Certification by Engineer.<br />

1. Upon completion of a project and as determined by State, each Project Sponsor shall<br />

provide for a final inspection and certifìcation by a California Registered Civil Engineer that the<br />

project has been completed in accordance with submitted final plans and specifications and any<br />

modifications thereto and with the Grant Agreement.<br />

2. The State shall have the right to inspect project work being performed at any and all<br />

reasonable times. Each Project Sponsor shall include provisions ensuring such access for the<br />

State in all contracts and subcontracts entered into for projects funded under the Grant<br />

Agreement. During regular office hours, State shall have the right to inspect and to make copies<br />

of any books, records, or reports of the Project Sponsor and its contractors and subcontractors<br />

relating to this Grant Agreement.<br />

V. Regulatory Requirements<br />

A. Child Support Obligations. Each Project Sponsor acknowledges and agrees that by<br />

participating in the grant, it recognizes the importance of child and family support obligations<br />

and will fully comply with all applicable state and federal laws relating to child and family<br />

support enforcement, including, but not limited to, disclosure of information and compliance<br />

with earnings assignment orders, as provided in Chapter 8 (commencing with section 5200) of<br />

Part 5 of Division 9 of the Family Code. Each Project Sponsor also will fully comply with the<br />

earnings assignment orders of all employees and will provide the names of all new employees to<br />

the New Hire Registry maintained by the California Employment Development Department.<br />

B. Drug-Free Worþlace. Each Project Sponsor certifies, under penalty of perjury under the laws<br />

of State of Califomia, its compliance with the requirements of the Drug-Free Worþlace Act of<br />

1990 (Govemment Code 8350 et seq.) and have or will provide a drug-free worþlace by taking<br />

all of the actions provided in Article D.74, Exhibit D to the attached Grant Agreement.<br />

C. Nondiscrimination. Each Project Sponsor acknowledges and agrees that it shall not unlawfully<br />

discriminate, harass, or allow harassment against any employee or applicant for employment<br />

because of sex, race, color, ancestry, religious creed, national origin, physical disability<br />

(including HIV and AIDS), mental disability, medical condition (cancer), age (over 40), marital<br />

status, and denial of family care leave. Project Sponsors shall comply with the provisions of the<br />

Fair Employment and Housing Act (Govemment Code Section 12990 (a-f) et seq.) and the<br />

-8-


applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section<br />

7285 et seq.). Each Project Sponsor shall give written notice of its obligations under this<br />

paragraph to labor organizations with which they have a collective bargaining or other<br />

agreement.<br />

D. Americans with Disabilities Act. Each Project Sponsor certifies that it complies with the<br />

Americans with Disabilities Act (ADA) of 1990, (42 U.S.C., I2I0I et seq.), and all applicable<br />

regulations and guidelines issued pursuant to the ADA.<br />

E. Groundwater Monitoring. Any Project Sponsor carrying out a groundwater project or project<br />

that includes groundwater monitoring requirements funded by the Grant Agreement shall ensure<br />

that such projects are consistent with the Groundwater Quality Monitoring Act of 2001 (Part<br />

2.76, commencing with Section 10780, of Division ó of <strong>Water</strong> Code) and, where applicable, that<br />

projects affecting water quality shall include a monitoring component that allows the integration<br />

of data into statewide monitoring efforts, including where applicable, the Surface <strong>Water</strong> Ambient<br />

Monitoring Program carried out by the State <strong>Water</strong> Resources Control Board.<br />

VI.<br />

Miscellaneous Provisions<br />

A. Comguter Software. Each Project Sponsor certifies that it has appropriate controls in place to<br />

ensure that grant funds will not be used for the acquisition, operation, or maintenance of<br />

computer software in violation of copyright laws.<br />

B. Project Monitorine Plan Requirements. Each Project Sponsor shall provide all data,<br />

information and cooperation requested by UMRWA to assist it with the preparation and<br />

submittal of the Project Monitoring Plan required under Article 22 of the attached Grant<br />

Agreement.<br />

C. Notification of State. Each Project Sponsor will promptly notify UMRWA in writing of the<br />

following:<br />

1. Events or proposed changes in a project that could affect the scope, budget, or work<br />

oerformed under the Grant Asreement.<br />

2. Any public or media event publicizing the accomplishments or results of a project<br />

funded under the Grant Agreement. Project Sponsors shall notify UMRWA at least 15 calendar<br />

days in advance of any such event to provide State representatives with the opportunity to attend<br />

and participate.<br />

3. Final inspection of a completed project by a Registered Civil Engineer (See Item IV.E,<br />

above). Project Sponsors shall notify RWA at least 15 calendar days in advance of any such<br />

inspection in order to provide State representatives with the opportunity to participate.<br />

D. . Project Sponsors shall not<br />

sell, abandon, lease, transfer, exchange, mortgage, hypothecate, or encumber in any manner<br />

whatsoever all or any portion of any real or other property necessarily connected or used in<br />

conjunction with their projects without D'WR's prior permission. Participants also shall not take<br />

-9-


any action relating to user fees, charges, and assessments that could adversely affect its ability to<br />

meet its obligations under the Grant Agreement, without prior written permission of State.<br />

E. State Indemnification. To the extent permitted by law, each Project Sponsor agrees to<br />

indemnify, defend and hold harmless the State against any loss or liability arising out of any<br />

claim or action brought against the State, and against any and all losses, claims, damages,<br />

liabilities or expenses, of every conceivable kind, character and nature whatsoever arising out of,<br />

resulting from, or in any way connected with: (1) the project or the conditions, occupancy, use,<br />

possession, conduct or management of, work done in or about, or the planning, design,<br />

acquisition, installation, or construction, of the Project or any part thereof; (2) performing any of<br />

the terms contained in the Grant Agreement or any related document; (3) any violation of any<br />

applicable law, rule or regulation, any environmental law (including, without limitation, the<br />

federal Comprehensive Environmental Response, Compensation and Liability Act, Resource<br />

Conservation and Recovery Act, <strong>Water</strong> Pollution Control Act, and Clean Air Act, and the<br />

California Hazardous Substance Account Act, Hazardous Waste Control Law and <strong>Water</strong> Code<br />

section 13304, and any successors to said laws), rule or regulation or the release of any toxic<br />

substance on or near the System; or (4) any untrue statement or alleged untrue statement of any<br />

material fact or omission or alleged omission to state a material fact necessary to make the<br />

statements required to be stated therein, in light of the circumstances under which they were<br />

made, not misleading with respect to any information provided by the Grantee for use in any<br />

disclosure document utilized in connection with any of the transactions contemplated by the<br />

Grant Agreement. Grantee agrees to pay and discharge any judgment or award entered or made<br />

against the State with respect to any such claim or action, and any settlement, compromise or<br />

other voluntary resolution. The provisions of this indemnification shall survive the term of the<br />

Grant Agreement.<br />

-10-


APPENDIX A<br />

PROPOSITION 84 GRANT AGREEMENT BETWEEN UMRWA AND D\ryR<br />

-11-


CONSULTING SERVICES AGREEMENT<br />

For Grant Support and Administration Services<br />

THIS CONSULTING SERVICES AGREEMENT ("Agreement") is entered into as of<br />

2012 by and between the UPPER MOKELUMNE RIVER WATERSHED AUTHORITY, a joint<br />

powers agency formed pursuant to the laws of the State of California ("Authority") and RMC<br />

WATER AND ENVIRONMENT, INC a California corporation ("Contractor").<br />

RECITALS<br />

A. Authority desires to obtain professional assistance to support and administer a State of<br />

Califomia Proposition 84 Implementation Grant awarded to the Authority.<br />

B. Contractor is in the business of providing professional services related to grant<br />

administrative support and administration.<br />

C. Authority desires to engage Contractor, and Contractor desires to be hired by<br />

Authority, to perform certain support and grant administration services upon the terms and<br />

conditions set forth in this Agreement.<br />

NOW THEREFORE, in consideration of the performance of the covenants herein<br />

contained, the parties agree as follows:<br />

I. SERVICES TO BE RENDERED BY CONTRACTOR.<br />

1.1 Contractor shall perform all consulting tasks described in Exhibit A, Scope of Work and<br />

Schedule, attached and incorporated by this reference (the "Work"). All services shall be<br />

rendered with the care and skill ordinarily used by members of Contractor's profession<br />

practicing in this geographical region, and shall be in accordance with regulatory<br />

requirements of any state or federal agencies having jurisdiction over the subject matter<br />

of this Agreement. Contractor acknowledges the Work may be funded by grant<br />

agreements secured by the Authority and/or the Contractor, as directed. Contractor shall<br />

be responsible for the technical accuracy of its services and documents resulting<br />

therefrom and Authority shall not be responsible for discovering deficiencies therein.<br />

Contractor shall correct such deficiencies without additional compensation unless such<br />

deficiency is directly attributable to defects in information furnished by Authority.<br />

1.2 Contractor is authorized to proceed with Work upon receipt of a Notice to Proceed and as<br />

directed by Authority. Contractor agrees to commence performance forthwith and to<br />

complete the Work in general conformance with the Schedule in Exhibit A. All work<br />

shall be completed no later than the dates required by the Proposition 84 Implementation<br />

Grant Agreement schedule.<br />

2. SERVICES TO BE RENDERED BY AUTHORITY. Authority agrees to make available to<br />

Contractor any requested data and information known to Authority and applicable to the<br />

Work.


3. CHANGES IN SCOPE OF SERVICES. Only the Authority's Board of Directors or its<br />

designees have the authority to agree to any extension of time, change order, change in the<br />

scope of work, change in the contract price, or other term or condition affecting either<br />

Contractor's or Authority's duties set forth herein. Adjustments in compensation shall be<br />

determined through negotiation between the parties to the Agreement. Contractor<br />

acknowledges that no Authority staff person or Authority officer other than the Board of<br />

Directors or its designees directly authorized to negotiate this Agreement or any changes<br />

thereto have the power to amend the terms and conditions of this Agreement. Any change not<br />

so authorized in advance in writing by the Board of Directors or such designee shall be null<br />

and void.<br />

4. TERMINATION OF AGREEMENT. Authority reserves the right to terminate this Agreement<br />

with or without cause on seven (7) days' written notice to Contractor. In the case of such early<br />

termination, Contractor shall be paid for all services rendered in accordance with the terms and<br />

provisions of this Agreement up to the effective date of termination, up to the maximum fee<br />

prescribed for any task.<br />

5. COMPENSATION TO CONTRACTOR. Contractor shall submit monthly invoices indicating<br />

hours of work expended and progress toward completion of each task. Invoices are to be sent<br />

to Rob Alcott, PO Box 383, The Sea Ranch, CA,95497. Compensation to Contractor shall be<br />

paid on a time-and-materials basis for hours actually spent in performance of the Work plus<br />

direct costs as shown on Exhibit B, in accordance with compensation set forth in Exhibit B,<br />

RMC Fee Estimate, attached and incorporated by this reference. In no event shall<br />

compensation for completion of the Work exceed the Total Fee amount of 542,442 as set forth<br />

in Exhibit B.<br />

6. SUPERVISION OF THE WORK.<br />

6.1 Contractor shall be solely responsible for all methods, techniques, sequences and<br />

procedures, and shall coordinate all portions of the'Work. Authority shall deal only<br />

through Contractor, who shall be responsible for the proper execution of the entire Work.<br />

6.2 Contractor shall be responsible to Authority for the acts and omissions of Contractor's<br />

employees, subcontractors, and their agents and employees, and any other persons<br />

performing any of the Work under a contract with Contractor.<br />

1. ASSIGNMENTS. Contractor may not assign, subcontract, or transfer its interest in this<br />

Agreement without the written consent of Authority.<br />

8. CONTRACTOR NOT EMPLOYEE OF AUTHORITY. It is understood that Contractor is not<br />

acting hereunder as an employee of Authority but solely as an independent contractor.<br />

Contractor, by virtue of this Agreement, has no authority to bind or incur any obligation on<br />

behalf of Authority. Except as expressly provided in this Agreement, Contractor has no<br />

authority or responsibility to exercise any rights or power vested in Authority. It is understood<br />

by both Contractor and Authority that this Agreement shall not under any circumstances be<br />

construed or considered to create an employer-employee relationship or a joint venture.


9. LICENSES. ETC. Contractor represents to Authority that it or its principals have all licenses<br />

and qualifications, of whatsoever nature that are legally required for Contractor to practice its<br />

profession and to perform the Work. Contractor agrees that Contractor shall, at its sole cost<br />

and expense, keep in effect at all times during the term of this Agreement any license that is<br />

legally required for Contractor or its principals to practice its profession and perform the<br />

Work. Contractor further agrees that any subcontractor engaged by Contractor to perform a<br />

portion of the Work shall similarly possess all licenses and qualifications of whatsoever nature<br />

that are legally required for the subcontractor to perform the portion of the Work that is the<br />

subject ofthe subcontract at issue.<br />

10. INSURANCE.<br />

10.1 Contractor shall take out and maintain at all times during the performance of any work<br />

to be done under the terms of this Agreement a policy or policies of insurance as<br />

follows:<br />

10.1 .1 General Liability - Commercial General Liability Insurance of not less than One<br />

Million Dollars ($1,000,000) combined single limit per occurrence for bodily<br />

injury and property damage, including but not limited to endorsements for the<br />

following coverage: Premises, personal injury, products and completed<br />

operations, blanket contractual and independent contractors liability.<br />

Commercial General Liability shall be on an Occurrence Form.<br />

I0.1.2 Automobile Liability - Automobile Liability Insurance of not less than One<br />

Million Dollars ($ 1,000,000) combined single limit per occurrence for bodily<br />

injury and property damage is required in the event motor vehicles are used by<br />

Contractor in the performance of the Agreement. Coverase must include<br />

owned. non-owned, and hired vehicles.<br />

10.1 .3 Professional Liability - In the event Contractor is a licensed professional, and is<br />

performing professional services under this contract, professional liability<br />

insurance is required with a limit of liability not less than $1,000,000 per<br />

occuffence.<br />

10.2 Contractor shall furnish a certificate of insurance satisfactory to the Authority's<br />

Executive Officer as evidence that the insurance required above is being maintained.<br />

Contractor agrees that the insurance required above shall be in effect at all times during<br />

the term of this Agreement. In the event said insurance coverage expires at any time or<br />

times during the term of this Agreement, Contractor agrees to provide at least 30 days<br />

prior to said expiration date a new certif,rcate of insurance evidencing insurance<br />

coverage as provided for herein for not less than the remainder of the term of this<br />

Agreement or for a period of not less than one year.<br />

10.3 Certihcates of insurance must include the following provisions:<br />

10.3.1 The insurer will not cancel the insurance coverage without 30 day prior written<br />

notice to the Authority; and


10.3.2 The Authority, its officers, officials, and employees are included as additional<br />

insured but only insofar as the operations under this Agreement are concemed.<br />

This provision shall apply to all liability policies except workers' compensation<br />

and professional liability.<br />

10.4 Contractor's commercial general and automobile liability insurance coverage shall be<br />

primary insurance as respects the Authority, its officers, officials, and employees. Any<br />

such insurance or self-insurance maintained by the Authority, its officers, officials, and<br />

employees shall be in excess of the Contractor's insurance and shall not contribute with<br />

it.<br />

11. WORKERS' COMPENSATION INSURANCE. In accordance with the provisions of Article<br />

5, Chapter 1, Part 7, Division 2 (commencing with Section 1860), and Chapter 4,Partl,<br />

Division 4 (commencing with Section 3700), of the Labor Code of the State of Califomia,<br />

Contractor is required to secure the pa¡rment of compensation to his employees and shall for<br />

that purpose obtain and keep in effect adequate Workers' Compensation Insurance. Contractor<br />

is aware of the provisions of Section 3700 of the Labor Code, which requires every employer<br />

to be insured against liability for workers' compensation or to permissibly self-insure in<br />

accordance with the provisions before commencing the perfonnance of the services of this<br />

Agreement.<br />

12. OWNERSHIP OF DOCUMENTS.<br />

l2.l Contractor agrees to maintain in confidence and not disclose to any person or entity,<br />

without Authority's prior written consent, any trade secret or confidential information,<br />

knowledge or data relating to the products, process, or operation of Authority.<br />

Contractor further agrees to maintain in confidence and not to disclose to any person or<br />

entity, any dala, information, technology, or material developed or obtained hereunder<br />

by Contractor during the term of this Agreement, except as directed by Authority. The<br />

covenants contained in this paragraph shall survive the termination of this Agreement<br />

for whatever cause.<br />

I2.2 The originals of all computations, drawings, designs, graphics, studies, reports,<br />

manuals, photographs, videotapes, data, models, computer files, software, and other<br />

documents prepared or caused to'be prepared by Contractor or its subcontractors in<br />

connection with these services shall be delivered to and shall become the exclusive<br />

property of Authority if requested by Authority. Authority is licensed to utilize these<br />

documents for Authority applications on other projects or extensions of this project, at<br />

its own risk. Contractor and its subcontractors may retain and use copies of such<br />

documents, with written approval of Authority.<br />

13. RETENTION OF RECORDS. Pursuant to Government Code section 8546.7, the performance<br />

of any work under this Agreement is subject to the examination and audit of the State Auditor at<br />

the request of County or as part of any audit of County for a period of three years after hnal<br />

payment under the Agreement. Each party hereto shall retain all records relating to the<br />

performance of the Work and the administration of the Agreement for three years after final


payment hereunder.<br />

14. INDEMNIFICATION. Contractor agrees to indemniff, defend (upon request of Authority)<br />

and hold harmless Authority and Authority's agents, board members, elected and appointed<br />

officials and officers, employees, and authorized representatives from any and all losses,<br />

liabilities, charges, damages, claims, liens, causes of action, awards, judgments, costs, and<br />

expenses (including, but not limited to, reasonable attorney's fees of Authority Counsel and<br />

counsel retained by Authority, expert fees, costs and staff time, and investigation costs) of<br />

whatever kind or nature (collectively "Claims"), to the extent caused or alleged to be caused<br />

by any negligent or willful error, act or omission of Contractor or Contractor's officers, agents,<br />

employees, independent contractors, subcontractors, or authorized representatives, unless such<br />

Claim arises out of the negligence or willful misconduct of Authority or its agents or<br />

employees.<br />

15. NON-DISCRIMINATION. Contractor agrees that, in the performance of services under this<br />

Agreement, Contractor will not discriminate or permit discrimination against any person or<br />

class of persons by reason of race, color, creed, sex, or national origin in any manner<br />

prohibited by Title VI of the Civil Rights Act of 1964 or any applicable State enactments, as<br />

said regulations may be amended.<br />

16. NOTICES. All notices herein provided to be given, or which may be given, by either party to<br />

the other, shall be deemed to have been fully given when made in writing and deposited in the<br />

United States Postal Services, certified with retum receipt requested, with postage prepaid and<br />

addressed as follows:<br />

To Contractor: RMC <strong>Water</strong> and Environment, Inc.<br />

Alyson'Watson, Project Manager<br />

2001 North Main Street<br />

Walnut Creek, CA 94596<br />

To Authority:<br />

Upper Mokelumne River <strong>Water</strong>shed Authority<br />

Rob Alcott, Executive Officer<br />

P.O. Box 383<br />

Sea Ranch, C495497<br />

With a copy to:<br />

Gregory Gillott, Authority Counsel<br />

810 Court Street<br />

Jackson, C^ 95642<br />

The address to which notice shall or may be mailed, as aforesaid, to either party shall or may<br />

be changed by written notice given by such party or the other, as hereinbefore provided, but<br />

nothing herein contained shall preclude the giving of any such notice by personal service.


17. PROJECT PERSONNEL. Contractor shall not change key project personnel without the<br />

approval of Authority. Key project personnel are defined for purposes of this Agreement as<br />

the Project Manager Alyson Watson.<br />

18. CONFLICT OF INTEREST. Contractor represents that it presently has no interest and<br />

covenants that it will not acquire any interest, direct or indirect, that represents a financial<br />

conflict of interest under state law or that would otherwise conflict in any manner or degree<br />

with the performance of the Work. Contractor further agrees that in the event the Contractor<br />

hires anyone with a conflict during the performance of this Agreement proper precautions will<br />

be taken to segregate the work so that the person with the conflict has no knowledge of or<br />

influence over the performance of the work under our contract.<br />

19. CONTRACT EXECUTION. Each individual executing this Agreement on behalf of<br />

Contractor represents that he or she is fully authorized to execute and deliver this Agreement.<br />

20. CONSTRUED PURSUANT TO CALIFORNIA LAW. The parties hereto agree that the<br />

provisions of this Agreement will be construed pursuant to the laws of the State of California.<br />

21. INCORPORATION OF AGREEMENTS AND AMENDMENTS. This Agreement contains<br />

all agreements of the parties with respect to any matter mentioned herein. No other Agreement<br />

or understanding pertaining to any such matter shall be effective unless in writing signed by<br />

the party to be charged. This Agreement may be modified by the parties hereto only in writing<br />

and signed by both parties.<br />

22. SEVERABILITY. The invalidity of any provision of this Agreement, as determined by a court<br />

of competent jurisdiction, shall in no way affect the validity of any other provision hereof.<br />

23. TIME OF ESSENCE. Time is hereby expressly declared to be the essence of this Agreement<br />

and of each and every provision thereof, and each such provision is hereby made and declared<br />

to be a material, necessary, and essentialpart of this Agreement.<br />

24. SEPARATE MEMBER ENGAGEMENTS. The parties hereto recognize that the Agreement<br />

is between the Authority and Contractor and not between Contractor and any Member or<br />

Members of the Authority. The parties hereto agree, however, that the Authority may engage<br />

the Contractor on behalf of any Member of the Authority (including Altemate Members) to<br />

perform additional watershed assessment work as may be requested by a Member.<br />

Accordingly, prior to the Authority's engagement of Contractor to perform said additional<br />

work, the Member and Contractor shall negotiate the scope of work to be performed by the<br />

Contractor and Member shall file with the Authority a written commitment to fully reimburse<br />

Authority for the additional agreed-upon work. Authority shall be invoiced by the Contractor<br />

for the additional work performed by Contractor and shall directly compensate the Contractor<br />

for such work.<br />

25. INFORMATION PROVIDED BY CONTRACTOR. Contractor shall be entitled to<br />

reasonably rely upon the information provided by Authority, Authority's representatives, or<br />

from generally accepted sources without independent verif,rcation except to the extent such<br />

verification is expressly included in the scope of services; provided, however, that Authority


eseryes the right to require verification if Authority has good cause to believe that<br />

Contractor's sources are incorrect.<br />

26. INVOICING AND PAYMENT. Contractor shall submit to the address noted in paragraph 5<br />

above monthly invoices for work performed and expenses incurred during the preceding<br />

month. With each invoice the Contractor will submit a monthly Progress Report which<br />

indicates the budget status of each task and subtask, and describes for each individual who<br />

performed work the tasks performed and the date and time spent on each task during the<br />

billing period. No retention shall be required. Paynent for all undisputed charges shall be<br />

made by the Authority within 45 days of receipt of the invoice. Disputed charges, along with<br />

supporting documentation which demonstrates the reasonableness of the dispute, must be<br />

communicated to the Contractor within 30 days of receipt of the invoice. In the event payment<br />

for undisputed charges has not been made within 45 calendar days from the date of the<br />

invoice, Contractor may, givingT calendar days written notice and without penalty or liability<br />

of any nature, and without waiving any claim against Authority, suspend all or part of the<br />

services. In order to defray carrying charges resulting from delayed payrnents, simple interest<br />

at the rate of 1.5 percent per month, not to exceed the maximum rate allowed by law, may be<br />

added to the unpaid balance of each invoice, after 90 calendar days from the date of the<br />

invoice.<br />

IN WITNESS WHEREOF. the oarties hereto have executed this Asreement as of the dav and vear<br />

first above written.<br />

UPPER MOKELUMNE RIVER<br />

WATERSHED AUTHORITY<br />

BY:<br />

Rob Alcott. Executive Officer<br />

CONTRACTOR:<br />

RMC WATER AND ENVIRONMENT. INC. a<br />

California corporation<br />

BY:<br />

Executive Vice President<br />

Federal Tax I.D. No.: g¿ 329s096<br />

ATTEST:<br />

BY:<br />

Executive Vice President


RMC SCOPE OF WORK - lmplementation Grant Support Services (ree $+2, soo)<br />

TASK 1. PROJECT SET-UP<br />

Subtask 1.L - Lake Camanche Tank Rehabilitation and Lateral Replacement Project<br />

Subtask 1.2 - <strong>Amador</strong> <strong>Water</strong> System Leak Detection and Repair Project<br />

Subtask 1.3 - West Point <strong>Water</strong> Main and Tank Replacement Project<br />

RMC will prepare templates, schedules, communication and coordination procedures, and other protocols<br />

as needed for use throughout implementation of the three above listed projects to ensure consistent<br />

invoicing and billing among all consultants and contractors. For example, each consultant and contractor<br />

must charge to the same tasks in order to effectively track budget expended and budget remaining in<br />

relation to percent completed.<br />

Task 7 DelÍverables (for the 3 projects listed above):<br />

. Report templates, schedules, communication and coordination procedures, and other protocols<br />

as needed for distribution to project proponents and team<br />

. One meeting with Project Sponsors AWA and CCWD and their contractor and consultant<br />

representatives to present and review templates, schedules, communication and coordination<br />

procedures, and other protocols<br />

2. INVOICE PREPARATION AND SUBMITTALS TO DWR and UMRWA (EBMUD Accounting)<br />

Subtask 2.1 - Lake Camanche Tank Rehabilitation and Lateral Replacement Project<br />

Subtask 2.2 - <strong>Amador</strong> <strong>Water</strong> System Leak Detection and Repair Project<br />

Subtask 2.3 - West Point <strong>Water</strong> Main and Tank Replacement Project<br />

RMC shall prepare and submit for DWR approval individual monthly grant disbursement invoices for the<br />

three funded projects. The invoices shall include:<br />

a) Costs incurred for work performed in implementing the contracts during the period identified in the<br />

particular invoice.<br />

b) Costs incurred for any interests in real property (land or easements) that have been necessarily<br />

acquired for a project during the period identified in the particular invoice for the construction, operation,<br />

or maintenance of a project.<br />

c) Appropriate receipts and reports for all costs incurred.<br />

d) lnvoices shall be submitted on forms provided by State and shall meet the following format<br />

requirements:<br />

1-) lnvoices must contain the date of the invoice, the time period covered by the invoice, and the total<br />

amount due.<br />

2) lnvoices must be itemized based on the categories specified in the Exhibit C. The amount claimed for<br />

salaries/wages/consultant fees must include a calculation formula (i.e., hours or days worked times the<br />

hourly or daily rate = the total amount claimed).<br />

3)Sufficient evidence (i.e., receipts, copies of checks, t¡me sheets)must be provided for allcosts<br />

included in the invoice.<br />

4) Each invoice shall clearly delineate those costs claimed for reimbursement from the State's grant<br />

amount, as depicted in Para 4, "Grantee's Cost" and those costs that represent Grantee's and Local<br />

Project Sponsors' costs in Para 5, "Grantee's Responsibility,"<br />

5) Original signature and date (in ink) of Grantee's Project Manager.


RMC shall also submit copies of the three individual project invoices to UMRWA (EBMUD Accounting) for<br />

payments to Project Sponsors AWA and CCWD.<br />

Task 3 Delìverables(for the 3 projects lÍsted above):<br />

. l-8 monthly invoices prepared and submitted to DWR for grant payments and to UMRWA (EBMUD<br />

Accounting) for Project Sponsor payments<br />

3. PREPARATION AND SUBMITTAL OF REPORTS TO DWR<br />

Subtask 3.1 - Lake Camanche Tank Rehabilitation and Lateral Replacement Project<br />

Subtask 3.2 - <strong>Amador</strong> <strong>Water</strong> System Leak Detection and Repair Project<br />

Subtask 3.3 - West Point <strong>Water</strong> Main and Tank Replacement Project<br />

RMC shall prepare and submit for DWR approvalthe reports listed below for each of the above listed<br />

projects. Reports shall meet generally accepted professional standards for technical reporting. All reports<br />

shall be submitted to DWR's Project Manager, and shall be submitted in both electronic and hard copy<br />

forms. lf requested, RMC shall promptly provide any additional information deemed necessary by DWR<br />

for the approval of reports. Reports shall be presented in the formats prescribed by DWR (DWR contract<br />

Exhibit E).<br />

a) Quarterlv Progress Reports: RMC shall prepare and submit to DWR Quarterly Progress Reports for each<br />

of the three projects on a regular and consistent basis to meet the State's requirement for disbursement<br />

of funds. Quarterly Progress Reports shallbe sentvia e-mail, to DWR's Project Manager, perthe Project<br />

Schedule. Quarterly Progress Reports shall provide a brief description of the work performed, Grantee's<br />

activities, milestones achieved, any accomplishments and any problems encountered in the performance<br />

of the work during the reporting period.<br />

b) Proiect Completion Reports: RMC shall prepare and submit to DWR separate Project Completion<br />

Reports for each of the three projects. Grantee shall submit a Project Completion Report within ninety<br />

(90) calendar days of project completion. Each Project Completion Report shall include a description of<br />

actual work done, any changes or amendments to each project, and a final schedule showing actual<br />

progress versus planned progress, and copies of any final documents or reports generated or utilized<br />

during a project. The Project Completion Report shallalso include, if applicable, certification of final<br />

project by a registered civil engíneer, consistent Standard Condition D-15,"Final lnspections and<br />

Certification of Registered Civil Engineer." A DWR "Certification of Project Completion" form will be<br />

provided by the State.<br />

Project Sponsor's consultants and contractors will provide RMC progress reports and invoices on time<br />

during project implementation and monitoring. The consultants/contractors will be responsible for project<br />

implementation and monitoring, while RMC will compile information, summarize progress, prepare<br />

reports, and coordinate with DWR and UMRWA.<br />

Task 4 Deliverdbles:<br />

. l-8 Quarterly Reports (6 reports for each of the three funded projects)<br />

. 3 Project Completion Reports (1 report for each of the three funded projects)


R<strong>Water</strong> end Environ¡nent Fee Estimate<br />

Upper Mokelumne River <strong>Water</strong>shed Authority<br />

MAC IRWM lmplementation Grant Administration Assistance<br />

Task 2: lnvoice PreDaration & Submittals to DWR<br />

Task 3: Preoaration & Submittal of Reoorts to DWR<br />

1. The ¡ndiv¡dual hourly rates include salary, overhead and prof¡t.<br />

2. Subconsultants will be b¡lled at actual cost plus 10%.<br />

3.otherd¡rectcoStS(oDcS)suchasreproduc.t¡on'deliver,m¡leage(rateSw¡llbethoseallow<br />

4. The hourly rates shown are estimated average rates for 201 2 through 20'l 4.<br />

Total Labor<br />

Costs (1)<br />

^ñ.^<br />

Total ODCS Total<br />

(3) Fee<br />

$42,196 $276 $304 $42,500


GRANT AGREEMENI BEilTVEEN THE STATE OF CAIIFORNIA (DEPARTMENT OF WAIER RESOURCES) AND<br />

UPPER MOKETUMNE RIVER WATERSHED AUÏHORITY<br />

TNTEGRATED REG¡ONAr WATER MANAGEMENT (rRWM) TMPTEMENTAITON GRANTS<br />

CAUFORN|A PUBUC RESOURCES CODE 575026 FTSEQ.<br />

THIS AGREEMENT is entered into by ond between the Deporfment of Woter Resources of the Stqte of Colifornio.<br />

herein referred to os the "Stote" ond the Upper Mokelumne River Wotershed Authority, o non-profit orgonizotion<br />

in the Counties of Amodor ond Coloveros, Stote of Colifornio, duly orgonized, existing, ond octing pursuont to<br />

the lows Thereof, herein referred to os the "Grontee", which porties do hereby ogree os follows:<br />

l. PURPOSE. Stote sholl provide o gront from the Sofe Drinking Woter, Woter Quolity ond Supply, Flood Control,<br />

River ond Coostol Protection Bond Act of 2006 to Grontee to ossist in finoncing projects ossocioled with the<br />

Mokelumne/Amodor/Coloveros lntegroted Regionol Woter Monogement (IRWM) Plon pursuont to Chopler<br />

B (commencing wiÌh Section 79560) of Division 26.5 of lhe Colifornio Woter Code (CWC), hereinofter<br />

collectively referred lo os "IRWM Progrom."<br />

2. TERM OF GRANT AGREEMENT. The term of this Gronl Agreemenf begins on the dote this Gront Agreement is<br />

executed by Stote, ond terminotes on April 30, 2013, or when oll of the Porties' obligotions under this Gronl<br />

Agreement ore fully sotisfied, whichever occurs eorlier. Execution dote is the dote the Stofe signs this Gront<br />

Agreemenl indicoted on poge B.<br />

3. GRANT AMOUNT. The moximum omount poyoble by Stole under this Gront Agreement sholl not exceed<br />

$2,298,000. Of this gronl omount, not less thon $l ,732,743 sholl be expended to projects thot benefit the<br />

criticol woter supply or woter quolity needs of disodvonloged communities (DAC) in the IRWM effort<br />

funded by this Gront Agreement. Of the totol gront omount, not less thon $194,238 sholl be expended to<br />

urbon ond ogriculturolwoter conservotion projects in the IRWM effort funded by this Gront Agreement.<br />

4. GRANTEE COST SHARE. . Grontee's cost shore is occounted for in lwo cotegories. required (i.e. cost shore to<br />

be included os port of the Gronlee's 25%tunding motch) ond odditionol cost shore (i.e., oll cost shore<br />

obove the minimu m 25% funding motch) . The Totol Project Costs for this Agreement ore eslimoted To be<br />

$2,382,247. Grontee sholl provide o Grontee Cost Shore (Funding Motch) in the omount of ot leost 25%<br />

(unless o Disodvontoged Community project woiver is gronted) of the Totol Project Cost. Grontee's Funding<br />

Motch is estimoted to be $84,247. Granlee's Funding Motch moy include cosl shore performed ofter<br />

September 30, 2008.<br />

5. GRANTEE'S RESPONSIBILITY. Grontee sholl foithfully ond expeditiously perform or couse to be performed oll<br />

project work os described in Exhibit A (Work Plon) ond in occordonce with Project Exhibit B (Schedule) ond<br />

Exhibil C (Budget). Grontee sholl comply with oll of the terms ond conditions of this Gront Agreement ond<br />

opplicoble Colifornio Public Resources Code (PRC) requirements.<br />

6. LOCAL PROJECT SPONSOR'S RESPONSIBILITY. Grqntee sholl ossign Locol Projecf Sponsors to oct on beholf of<br />

Grontee for lhe purposes of individuol project monogement, oversight, complionce, ond operotions ond<br />

mointenonce. Locol Project Sponsors sholl be ossigned in occordonce with the porticipoting ogencies<br />

identified in the Mokelumne/Amodor/Coloveros (MAC) IRWM Region Proposition 34lmplementotion Gront<br />

Applicotion. Exhibit F identifies Locol Project Sponsors. Locol Project Sponsors sholl olso oct on beholf of<br />

Gronlee in Ìhe fulfillment of Grontee responsibilities where specificolly specified in this Gront Agreement.<br />

7. BASIC CONDITIONS. Stote sholl hove no obligotion to disburse money for o project under this Gront<br />

Agreement unless ond until Grontee hos sotisfied the following conditions in occordonce with the Sofe<br />

Drinking Woter, Woter Quolity ond Supply, Flood Control, River ond Coostol Protection Bond Act of 2006.<br />

o) By signing this Gront Agreement, Grontee demonstrotes the designoted Locol Project Sponsors for eoch<br />

project ore owore of ond comply with the provisions of the Gront Agreement between Stole ond<br />

Grontee.<br />

b) Grontee demonstrotes the ovoilobility of sufficient funds Ìo complete the project, os stofed in the Gront<br />

Aword/Commitment Letter, by submiÌting the most recenl3 yeors of oudited finonciol stotements.<br />

c) Grontee complies with PRC S75102 to notify the Colifornio Notive Americon tribe (which is on lhe<br />

contoct list mointoined by the Notive Americon Heritoge Commission) of Project Construction if thot<br />

tribe hos troditionol londs locoted within the oreo of the Proiect.


Grant Agreement No. 460000XXXX<br />

Page 2 of42<br />

d) For groundwoter monogement ond rechorge projects ond for projects with potentiol groundwoler<br />

impocts, the Grontee must demonstrote complionce with lhe groundwoter complionce options set<br />

forth on poge l5 of the IRWM Progrom Guidelines, doted August 2010.<br />

e) For the term of this Gront Agreement, Grontee submits timely Quorterly Progress Reports os required by<br />

Porogroph 17, "Submission of Reports."<br />

f) Grontee submits oll deliverobles os specified in Ìhis Porogroph of lhis Gront Agreement ond Work Plon ín<br />

Exhibit A.<br />

g) For eoch projecl, prior to the commencement of construction or implementotion oclivities, Grontee<br />

sholl submit to the Stote the following:<br />

ì ) Finol plons ond specificotions certified by o Colifornio Registered Civíl Engineer os to complíonce for<br />

eoch opproved project os listed in Exhibit A of this Gront Agreement.<br />

2) Work thot is subject to the Colifornio Environmentol Quolity Act (CEQA) ond or environmentol<br />

permitting sholl not proceed under this Gront Agreement until the following octions ore performed:<br />

i. Grontee submits oll opplicoble environmentol permits os indicoted on lhe Environmentol<br />

lnformotion Form to the Stote.<br />

ii. Documents thot sotisfy the CEQA process ore received by the Stote,<br />

iii. Stote hos completed its CEQA complionce review os o Responsible <strong>Agency</strong>, ond<br />

iv. Grontee receives written concurrence from the Stote of Leod <strong>Agency</strong>'s CEQA document(s)<br />

ond Slote nolice of verificotion of environmentol permit submittol.<br />

Stote's concurrence of Leod <strong>Agency</strong>'s CEQA documents is fully discretionory ond sholl constitute o<br />

condition precedent to ony work (ex. construction or implementotion octivities) for which it is<br />

required. Therefore, the Grontee should get concurrence from DWR on CEQA before beginning ony<br />

of the work thol is subject to CEQA. Once CEQA documentotion hos been completed, Stote will<br />

consider the environmentol documents ond decide whether to contínue to fund the project or to<br />

require chonges, olterotions or other mitigotion. Grontee must olso demonstrote thot it hos complied<br />

with oll opplicoble requirements of the Notionol Environmentol Policy Act by submitling copies of<br />

ony environmentol documents, including environmentol impoct stotements, Finding of No<br />

Significont lmpoci, mitigotion monitoring progroms, ond environmentol permits os moy be required<br />

prior Ìo beginning construction/implementotion.<br />

3) For eoch project included in this Gront Agreemenl o moniioring plon os required by Porogroph 22,<br />

"Project Monitoring Plon Requirements."<br />

B. DISBURSEMENT OF GRANT FUNDS. Following the review of eoch invoice, Stote will disburse to Gronlee the<br />

omount opproved, subject to the ovoilobility of funds through normol Stote processes. Notwithstonding ony<br />

oÌher provision of this Gront Agreement, no disbursemenf sholl be required of ony time or in ony monner<br />

which is in violotion of, or in conflicl with, federol or stote lows, rules, or regulotions, or which moy require ony<br />

rebotes to the federol government, or ony loss of tox-free stotus on stote bonds, pursuont to ony federol<br />

stotute or regulotion. For eoch project, funds will be disbursed by Stote in response to eoch opproved<br />

invoice in occordonce with the Exhibit C. Any ond oll money disbursed to Grontee under this Gront<br />

Agreement ond ony ond ollinterest eorned by Grontee on such money sholl be used solely to poy Eligible<br />

Costs.<br />

L ELIGIBLE PROJECT COST. Gronlee sholl opply Stote funds received only to eligible Project Costs in<br />

occordonce with opplicoble provisions of the low ond Exhibit C. Eligible project costs include the reosonoble<br />

costs of studies, engineering, design, lond ond eosement ocquisition, legol fees, preporotion of<br />

environmentol documenTotion, environmenÌol mitigotions, moniloring. ond project construction. Work<br />

performed ofter the dote of gront oword, August 16, 2011 , sholl be eligible for reimbursement. Reosonoble<br />

odministrotive expenses moy be included os Project Costs ond will depend on the complexity of the project<br />

preporoÌion, plonning, coordinotion, construction, ocquisitions, implementotion, ond mointenonce.<br />

Reimbursoble odministrotive expenses ore the necessory costs incidentolly but directly reloted to the project<br />

in¡lr r.linn +ha n¡¡tie¡ of overheod ond odministrotive expenses thot ore directly reloted to the projects<br />

I r9rvvil<br />

included in this Agreement in occordonce with lhe stondord occounting proctices of The Grqnlee.<br />

Advonced funds will not be provided. Costs thot ore not reimbursoble with gront funds connot be counted<br />

os cost shore. Costs thot ore not eligible for reimbursement include but ore not limited to:<br />

o) Costs, other thon those noted obove, incurred prior to the oword dote of the GronÌ.


Grant Agreement No. 460000XXXX<br />

Page 3 of42<br />

r-.1 nnarntinn ^nd mo¡nfenonce costs, including post construction performonce ond monitoring costs.<br />

vt vÈ/v,v,,v,, v,<br />

c) Purchose of equipment not on integrol port of o project.<br />

d) Estoblishing o reserve fund.<br />

e) Purchose of woter supply.<br />

f) Monitoring ond ossessment costs for efforts required ofter project construction is complefe.<br />

g) Replocement of existing funding sources for ongoing progroms.<br />

h) Trovel ond per diem cosTs.<br />

i) Support of existing ogency requirements ond mondotes (e.9. punitive regulotory ogency requirements).<br />

j) Purchose of lond in excess of the minimum required ocreoge necessory to operote os on integrol port<br />

of o project, os set forth ond detoiled by engineering ond feosibility studies, or lond purchosed prior to<br />

the effective dote of the gront oword with the Stote.<br />

k) Poyment of principol or interest of existing indebfedness or ony interest poymenis unless the debt is<br />

incurred ofter execution of this Gront Agreement, the Stote ogrees in writing to the eligibility of the costs<br />

for reimbursement before the debt is incurred. ond lhe purposes for which the debt is incurred ore<br />

otherwise eligible costs. However, this will only be ollowed os Grontee cost shore (i.e. Funding Motch)<br />

l) Overheod not directly reloted to project costs.<br />

10. METHOD OF PAYMENT. After the disbursement requirements in Porogroph 7 "Bosic Conditions" ore met,<br />

Stote will disburse the whole or portions of the Gront Amount to Grontee, following receipt from Grontee of<br />

on invoice for costs incurred, ond timely Quorterly Progress Reports os required by Porogroph ì2,<br />

"Submission of Reoorts."<br />

lnvoices submitted by Grontee sholl include the following informotion:<br />

o) Costs incurred for work performed in implementing lhe IRWM Progrom or progrom controcts during the<br />

oeriod identified in the porticulor invoice.<br />

b) Costs incurred for ony interests in reol properÌy (lond or eosements) thot hove been necessorily<br />

ocquired for o project during the period idenTified in the porticulor invoice for lhe construction,<br />

operotion, or mointenonce of o project.<br />

c) Appropriote receipts ond reports for oll costs incurred.<br />

d) lnvoices sholl be submitted on forms provided by Stote ond sholl meet the following formot<br />

reouirements:<br />

l) lnvoices must confoin the dote of the invoice, the time period covered by the ínvoice, ond the totol<br />

omounT oue.<br />

2) lnvoices musl be itemized bosed on the cotegories specified in lhe Exhibit C. The omounl cloimed<br />

for solories/woges/consultont fees must include o colculotion formulo (i.e., hours or doys worked<br />

times the hourly or doily rote = the totol omount cloimed).<br />

3) Sufficieni evidence (i.e., receipls, copies of checks, time sheets) must be provided for oll costs<br />

included in the invoice.<br />

4) Eoch invoice sholl cleorly delineote those costs cloimed for reimbursement from the Stote's gront<br />

omount, os depicted in Porogroph 3, "Gront Amount" ond those costs lhot represenÌ Grontee's ond<br />

Locol Project Sponsors' costs, os opplicoble, in Porogroph 4, "Grontee Cost Shore."<br />

5) Originol signoture ond dote (in ink) of Grontee's Project Monoger.<br />

Poyment will be mode no more thon monthly, in orreors, upon receipÌ of on invoice beoring lhe Gront<br />

Agreement number. Submit the originol ond three (3) copies of the invoice form to the following oddress:<br />

Deoortment of Woter Resources<br />

Mr. Joson Preece<br />

Bonderson Bldg., Rm. 2044<br />

P.O. Box 942836<br />

Socromento, CA 9 4236-0001<br />

I l. WITHHOLDING OF GRANT DISBURSEMENT BY STATE. lf Stote determines thot o projecÌ is not being<br />

implemented in occordonce with the provisions of this Gront Agreement, or thot Grontee hos foiled in ony<br />

ofher respecÌ to comply with the provisions of this Gronl Agreement, ond if Grontee does not remedy ony<br />

such foilure to Slote's sotisfoction, Stote moy wiÌhhold from Gronfee oll or ony portion of the Gront Amounl


12.<br />

l?<br />

14.<br />

t6<br />

Grant As.reement No. 460000XXXX<br />

Page 4 of42<br />

ond toke ony other oction thot it deems necessory to protect its interests. Stote moy require the Grontee to<br />

immediotely repoy oll or ony portion of the disbursed gront omount with ínterest, consistent with ils<br />

determinotion. Stote moy consider Grontee's refusol to repoy the requested disbursed gronl omount o<br />

confroct breoch subject to the defoult provisions in Porogroph 13, "Defoult Provisions."<br />

lf Stote notifies Grontee of ils decision to withhold the entire gront omount from Gronlee pursuont to this<br />

Porogroph, this Gront Agreement sholl terminote upon receipt of such notîce by Grontee ond sholl no longer<br />

be binding on either porty.<br />

CONTINUING ELlGlBlL|TY. Grontee must meet the following ongoing requirements to remoin eligible to<br />

receive Stote gront funds:<br />

o) Timely odoption of on IRWM Plon thot meets fhe requirements contoined in Port 2.2 of Division ó of the<br />

CWC, commencing with Section 10530.<br />

b) An urbon woter supplier thot receives gront funds governed by this Gront Agreement sholl mointoin<br />

complionce with the Urbon Woter Monogement Plonning Act (CWC$ l0ó10 ef. seq.)<br />

c) For groundwoter monogement ond rechorge projects ond for projecÌs with poientiol groundwoter<br />

impocts, the Grontee must demonstrote complionce with the groundwoter complionce options set<br />

forth on poge l5 of the IRWM Progrom Guidelines, doted August 2010.<br />

d) Reporting of stotus of IRWM Plon Updote os described in Exhibit E under the heoding "Quorterly Progress<br />

Reoort."<br />

DEFAULT PROVISIONS. Grontee will be in defoult under this Gront AgreemenÌ if ony of the following occur:<br />

o) Breoch of this Gront Agreement. or ony supplement or omendmenl lo il, or ony oTher ogreement<br />

between Grontee ond Stote evidencing or securing Grontee's obligotions.<br />

b) Moking ony folse worronty, representotion, or stotemenl with respect to this Gront Agreement.<br />

c) Foilure to operote or mointoin projects in occordonce with this Gront Agreement.<br />

d) Foilure lo moke ony remiÌtonce required by this Gront Agreement.<br />

e) Foilure of Grontee or o Locol Project Sponsor receiving gront funding through this Gront Agreement to<br />

odopt, no loter thon 2 yeors ofter the Stote executes the Gront Agreement, on IRWM Plon thot meets<br />

the requirements contoined ín Port 2.2 of Division ó of the CWC, commencing with Section 10530.<br />

f) Foilure to undertoke oll reosonoble ond feosible efforts to toke into occount the woter-reloted needs of<br />

disodvontoged communities in the oreo within the boundories of the IRWM Plon.<br />

g) Foilure to comply with Lobor Complionce Progrom (LCP) requirements.<br />

h) Foilure to meet ony of the requirements set forth in Porogroph 12, "Continuing Eligibility."<br />

Should on event of defoult occur, Stote moy do ony or oll of ihe following:<br />

i) Declore the Gront be immediotely repoid, wilh interest. which sholl be equol to Stote of Colifornio<br />

generol obligotion bond interest rote in effect of the time of the defoult.<br />

i)<br />

k)<br />

r)<br />

Terminote ony obligotion to moke future poyments to Grontee.<br />

Terminote the Gront Agreement.<br />

Toke ony olher oction thot it deems necessory to protect its interests.<br />

PERMITS, LICENSES, APPROVALS, AND LEGAL OBLIGATIONS: Grontee ond Locol Project Sponsors sholl be<br />

responsible for ensuring ony ond oll permits, licenses, ond opprovols required for performing their obligotions<br />

under this Gront Agreemeni ore obtoined, ond sholl comply with CEQA (PRC Section 21000 ef seq.) ond<br />

other opplicoble federol, Stote ond locol lows, rules, ond regulotions, guidelines, ond requirements for eoch<br />

project described in Exhibit A.<br />

RELATIONSHIP OF PARTIES. Grontee ond Locol Project Sponsors ore solely responsible for design,<br />

construction, ond operotion ond mointenonce of Projects wilhin the Mokelumne/Amodor/Coloveros IRWM<br />

Progrom. Review or opprovol of plons, specificotions, bíd documents, or other construction documents by<br />

Stote is solely for the purpose of proper odministrotion of gront funds by Stote ond sholl nol be deemed to<br />

relieve or restrict responsibilities of Grontee ond Locol Project Sponsors under this Gront Agreement.<br />

GRANTEE REPRESENTATIONS. Grontee occepts ond ogrees to comply with oll terms, provisions, conditions,<br />

ond written commitments of this Gront Agreement, including oll incorporoted documents, ond to fulfill oll


Grant Agreement No. 460000XXXX<br />

Page 5 of42<br />

ossuronces, declorotions, representolions, ond stoTemenis mode by Grontee in lhe opplicot¡on,<br />

documents, omendments, ond communicotions filed in support of its request for Sofe Drinking Woter, Woter<br />

Quolity ond Supply, Flood Control, River ond Coostol Protection Bond Act of 2006 finoncing. Grontee<br />

worronts thot oll Locol Project Sponsors will be contrqctuolly required to comply with this Gront Agreement<br />

for their respective project or projecls.<br />

17. SUBMISSION OF REPORTS. The submittol ond opprovol of oll reports is o requirement for the successful<br />

completion of this Gront Agreement. Reports sholl meet generolly occepÌed professionolstondords for<br />

technicol reporting ond sholl be proofreod for content. numericol occurocy, spelling, ond grommor prior to<br />

submittol to Stote. All reports sholl be submitted to the Sfofe's Project Monoger, ond sholl be submÌtted in<br />

both electronic ond hord copy forms. lf requested, Grontee sholl promplly provide ony odditionol<br />

informolion deemed necessory by Stote for the opprovol of reports. Reports sholl be presented in the<br />

formots described in the opplicoble portion of Exhibit E. The timely submittol of reports is o requirement for<br />

initiol ond continued disbursement of Stote funds. Submittol ond subsequent opprovol by the Stote, of o<br />

Project Completion Report for eoch projecf listed on Exhibit A is o requirement for the releose of ony funds<br />

retoined for such project.<br />

. Quorterly Proqress Reporfs: Groniee sholl submit Quorterly Progress Reports on o regulor ond consistent<br />

bosis to meet the Stote's requirement for disbursement of funds. Quorterly Progress Reports sholl be sent<br />

vio e-moil, to the Stote's Project Monoger os specified in Exhibit B. Quorterly Progress Reports sholl<br />

provide o brief description of the work performed, Grontees octivilies, milestones ochieved, ony<br />

occomplishments ond ony problems encountered in the performonce of the work under this Gront<br />

Agreement during the reporting period. The first Quorterly Progress Report should be submitted to DWR<br />

no loter thon August 1 ,2012 for the quorter ending June 30. 2012 with future reports then due on<br />

successive three month increments bosed on the invocing schedule ond this dote.<br />

. Project Completion Reports: Grontee sholl prepore ond submit to Stote o seporoÌe Project Completion<br />

Report for eoch project included in Exhibit A. Grontee sholl submit o Project CompleÌion ReporÌ within<br />

ninety (90) colendor doys of project completion. Eoch Project Completion Report sholl include o<br />

description of octuol work done, ony chonges or qmendments to eoch project. ond o finol schedule<br />

showing octuol progress versus plonned progress. ond copies of ony finol documents or reports<br />

generoted or utilized during o project. The Project Completion Report sholl olso include. if opplicoble,<br />

cerlificotion of finol project by o registered civil engineer, consistenl Stondord Condition D-l5,"Finol<br />

lnspections ond Certificotion of Regislered Civil Engineer." A DWR "Certificotion of Project CompleÌion"<br />

form will be provided by the Stote.<br />

. Gronl Comoletion Report: Upon completion of oll projects included in Exhibit A, Grontee sholl submit to<br />

Stote o Gront Completion Report. The Gront CompleÏion Report sholl be submitted within ninety (90)<br />

colendor doys of submitting the Project Completion Report for the finol project to be completed under<br />

the Gront Agreement. The Gront CompleÌion Report sholl include reimbursement stotus, o brief<br />

description of eoch project completed, ond how those projects will furlher the gools of the IRWM Plon<br />

ond identify ony chonges to the IRWM Plon, os o result of project implementotion. Retention for the lost<br />

project to be compleied os port of this Gront Agreement will not be disbursed until fhe Gront<br />

Completion Report is submitted to ond opproved by the Stote.<br />

. Project Performonce Reports: Gronfee sholl submit o Projecl Performonce Report for eoch project.<br />

Project Performonce Reports sholl be submitted to Stote wiÏhin ninety (90) colendor doys ofler the first<br />

operofionol yeor of o project hos elopsed. This record keeping ond reporting process sholl be repeoted,<br />

for eoch project, onnuolly for o totol of ì0 yeors ofter the compleled projecl begins operotion.<br />

lB. IRWM PROGRAM PERFORMANCE AND ASSURANCES. Grontee ogrees to foithfully ond expeditiously perform<br />

or couse to be performed oll IRWM Progrom work os described in lhe finol plons ond specificotions for eoch<br />

project under this Gront Agreemenl ond implement lhe project in occordonce with opplicoble provisions<br />

of the low. ln the eveni Stote finds it necessory to enforce lhis provision of this Gront AgreemenÌ in the<br />

monner provided by low, Grontee ogrees to poy oll costs incurred by Stote including, but nol limited fo,<br />

reosonoble ottorneys'fees, legol expenses, ond costs.


Grant Agreement No. 460000XXXX<br />

Page 6 of42<br />

19. LABOR COMPLIANCE. Grontee ogrees to comply with oll opplicoble Colifornio Lobor Code requiremenfs,<br />

including prevoiling woge provisions. Grontee must, independently or through o third porty, odopt ond<br />

enforce o Deportment of lndustriol Relotions-certified LCP meeting the requirements of Lobor Code section<br />

1771 .5 for projecÌs funded by:<br />

o) Proposition 84 (Sofe Drinking Woter, Woter QuoliÌy ond Supply, Flood Control, River ond Coostol<br />

Protection Bond Act of 2006; PRC sections75075 elseq.) or<br />

b) Any other funding source requiring on LCP.<br />

At lhe Stote's request, Grontee must promptly submit written evidence of Grontee's complionce with the<br />

LCP reouirements.<br />

20. OPERATION AND MAINTENANCE OF PROJECT. For the useful life of conslruction ond implementotion<br />

projecls ond in considerotion of the Gront mode by Stote, Grontee ogrees to ensure or couse to be<br />

performed the commencement ond continued operotion of Ìhe projecÌs, ond sholl ensure or couse the<br />

projects lo be operoted in on efficient ond economicol monner;sholl ensure oll repoirs, renewols, ond<br />

replocements necessory to the efficient operotion of the some ore provided; ond sholl ensure or couse the<br />

some to be mointoined in os good ond efficient condition os upon its construction, ordinory ond<br />

reosonoble weor ond depreciotion excepted. The Grontee sholl ensure thot oll operotions ond<br />

mointenonce cosls of the focilities ond structures ore conlroctuolly ossumed by the oppropriofe Locol<br />

Projecl Sponsors for their respective projecls; Stote sholl not be lioble for ony cost of such mointenonce,<br />

monogemenf, or operotion, Grontee or Locol Project Sponsors moy be excused from operotions ond<br />

mointenonce only upon lhe written opprovol of the Stote's Project Monoger. For purposes of this Gront<br />

Agreement, "useful life" meons period during which on osset, property, or octivity is expected to be usoble<br />

for the purpose it wos ocquired or implemented; "operotion costs" include direct costs incurred for moteriol<br />

ond lobor needed for operotions, utilities, insuronce, ond similor expenses, ond "mointenonce costs"<br />

include ordinory repoirs ond replocements of o recurring nolure necessory for copiÌol ossets ond bosic<br />

structures ond the expenditure of funds necessory to reploce or reconstruct copitol ossets or bosic<br />

structures. Refusol of Grontee to ensure operofion ond mointenonce of the projects in qccordonce with this<br />

provision moy, of the option of Stote, be considered o breoch of this Gront Agreement ond moy be<br />

treoled os defoult under Porogroph 13, "Defoulf Provisions."<br />

21. STATEWIDE MONITORING REQUIREMENTS. Grontee sholl ensure thot oll groundwoter projects ond projects<br />

thot include groundwoter monitoring requirements ore consistent with the Groundwoter Quolity MoniÌoring<br />

Act of 2001 (Port 2.76 (commencing with Section ì0780) of Division ó of CWC) ond, where opplicoble, thot<br />

projects thot offect woter quoliÌy sholl include o monitoring component thot ollows Ìhe inlegrotion of dolo<br />

into stotewide monitoring efforts, including where opplicoble, the Surfoce Woter Ambient Monitoring<br />

Þraara,î r rvvrvr narrial out by the stole woter Resources control Boord.<br />

22. PROJECT MONITORING PLAN REQUIREMENTS. The Gront Agreement work plon should contoin octivities lo<br />

develop ond submit to STote o monitoring plon for eoch project contoined in this Gront Agreement.<br />

Moniioring plon con be for the entire Proposol or on o per project bosis. Along with the Attochment ó<br />

Projecl Performonce Meosures Tobles requirements outlined on poge 2l of the Proposition 84 Round I<br />

lmplementotion Proposol Solicitotion Pockoge, the Project Monitoring Plon should olso include:<br />

o) Boselinecondilions.<br />

b) Brief discussion of monitoring systems to be utilized.<br />

c) Methodology of monitoring.<br />

d) Frequency of monitoring.<br />

e) Locotion of monitoring points.<br />

A monitoring plon sholl be submitted to the Stote prior lo disbursement of gront funds for construciion or<br />

monitoring octivities for eoch project in this Gront Agreement. See Exhibít G ("Requirements for Doto<br />

SubmiÌtol") for web links ond informotion regording other Stote monitoring ond doto reporting requirements.<br />

23. NOTIFICATION OF STATE. For eoch project, Grontee sholl promptly notify Stote , in writing, of the following<br />

items:<br />

o) Events or proposed chonges thol could offecl the scope, budgel, or work performed under lhîs Gront<br />

Agreement. Grontee ogrees thot no substontiol chonge in the scope of o project will be undertoken


Grant Agreement No. 460000XXXX<br />

Page 7 of42<br />

untilwritten notice of the proposed chonge hos been provided to Stote ond Stote hos given written<br />

opprovol for such chonge. Substontiol chonges generolly include chonges to the wording/scope of<br />

work, schedule or term, ond budgel. See Exhibit H for guidonce on Agreement Amendment<br />

requirements.<br />

b) Any public or medio event publicizing the occomplishments ond/or results of this Gront Agreement ond<br />

provide the opportunity for ottendonce ond porticipotion by StoTe's representotives. Grontee sholl<br />

moke such notificotion of leost fourteen (14) colendor doys prior to the event.<br />

c) Completion of work on o project sholl include finol inspection of o project by o Registered Civil<br />

Engineer, os determined ond required by Slote, ond in occordonce wiTh Stondord Condition D-ì5 (Finol<br />

lnspections ond Certificotion of Registered Civil Engineer). Furthermore, the Grontee sholl provide the<br />

Stole The opportunity lo porticipote in the inspection. Grontee sholl moke such notificotion of leost<br />

fourteen (14) colendor doys prior to the finol inspection.<br />

24. NOTICES. Any notice, demond. request, consent, or opprovol lhot either porty desires or is required to gíve<br />

to the other porty under this Gront Agreement sholl be in wriling. Notices moy be tronsmitted by ony of the<br />

following meons: (i) by delivery in person; (ii) by certified U.S. moil, refurn receipt requested, postoge<br />

prepoid; (iii) by "overnight" delivery service; provided thot next-business-doy delivery is requested by the<br />

sender; or (iv) by electronic meons. Nolices delivered in person will be deemed effective immediotely on<br />

receipÏ (or refusol of delivery or receipt). Notices sent by cerlified moilwill be deemed effective given Ìen<br />

(10) colendor doys ofter the dote deposited with the U. S. Postol Service. Notices sent by overnight delivery<br />

service will be deemed effective one business doy ofter the dote deposited with the delivery service.<br />

Notices sent electronicolly will be effective on the dote of lronsmission, which is documented in writing.<br />

Notices sholl be sent to the below oddresses. Either porty moy, by written notice to the other, designote o<br />

different oddress thot sholl be substituted for the one below.<br />

25. PERFORMANCE EVALUATION. Upon completion of this Gront AgreemenT, Grontee's performonce will be<br />

evoluoted by the Slote ond o copy of the evoluotion will be ploced in the Stote file ond o copy sent to the<br />

Grontee.<br />

2ó. PROJECT REPRESENTATIVES. The GronTee hos ocknowledged outhorizolion to enler into o cosl shoring<br />

portnership ogreement os documented in Exhibit l. The Project Representotives during the term of this<br />

Gront Agreement is os follows.<br />

Deportmenl of Woter Resources Upper Mokelumne River Wotershed Authority<br />

Poulo Londis Rob Alcott<br />

Chief, Division of IRWM Executive Direcior<br />

P.O. Box 942836 5883 Eost Comonche Porkwoy<br />

Socromento CA 9423ó-0001 Volley Springs, CA 95252<br />

Phone: (91 ó) ó5l-9220 Phone: (2091 772-8340<br />

e-moil: plondis@woter.co.gov e-moil: robolcott@ool.com<br />

Direct oll inquiries to the Project Monoger:<br />

Deportment of Woter Resources Upper Mokelumne River Wotershed Authority<br />

Joson Preece Rob Alcott<br />

Engineering Geologist, DIRWM Executive Officer, UMRWA<br />

P.O. Box 942836 P.O. Box 383<br />

Socromento, CA 94236-0001 Seo Ronck,CA 95497<br />

Phone: (91ó) ó51-9ó3ó Phone: (7O7) 785-1008<br />

e-moil: jpreece@woter.co.gov e-moil: robolcott@ool.com<br />

Either porty moy chonge its Project RepresenÌotíve or Project Monoger upon written notice to the other porty.<br />

27. STANDARD PROVISIONS. The following Exhibits ore ottoched ond mode o port of this Gront Agreement by<br />

this reference:


ExhibilA-WorkPlon<br />

Exhibit B - Schedule<br />

Exhibit C - Budget<br />

Exhibit D - Stondord Condílions<br />

Exhibit E - Report Formots ond Requiremenls<br />

Exhibit F - Locol Project Sponsors<br />

Exhibit G - Reouirements for DoÌo Submittol<br />

Exhibit H - Guidelines for Grontees<br />

Exhibil l- Grontee Resolution<br />

lN WITNESS WHEREOF, the porties herefo hove executed this Gront Agreement.<br />

Grant Agreement No. 460000XXXX<br />

Page I of42<br />

STATE OF CALIFORNIA UPPER MOKELUMNE RIVER WATERSHED AUTHORITY<br />

DEPARTMENT OF WATER RESOUCES<br />

Poulo J. Londis, P.E., Chief<br />

Rob Alcott. Executive Officer<br />

Division of lniegroted Regionol Woter<br />

Upper Mokelumne River Wotershed Authority<br />

Monogement<br />

Dote<br />

Dote<br />

Approved os to Legol Form ond Sufficiency<br />

Soencer Kenner, Assistonl Chief Counsel<br />

Office of Chief Counsel<br />

Dote


ExHrslT A<br />

WORK PLAN<br />

Loke Cqmonche Tonk Rehobililolion & loterql Replocemenl Project<br />

Projecf Sponsor:<br />

Amodor Woter <strong>Agency</strong><br />

Grant Agreement No. 460000XXXX<br />

Page 9 of42<br />

Project Descripfion:<br />

The Amodor Woter <strong>Agency</strong> (AWA) will improve the Loke Comonche Villoge woter distribution syslem by<br />

fobricoting ond líning five redwood ionks with geo-membrone liners ond by replocing 200 existing Poly-Tube<br />

service loterols with 3/4-inch-diometer copper pipe.<br />

Budget Cofegory (ct): Direct Projecf Administralion Cosis<br />

Tosk l: Administrotion<br />

Coordinotion<br />

The Upper Mokelumne River Wotershed Aulhority (UMRWA), the Regionol Woter Monogement Group for the<br />

MAC Region, will be responsible for monoging ond distributing qworded gront funds to Project Sponsor AWA.<br />

Gront funding oworded to the Loke Comonche Tonk Rehobilitotion & Loterol Replocement Project will be<br />

directed to AWA by UMRWA under on ogreement between lhe lwo ogencies.<br />

Work items to be included under this tosk include the UMRWA - AWA gront ogreement, generol project<br />

odministrotion tosks (project stort-up coordinotion meeting, cloim preporotion, communicotions with UMRWA,<br />

ond Boord communicotions), progress meetings throughout the durotion of the project, preporotion ond<br />

implemenlotion of o Project Performonce Monitoring Plon, documents monogemenl ond schedule review.<br />

Project Performonce Monitoring Plon<br />

A Monitoring Plon will be prepored for the project. The Monitoring Plon will identify the meosures thot will be<br />

used to monitor progress toword ochieving the specific project gools of reducing/minimizing woter losses within<br />

AWA's woter system, improving woter quolity ond improving woter supply reliobility. The Monitoring Plon will<br />

olso provide lools to monitor ond meosure project processes ond will guide finol projecÌ performonce reporting<br />

thot will fulfill gront ogreemenf requirements.<br />

Tosk I Deliverobles:<br />

o UMRWA - AWA gronl ogreement<br />

. Project stort-up coordinotion meeting<br />

. Monthly invoices<br />

. Reimbursementrequests<br />

. Performonce Monitoring Plon<br />

. Project stotus updotes to Boord of Directors<br />

Tosk 2: Lobor Complionce Progrom<br />

AWA does not hove o Lobor Complionce Progrom (LCP). Prior to the commencement of ony prevoiling woge<br />

lobor, o consullont will be retoined to prepore on LCP. AWA will file onnuol reports with the Director of the<br />

Deportment of lnduslriol Relotions using the prescribed onnuol reporting forms.<br />

Tosk 2 Deliverobles:<br />

o Lobor Complionce Progrom<br />

. Annuol Reoort<br />

Tosk 3: Reporting


Grant Agreement No. 460000XXXX<br />

Page I0 of42<br />

Quorterly Reports will be prepored ossessing the progress ond occomplishments of the Loke Comonche Tonk<br />

Rehobilitotion & Loterol Replocement Project. The Quorterly Reports to DWR will include lhe following<br />

informotion:<br />

. The Ìime period covered by lhe report<br />

. Description of octivities since the previous report<br />

. Stotus of the project relotive to lhe progress schedule<br />

¡ An estimole of the percentoge of work completed<br />

. Exoenditureinformotion<br />

o Percentoges of Stote ond totol funding expended to dote issues thot need to be resolved<br />

A Project Complelion Report will olso be prepored of the end of the project. The Project Completion Reporl will<br />

include lhe following:<br />

o An executive summory<br />

o Records of exoenditures<br />

o A comÞorison of the projected benefits versus the meosured benefits<br />

o A comporison of the originol schedule ond the octuol schedule<br />

o A discussion of problems thot occurred during construclion ond how the problems were solved<br />

. Submittol of ony required deliverobles thot were nol previously submitted<br />

. A list of required deliverobles submitted previously with dotes of submittol ond DWR occeptonce<br />

AWA will keep oll records ond documents pertoining to the project for three yeors ofter project completion.<br />

Tosk 3 Deliverobles:<br />

. Quorterly Reports<br />

. Project Complelion Report<br />

Budget Colegory (b): Lond Purchose/Eosemenf<br />

Not opplicoble. No property or eosement ocquisitions ore required for implementotion of the project.<br />

Budgel Cotegory (c): Plonning/Design/Engineering/Environmenfol Documenfofion<br />

Tosk 4: Assessment ond Evoluotion<br />

Compleled; the projecT is port of the on-going mointenonce ond repoir of the AWA woter system ond<br />

ossessment ond evoluotion work hos previously been completed by AWA sÌoff.<br />

Tosk 5: Finol Design<br />

AWA projecï monoger, ossistont engineer ond distribulion operotor will colloborote on the design of the<br />

project. The l0% design willshow loterols to be reploced ond the siting ond loyout of the tonks to be lined. The<br />

10O% or finol design will be the design pockoge thot is used to odvertise the project for bid for construction. The<br />

pockoge consists of the complete, signed plons ond specificotions.<br />

During project development the following meThodologies ond stondords will be used:<br />

. Americon Woter Works Assocíotion (AWWA) moleriols stondords<br />

o Americon Society for Testing ond Moteriols (ASTM) stondords<br />

r Amodor Woter <strong>Agency</strong> hydroulic modeling stondords (H2ONet)<br />

. Olhers os idenlified os opplicoble<br />

AddiÌionolly, during design, AWWA ond ASTM Construction Stondords, AWA Stondord Specificotions, ond<br />

Occupotionol Sofety & Heolth Administrotion (OSHA) regulotions ond industry stondord proctice will be used os<br />

construction stondords ond heolth ond sofety slondords.


Tosk 5 Deliverobles:<br />

. 1O7" Design<br />

o Finol llOO%) Design Pockoge<br />

o Bid Pockoge including Finol Plons ond Specificotions<br />

Tosk ó: Environmentol Documenlotion<br />

Grant Agreement No. 460000XXXX<br />

Page II of42<br />

Becouse the projecT involves infrostructure replocement ond rehobilitolion there ore no significont onticîpoted<br />

project impocls. For CEQA complionce on lnitiolStudy (lS) will be prepored following completion of the l0%<br />

design. Following completion of the lS o Negotive Declorotion or Mitigoted Negotive Declorotion. os<br />

oppropriote, will be declored. The Negotive Declorotion (or Mitigoted Negotive Declorotion) will be circuloted<br />

for o 30-doy public review period ond will include the following:<br />

. A description of the Loke Comonche Tonk Rehobilitotion & Loterol Replocement Project<br />

. The locotíon of the project ond o site mop<br />

. A summory of the need for the Project<br />

. A proposed finding thot the Project will not hove o significont impoct on the environment<br />

. An ottoched copy of the lnitiol Study documenting reosons for the finding of no significonl impocts<br />

o Mitigotion meosures, if opplicoble<br />

After lhe public review period, the Negolive Declorotion (or MiÌigoted Negoiive Declorotion) will be finolized.<br />

Nolices for both the tonk lining portion ond the loterol replocement portion of the Project will be published.<br />

Note:This Work Plon provides for on lS ond Negotive Declorotion (or Mitigoted Negotive Declorolion) process<br />

to fulfill CEQA complionce. lf AWA Legol Counsel determines the project is Cotegoricolly Exempt under CEQA<br />

then the obove described tosk ond ossocioted tosk budget will be odjusted occordingly.<br />

Tosk ó Deliverobles:<br />

. lnitiol Study<br />

. Approved ond odopted Negotive Declorotion or Mitigoted Negotive Declorotion<br />

o Publish NoTice for Tonk Rehobilitotion<br />

. Publish Notice for Loterol Reolocement<br />

Tosk 7: Permilting<br />

AWA will ocquire on Amodor Counly Encroochment Permit. Additionolly, AWA will coordinote direclly with the<br />

Colifornio Deportment of Public Heolth (CDPH) for permit complionce os this is o drinking woter project.<br />

Tosk / Deliverobles:<br />

. Amodor County Encroochment Permit<br />

o Colifornio Deportment of Heolth Permits (os required)<br />

Budget Cotegory (di ; Construcfion I lmplemenfotion<br />

The tonk rehobililotion portion of the project will be let to o privole conlroctor. AWA will perform the loterol<br />

replocement portion of the work with ogency stoff.<br />

Tosk B: Construction Controcling - Tonk Rehobilitotion Portion Only<br />

AWA will odvertise for bids, conduct pre-bid controctors meeting, open ond review submitted bids, oword the<br />

Construction Controct. ond issue Notice of Aword/Notice to Proceed (NOA/NTP) for the tonk rehobililotion<br />

portion of the project. The tonk rehobililolion porlion of the Finol Design pockoge completed during Tosk 5 will<br />

be used for the bid odvertisement.<br />

Tosk B Deliverobles:<br />

o Notice to Bidders


. Pre-bid controctors meet¡ng ogendo ond minutes<br />

. Written bid evoluotion<br />

o Nolice of Aword<br />

. Notice to Proceed<br />

. Construction Controct Aword<br />

Tosk 9: Construction - All Portions<br />

Subtosk 9.1: Mobilizotion ond SiÌe Preporoiion<br />

Grant Agreement No. 460000XXXX<br />

Page l2 of42<br />

Tonk Rehobilitotion:The Controctor will mobílize equipmenÌ, moteriols ond crew per the sloging plon.<br />

Construction equipment moy include o crone or bock hoe, low bed, scissor lifl or mon-lift, ond crew truck.<br />

Loterol Replocement: AWA will mobilize equipment, moteriols ond crew to the AWA Comonche Shop.<br />

Construction equipmenl moy include o looder, bockhoe, lO-Wheel Dump Truck, concrete sow-culter,<br />

compoctor ond generotor.<br />

Subtosk 9.2: Projecl Construction<br />

Tonk Rehobilitotion:The Controctor, working with AWA Operotions stoff, will droin the five storoge tonks ond<br />

inspecl, repoir ond prepore eoch for instollotion of the liners. Geo-membrone liners will be instolled in Tonks ó, B,<br />

9, l0 ond 12.<br />

Loterol Replocement: AWA will excovote, reploce, bockfill ond repove on estimoted 200 loterols neor their<br />

existing olignments utilizing ì" Type K soft copper. An Amodor County encroochment permif sholl be obtoíned<br />

ond sholl contoin o troffic control plon with oll required signoge, borricodes. cones, floggers ond other<br />

necessory troffic control devices.<br />

Subtosk 9.3: Performonce Testing ond Demobilizotion<br />

Tonk Rehobilitotion: Finol liner inspections will be performed olong with oll required performonce testing. The<br />

woter quolity from tonks with new liners will be tested fo ensure complionce with CDPH stondords.<br />

Demobilizotion ond sÍte restorotion tosks will be completed.<br />

Loterol Replocement: Finol loterol inspeclions will be conducted olong with oll required performonce tesling<br />

(e.g. pressure testing of lolerols). Demobilizotion ond site restorotion will olso be completed under this subtosk.<br />

Tosk 9 Deliverobles:<br />

. Fíve rehobilitoted woter sloroge tonks<br />

. Estimoted two hundred service loterolreplocements<br />

. lnterim ond finolinspection reports<br />

. Pressure ond leok tesÌing report<br />

o Woter quolity testing doto<br />

Budget Cofegory (e) : Environment Complionce / Mifigofion / Enhoncement<br />

Tosk I 0: Environmentol Complionce/Mitigotion/Enhoncement<br />

Not opplicoble. No environmentol mitigotions or enhoncements ore onticipoted for this project.<br />

Budgef Cofegory (f ): Construction Administrotion<br />

Tosk I l: Construction Administrolion<br />

AWA stoff will monoge projecl construction odministrotion tosks for both portions of the project. Construction<br />

Administrotion work items include:


. Review controctor's schedule ond moke recommendotions<br />

. Monoge ond coordinote oll project inquiries<br />

. Serye os primory point of contoct for project correspondence<br />

. Monoge ond coordinote oll controctor correspondence ond controcts<br />

. Mointoín detoiled project records<br />

. Receive, log, ond distribute oll submittols for review<br />

. lnsoect construction<br />

o Recommend finol poyment ond submit oll project files for orchiving<br />

Tosk I I Deliverobles:<br />

. lnspectors' Doily Reports<br />

Budget Cotegory (g): Ofher Cosls<br />

Grant Agreement No. 460000XWX<br />

Page 13 of42<br />

A Lobor Complionce Progrom, os described in Tosk 2 obove, will be prepored by o consultont retoined by<br />

AWA. Also, ossocioted oÌtorney fees ore included in this budget cotegory for project-reloted consultotion.<br />

Budget Calegory (h) : Conslrucfion /lmplementotion Contingency<br />

Not opplicoble. There is no contingency opplied to this project.<br />

Amqdor Wqler System Leqk Deleclion & Repoir Progrom<br />

Project Sponsor:<br />

Amodor Woter <strong>Agency</strong><br />

Project Descriplion:<br />

AWA will instoll eighteen "moster meters" on key pipelines wilhin the Amodor Woter System (AWS). This project is<br />

the first phose of the AWS Leok Detection & Repoir Progrom ond will provide AWA bosic woter loss informotion<br />

for considerotion in developing prioritized copitol project ond mointenonce work plons os port of o future<br />

second phose funded with AWA reserves, ovoiloble gronts ond through woter rote recovery.<br />

Budgel Cotegory (o): Direcf Projecf Administrofion Costs<br />

Tosk l: Administrotion<br />

Coordinotion<br />

UMRWA is lhe Regionol Woter Monogement Group responsible for monoging ond distribufing oworded gront<br />

funds to Projecl Sponsor AWA. Any gront money oworded to the AWS Leok Detection & Repoir Progrom will be<br />

directed to AWA by UMRWA for use in project funding under on ogreement between the two ogencies.<br />

Work items to be included under this losk include the UMRWA - AWA gronl ogreement, generol projecl<br />

odministrotion tosks (project stort-up coordinotion meeting, cloim preporotion, communicotions with UMRWA,<br />

ond Boord communicotions), progress meelings throughout the durotion of the project, preporotion ond<br />

implementotion of o Project Performonce Monitoring Plon, documents monogement, ond schedule review.<br />

Project Performonce Monitoring Plon<br />

A Monitoring Plon will be prepored for the project. The Monitoring Plon will identify the meosures lhot will be<br />

used to monitor progress toword ochieving the specific project gools of reducing/minimizing woter losses within<br />

AWA's woter system ond improving woler supply reliobility. The Monitoring Plon will olso provide tools to<br />

monitor ond meosure project processes ond will guide finol project performonce reporting thol willfulfill gronl<br />

o greement requirements.<br />

Tosk I Deliverobles:


¡ UMRWA - AWA gront ogreemenl<br />

o Project stort-up coordinotion meet¡ng<br />

o Monthly invoices<br />

. Reimbursementrequests<br />

. Performonce Moniloring Plon<br />

. Project stotus updoÌes to Boord of Directors<br />

Tosk 2: Lobor Complionce Progrom<br />

Grant Agreement No. 460000XXW<br />

Page 14 of42<br />

Not opplicoble. AWA stoff will complete ollwork described in this Work Plon ond therefore o LCP is not<br />

necessory (Lobor Code S lZZl).<br />

Tosk 3: Reporting<br />

Quorterly ReporÌs will be prepored ossessing the progress ond occomplishments of the AWS Leok Detection &<br />

Repoir Progrom. The Quorterly Reports to DWR willinclude the following informotion:<br />

o The time period covered by the report<br />

o Descriplion of octivities since the previous report<br />

. Stotus of the project relotive to the progress schedule<br />

. An estimote of the percentoge of work compleied<br />

. Exoenditureinformotion<br />

. Percentoges of Stote ond totol funding expended to dote<br />

r Key issues thot need to be resolved<br />

A Project Completion Report will olso be prepored of the end of Ìhe project. The Project Completion Report will<br />

include the following:<br />

. An executive summory<br />

. Records of exoenditures<br />

. A comporison of the projected benefits versus the meosured benefits<br />

. A comporison of the originolschedule ond the octuol schedule<br />

. A discussion of problems thot occurred during construction ond how the problems were solved<br />

. Submittol of ony required deliverobles thot were not previously submitted<br />

. A list of required deliverobles submitted previously with dotes of submittol ond DWR occeptonce<br />

AWA will keep oll records ond documents pertoining to lhe project for three yeors ofler project completion.<br />

Tosk 3 Deliverobles:<br />

. Quorterly Progress Reports<br />

. Project CompleÌion Report<br />

Budget Cotegory (b): Lond Purchose/Eosemenl<br />

Not opplicoble. The project involves the instollotion of moster meters on exisÌing moins locoted on properties to<br />

which AWA hos legoloccess.<br />

Budgef Cotegory (c): Plonning/DesignlEngineering/Environmenlal Documenlotion<br />

Plonning documents ore not necessory to implement the first phose of the AWS Leok Delection & Repoir<br />

Progrom due to the investigotory noture of the project. At lhis time, the Phose I project is considered to be ot<br />

the conceptuollevel.<br />

Tosk 4: Assessment ond Evoluotion


Grant Agreement No. 460000XXXX<br />

Page I5 of42<br />

Not opplicoble. The project is investigotory in nolure ond will provide the necessory doto for AWA Engineering<br />

Deportmenl to ossess ond prescribe future improvements.<br />

Tosk 5: Finol Design<br />

AWA project monoger, ossistonÌ engineer ond distribution operotor will colloborote on the design of the<br />

project. The l0% design willshow project siting ond loyout of the moster meters, ond contoin bockground<br />

geologic reseorch ond ony constroints there moy be lhot opply to the project. The 100% or finol design will<br />

consist of the complete, signed plons ond specificotions.<br />

During project development the following methodologies ond stondords will be used:<br />

. Americon Woter Works Associotion (AWWA) moteriols stondords<br />

. Americon Society for Testing ond Moteriols (ASTM) stondords<br />

. Amodor Woter <strong>Agency</strong> hydroulic modeling stondords (H2ONet)<br />

. Olhers os identified os opplicoble<br />

Additionolly, during design, AWWA ond ASTM Construction Stondords, AWA Stondord SpecificoÌions, ond<br />

Occupotionol SofeÌy & Heolth Administrotion (OSHA) regulotions ond industry stondord proctice will be used os<br />

construction stondords ond heolfh ond sofety stondords.<br />

Tosk 5 Deliverobles:<br />

. lO% Design<br />

. Finol (100%) Design Pockoge<br />

Tosk ó: Environmentol Documentotion<br />

Becouse the project involves instollotion of meters on existing woter system infrostructure there ore no<br />

significont onticipoted projecT impocts. For CEQA complionce on lnitiol Study (lS) will be prepored following<br />

completion of the l0% design. Following completion of the lS o Negotive Declorotion or Mitigoted Negolive<br />

Declorotion, os oppropriote, will be declored. The Negotive Declorotion (or Mitigoted NegoÌive Declorotion)<br />

will be circuloted for o 30-doy public review period ond will include the following:<br />

. A descripfion of the AWS Leok Detection & Repoir Progrom ond Phose I Project<br />

. The locolion of the project ond o site mop<br />

. The need for the project<br />

. A proposed findíng thot the Project will nol hove o significonl effect on lhe environment<br />

. An ottoched copy of the lnitiolStudy documenting reosons for the finding of no significont impocts<br />

. Mitigotion meosures, if opplicoble<br />

After the public review period, the Negotive Declorotion (or MitigoÌed Negotive Declorotion) will be finolized<br />

ond notice published.<br />

Note: This Work Plon provides for on lS ond Negotive Declorotion (or Mitigoted Negotive Declorotion) process<br />

to fulfill CEQA complionce. lf AWA Legol Counsel determines the project is Cotegoricolly Exempt under CEQA<br />

then the obove described tosk ond ossocioted tosk budget will be odjusted occordingly.<br />

Tosk ó Deliverobles:<br />

. lnitiolStudy<br />

. Approved ond odopted Negotive Declorotion or Mitigoted Negotive Declorotion<br />

. Publish Notice<br />

Tosk 7: Permitting


Grant Agreement No. 460000XXXX<br />

Page 16 of42<br />

AWA will ocquire encroochment permits, os needed, to occess the AWS moins. AWA will coord¡note with<br />

Amodor County ond the cíties in which the moins ore locoled (Amodor City, lone, ond Sutter Creek) to obloin<br />

these oermits.<br />

Tosk Z Deliverobles:<br />

. City Encroochment Permits<br />

. County Encroochment Permits<br />

Budgef Category (d) : Consfrucfion /lmplementotion<br />

Tosk B: Construction Controcting<br />

Not opplicoble. All construclion work tosks will be compleled by AWA stoff ond not controcted out.<br />

Tosk 9: Construction<br />

Construction of the project is divided into three subtosks os described below.<br />

Subtosk 9.1: Mobilizotion ond Site Preporotion<br />

AWA will mobilize equipmenl, moteriols ond crew of vorious AWA sites throughout the system, Ìhough the<br />

predominont loy-down yord will be of the Tonner Woter Treotment Plont. Construction equípment moy include<br />

o looder, bockhoe, ìO-Wheel Dump Truck, concrete sow-cutter, compocTor ond generotor.<br />

Subtosk 9.2: Projecl Construction<br />

AWA will ocquire ond instoll lB moster woter meters, oppurtenonces ond ossocioted underground voults.<br />

Amodor County, Amodor City, City of lone ond City of Sutter Creek encroochment permits sholl be obtoined<br />

ond sholl contoin o troffic control plon with oll required signoge, borricodes, cones, floggers ond other<br />

necessory troffic control devices.<br />

Subtosk 9.3: Performonce Tesling ond Demobilizotion<br />

AWA will oerform meter colibrotion ond doio verificotion under this subtosk. Demobilizotion ond site restorotion<br />

os required will be completed.<br />

Tosk 9 Deliverobles:<br />

. Acquisilion ond instollotion of lB moster meters ond oppurtences<br />

. Finol inspection report<br />

. Meter colibrotion report<br />

Buclge t Cafegory (e) : Environment Complionce / Mittgolion I Enhoncemenl<br />

Tosk I 0: Environmentol Complionce/Mitigotion/Enhoncement<br />

Not opplicoble. No environmenÌol miiigotions or enhoncements ore onticipoted for Ìhis project.<br />

Budgef Category (f ): Construction Admintstralion<br />

Tosk I l: Construction Administrotion<br />

AWA stoff will perform construction odministrotion tosks including the following work items:<br />

. Review construction sequencing ond schedule ond moke recommendotions<br />

. Monoge ond coordinote projecÌ inquiries ond serve os point of contoct<br />

o Monoge ond coordinote oll moteriols ocquisitions<br />

o Mointoin detoiled project records<br />

o lnsoect construction


Tosk I I Deliverobles:<br />

- lnspectors' Doily Reports<br />

Budget Cotegory (g): Other Cosfs<br />

Grant Agreement No. 460000XXXX<br />

Page 17 of42<br />

Costs ossocioted with required project-reloted consultotion with the AWA ottorney ond reloted fees ore<br />

included in this budget cotegory.<br />

Budget Cotegory (h): Construction I lmplemenÍotion Confingency<br />

Not opplicoble. There is no contingency opplied to this project.<br />

West Point Woter Moin & Tonk Replocement Proiect<br />

Projecl Sponsor;<br />

Coloveros County Woter District<br />

Project Descriplion:<br />

The Coloveros County Woter District (CCWD) will improve the domestic woter system serving the community of<br />

West Point by replocing deterioroting woter moins, oppurtenonces (such os hydronts, oir volves, ond service<br />

lines) ond o leoking redwood woter storoge tonk. The woter moin replocement will include 4,200 leeI of 12inch-diometer<br />

tronsmission moin olong Winlon Rood between the woter treotmenf plont ond downtown West<br />

Point ond on odditionol 2,000 feet of woter moins within lhe downtown oreo olong Moin Street ond Pine Street.<br />

Trenching within public roods will require removol ond replocemenl of on estimoted 450 tons of ospholfic<br />

concrele poving. A new ó0,000-9ollon, ignition-resistont, gloss-fused, bolted, steel woter storoge tonk will<br />

reploce lhe leoking redwood tonk ond 1,200 feet of golvonized steel woter line supplying the tonk will be<br />

reploced with o ductile iron woter line. Figure I shows the locotion of the infrostructure replocemenf.<br />

Budgel Cotegory (o): Direct Proiecf Administrotion Cosfs<br />

Tosk l: Administrotion<br />

Coordinotion<br />

UMRWA will be responsible for monoging ond distributing oworded gronl funds to Project Sponsor CCWD. Any<br />

gront money oworded to the West Point Woter Moin & Tonk Replocement Project will be directed to CCWD by<br />

UMRWA under on ogreemenl between the two ogencies.<br />

Work items to be included under this tosk include the UMRWA - CCWD gront ogreement, generol project<br />

odministrotion tosks (project stort-up coordinofion meeting, cloim preporotion, communicotions with UMRWA,<br />

ond Boord communicotions), progress meelings throughout the durotion of the project, preporotion ond<br />

implementotion of o Project Performonce Monitoring Plon, documenfs monogement ond schedule review.<br />

Additionolly, os porl of this tosk CCWD stoff willcoordinote internolly ond with other necessory ogencies,<br />

consultonts ond controciors in order to implement the project. Coordinotion will be required to execute The<br />

gront ogreement with DWR, obtoin the gront funds, ond complete invoices ond reimbursemenf requesls.<br />

Project Performonce Monitoring Plon<br />

A Monitoring Plon will be prepored for lhe West Point Woter Moin & Tonk Replocement Project to provide o<br />

fromework for ossessing ond evoluoting the project performonce once il is implemented. The Monitoring Plon<br />

will idenlify the meosures thot will be used to monitor progress toword ochieving the specific projeci gools of<br />

reducing/minimizing woter losses within CCWD's woter system, improving wofer quoliÌy ond improving woter<br />

supply reliobility. The Monitoring Plon will olso provide tools to monitor ond meosure project processes ond will<br />

guide finol project performonce reporting thot willfulfill gront ogreement requiremenfs.


Figure l: West Point Woter System lnfrostruclure<br />

Grant Agreement No. 460000XXXX<br />

Page I8 of42<br />

ilililililt<br />

ilililililt


Tosk I Deliverobles:<br />

- UMRWA - CCWD gronf ogreement<br />

- Project stort-up coordinotion meeling<br />

- Monthly invoices<br />

- Reimbursementrequesls<br />

- Project Monitoring Plon<br />

- Project stotus reports to the Boord of Directors<br />

Tosk 2: Lobor Complionce Progrom<br />

Grant Agreement No. 460000XXXX<br />

Page 19 of42<br />

CCWD will retoin on opproved Third Porty Lobor Complionce (LCP) consultoni (B CCR 916426) to provide lhe<br />

LCP ond reporting.<br />

Tosk 2 Deliverobles:<br />

- Lobor Complionce Progrom<br />

- Annuol Reoort<br />

Tosk 3: Reporting<br />

Quorterly Progress Reports will be prepored ossessing the progress ond occomplishments of the West Point<br />

Woter Moin & Tonk Replocement Projecl. The Quorterly Reports will likely include the following informotion:<br />

. The time period covered by the report<br />

. Description of octivities since the previous report<br />

o Stotus of the project relotive to lhe progress schedule<br />

. An estimote of the percentoge of work completed<br />

. Records of exoenditures<br />

. Percenloges of Stote ond totol funding expended to dote<br />

. Key issues thot need to be resolved<br />

A Project Completion Report will olso be prepored of The end of the project. The report will include the<br />

following:<br />

. An executive summory (two poge moximum)<br />

. Records of expenditures<br />

¡ A con'ìgorison of the projected benefits versus the meosured benefits<br />

. A comporison of lhe originol schedule ond the octuolschedule<br />

. A discussion of problems thot occurred during construction ond how the problems were solved<br />

. Submittol of ony required deliverobles thot were not previously submitied<br />

. A lisi of required deliverobles submitted previously with dotes of submiltol ond DWR occeptonce<br />

CCWD will keep oll records ond documents pertoining Ìo the project for three yeors ofter project completion.<br />

Tosk 3 Deliverobles:<br />

- Quorterly Reports<br />

- Project Completion Report<br />

Budget Calegory (b): Lond PurchoselEosemenl<br />

CCWD will prepore legol descriptions for required pipeline eosements ond negotiote with property owners to<br />

ocouire the eosements. The eosements will then be recorded with the County. Lond for the Bummerville tonk<br />

site wos purchosed by CCWD in 1995 ond is olreody under Ìheir ownership.<br />

Budgef Cotegory (c): Plonning/DesignlEngineeringlEnvironmentol Documentolion<br />

Tosk 4: Assessment ond Evoluotion


Grant Agreement No. 460000XXW<br />

Page 20 of42<br />

Not opplicoble. Previously completed ossessment ond evoluotion studies will be utilized to complete project<br />

design.<br />

Tosk 5: Finol Design<br />

CCWD will complete 100% design ond prepore the construction bid pockoge thol will be used to solicit<br />

conslruction bids. The bid pockoge will consisl of o complete set of signed plons ond specificotions. (CCWD<br />

previously compleled ó0% design for this Projecl). Finol (100%) design will be completed using the following<br />

stondords:<br />

. Coloveros County Woter District. Design ond Construction Stondords<br />

. Americon Woter Works Associotion (AWWA) Stondords<br />

. Colifornio Woterworks Stondords<br />

. Seismic (EorÌhquoke) Design Stondords<br />

. Fire Flow (Locol Fire Deportment or ISO)<br />

AWWA ond ASTM Slondord Moteriols will be used during project development. Additionolly, AWWA & ASTM<br />

Construction Stondords, AWA Slondord Specificolions, OSHA regulotions ond industry stondord proctice will be<br />

used os construction stondords ond heolth ond sofety stondords.<br />

Tosk 5 Deliverobles:<br />

- Finol (100%) Design Plons ond Specificotions<br />

- Construction bid pocket<br />

Tosk ó: Environmenlol Documentotion<br />

An lnitiolstudy ond Mitigoted Negotive Declorotion (IS/MND) wos completed for this project. CCWD opproved<br />

the project per CEQA stotue ond filed o Notice of Delerminoiion (NOD) with lhe Office of Plonning ond<br />

Reseorch. Additionolly, o Mitigotion, Monitoring, ond Reporting Progrom (MMRP) wos odopted for this project.<br />

Tosk 7: Permitting<br />

CCWD will obfoin encroochment permits from Coloveros County Public Works ond the Colifornio Deportment<br />

of Tronsportotion (Coltrons) prior to construcfion. The Controctor will be required to prepore ond submit troffic<br />

control plons for County ond Stote opprovol.<br />

Tosk 7 Deliverobles:<br />

- County ond Coltrons Encroochment Permits<br />

Budget Cof egory ¡'dJ: Consf ruction/lmplementotton<br />

Tosk B: Conslruction Conirocting<br />

CCWD will publicly odvertise for bids ond conduct o pre-bid controctor's meeting. Following receipt of bids<br />

CCWD will hold o public bid opening ond identify the opporenl low bidder. CCWD will evoluote the bids,<br />

recommend the lowest responsive ond responsible bid, ond present the recommended bid ond reloted<br />

controct documents lo lhe CCWD Boord of Directors for opprovol.<br />

Tosk B Deliverobles:<br />

- Notice to Bidders<br />

- Pre-bid controctors meeting<br />

- Summory of Solicitotion/Bid Resulls<br />

- Aword of construction controct<br />

Tosk 9: Construction


Grant Agreement No. 460000XXXX<br />

Page 2I of42<br />

Subtosk 9.1: Mobilizotion ond Site Preporotion<br />

The Controctor will mobilÌze The equipment ond moteriols to West Point ond stoge of the CCWD's wostewoter<br />

plont on Associqted Office Rood or of the woTer plont on Smitty Lone. The Confroctor will prepore o lroffic<br />

control plon (conforming to Colifornio Deportmenl of Tronsportotion ond Public Works requiremenÌs) ond<br />

provide signs, borricodes, cones, floggers ond other necessory troffic control devices.<br />

Subtosk 9.2: Projecl Construction<br />

Project construction will be performed by the Controctor ond will occur in three stoges os described below.<br />

Downtown Tronsmission Line Replocement: The tronsmission line replocement will include 4,200-feet of l2-inch<br />

woter moin olong Winton Rood, 2,000 feet of woter moins within the downtown oreo olong Moin Street ond<br />

Pine Street, ond oppurtenonces such os hydronts, oir volves ond wofer services. Construction will be by the<br />

open-cut trench method. The trench will be locoted on the rood shoulder where spoce permits. Where the<br />

trench musl be locoted within the poved section. the ospholt will be sow-cut, removed ond reploced.<br />

Bummerville Tonk Replocement: A new ó0,000-gollon steel woter sloroge tonk will reploce fhe existing leoking<br />

30,000-gollon redwood tonk. The site will be cleored ond grubbed to remove deod trees ond brush ond moke<br />

room for the tonk. A reinforced concrete ring woll ond grovel pod will be provided for o foundotion. The tonk<br />

will be o gloss-fused, bolted. steel type conforming Io AWWA D100. A tonk supplier will pre-monufoclure the<br />

tonk in sections of steel plote (floor, wolls ond roof) ond then ship lhe tonk to the job site. The tonk will be field<br />

erected by bolting togeÌher oll steel plole sections ond odding The pipe connections, vents, hotches ond other<br />

oppurtenonces. The tonk is finished by pointing the interior ond exlerior of the tonk with on epoxy point<br />

meeting the NSF-ól stondord for sofe contoct with potoble woter.<br />

Bummerville Pipeline Replocement: A new B-inch ductile iron line (l ,700 feet) will reploce the existing<br />

golvonized steel line thot hos been in ploce since l9ó0. The pipeline crosses through eosements on<br />

unimproved lond on privote property. Construction will be by open-cut trench using o bockhoe. Any existing<br />

improvements thot ore domoged or removed for construction such os fences, moilboxes, privote roods, etc.<br />

will be reooired or reoloced.<br />

Subtosk 9.3: Performonce Testing ond Demobilizotion<br />

CCWD will inspect instollotíon of the new woter moins ond observe pressure testing of ollwoter moins lo<br />

confirm leokoge roles ore within AWWA stondords. Prior to plocing the tonk into service, drinking woter initiolly<br />

filling the tonk will be tested for bocterio, volotile orgonic corbons (VOCs) ond oÌher loborotory porometers os<br />

required by the Colifornio Deportment of Public Heolth.<br />

CCWD will perform oll generol construction inspections. A third porty soils/geolechnicol firm will be retoined io<br />

perform compoction tests on plocement of lrench bockfill. Bockfill ploced within the rood rightof-woy will<br />

meet compoction requirements of Coltrons ond Coloveros County Public Works deportment, whichever<br />

opplies. Stormwoter pollution prevention best monogemenl procÌices (BMPs) will be implemented (e.9., cover<br />

disturbed soil on the project, control soil erosion, minimize stormwoter quolity issues, etc.).<br />

Tosk 9 Deliverobles:<br />

- lnterim ond finolinspection reports<br />

- Pressure testing reporl<br />

- Woter quolity testing doto<br />

- Comooction test doto<br />

Budgef Category (e) : Environmenf Com pliance / Mitigotion I Enhancemenf<br />

Tosk I 0: Environmentol Complionce/Mitigotion/Enhoncement<br />

CCWD willimplemenl the Mitigotion, Moniloring. ond Reporting Progrom (MMRP) required by the Boord<br />

qdopted project lS/MND. The Controctor will be notified of the required project mitigotion meosures in the<br />

MMRP, including lhe following:


Grant Agreement No. 460000XXXX<br />

Page 22 of42<br />

. Proper equipmenl mointenonce<br />

o Dust control meosures<br />

. Removol of loose soil from trucks before leoving the site (if necessory)<br />

. Covering houltrucks<br />

o Notificotion of oppropriote personnelshould culturol resources be uncovered during construction<br />

. Use of temporory erosion control meosures<br />

. Storm droin inlet protection from sedimentotion<br />

. Use of troffic control<br />

Tosk l0 Deliverobles:<br />

- Mitigotion, Monitoring, ond Reporting Progrom (MMRP)<br />

- MitigotionlmplementotionReport<br />

Budget Category (f ): Consfruction Administrotion<br />

Tosk I l: Construction Administrotion<br />

During construction, o project engineer, construction monoger, construction inspector ond speciol inspector<br />

will be ossigned to the project to complete construction odministrotion losks os necessory. Construction<br />

odministrotion octivilies to be conducted under this tosk include construction monogement services such os<br />

reviewing the controctor's schedule, monoging ond coordinoting project inquiries ond correspondence,<br />

mointoining project records, ond inspecting the odequocy of projecÌ work during construction. Speciol<br />

inspection ond testing for the project will be performed which includes compoction tests on oll trench bockfill<br />

ond collection ond lob tests of concrete cylinders. This testing will be performed by o third porty firm.<br />

Tosk ll Deliverobles:<br />

- Communicotion/correspondencerecords<br />

- Field logs<br />

- Project records<br />

Budgel Cotegory (g): Other Costs<br />

Project costs reloted to the Lobor Complionce Progrom (LCP) described in Tosk 2, County Public Works<br />

lnspection Fees, ond LegolCounsel project-reloted consultotion ore included in the project budget.<br />

Budget Cotegory fh/: Consf ruction/ lmplementofion Conlingency<br />

A 1O% construction/implementotion contingency is included in the project budget.


JJ<br />

6<br />

25<br />

4<br />

2S<br />

29<br />

æ<br />

3t<br />

g<br />

s<br />

37<br />

3A<br />

39<br />

{o<br />

41<br />

42<br />

43<br />

l5<br />

l6<br />

47<br />

4A<br />

49<br />

s<br />

53<br />

I<br />

55<br />

$<br />

57<br />

59<br />

æ<br />

61<br />

62<br />

6l<br />

o<br />

c<br />

I<br />

I<br />

I<br />

I<br />

J<br />

I<br />

_r!<br />

J<br />

5<br />

I<br />

I<br />

3<br />

I<br />

I<br />

I<br />

I<br />

4<br />

I<br />

L*. Cmæh.Tdk RnhdlIú¡on t ldùd R.Plæ.m.d Projôc¡<br />

&¡nt Aw¡rd Dalê<br />

Fuding A9re.ñÈil Aôdl¡oñ<br />

Budger Cdqq (¡) Drcd Proird Adminr{rãûm Cad3<br />

T¡sk 1: admrñßlråtb<br />

Pqd UbqflÉh TmtR-ùÛd'4<br />

¡ Lú.r.liækmrI È4.C<br />

Múthly tnvdong<br />

ProtÈd Pcdom¿næ M6lonn9 H¿n<br />

Plàn Êåp¡E!6 &AFrovd<br />

Pbn lnpÞm6Bs<br />

l¡sk2 LrÞq Cmpl,.n€ Prqr¡m<br />

l¡rk3 RÊpding<br />

tu¡ñdy Redt.<br />

Ouüerly R4ús 1<br />

Oudedy R@d! 2<br />

Ou!ôârt R€pds 3<br />

Ouð^rdy R.965 {<br />

ou¡dêry Rqdr 5<br />

ou¡r.dy R4ds ô<br />

Prq!d Cffiplelþn RAd<br />

gud!èt Cât€ady (b) Uôd Pu.châdE¡somânt-NOT APPLICAELE<br />

tud!d C.lqq (c) Pb^n¡nCD.i9dh9nc.nn0/EnYr6m6làl hÈmcnlatm<br />

Ta*4 Ass€smdt ¿ñd Ev¡u¡lø'NoT APPLISeLE<br />

1¡*5 FnelD69ñ<br />

Eêgñ Dêsgn<br />

CmpBe reÁ Dlagn<br />

Cdpl.lc Frn¡lDÉ9n<br />

T¡*6 En!trment¡l Dñnù6rs<br />

Prêp¡rc oran N.!¡M O.cldûs<br />

PrÊpâre FnalN.g¿¡Dv. æbråùq ¿nd Âôcvô CEOA CmPhðcÊ<br />

l¡*7 P.m'[ñg<br />

Obl¿rn Cosnl, Ensdôn.nl Pèrmd<br />

Oþl¡rn C¡flmra OPH PØl<br />

tudgá cd4q (d) cmlruc¡dhplddt¡rh<br />

frskB Coshd¡o Cøtadng<br />

A&rù.êfù k<br />

Ad Qdr4<br />

Bid Ndræ ofAw¡rd fNdiE.lo Præecd<br />

f¡*9 Consltudm<br />

Subl¿* E t MobÞ¿lt and Súe Èèpar¿Lm<br />

Subl.* I 2 ProidContrlcllon<br />

Subb* I3: PtuðnæT.s¡ng ¡nd Dêhoblrâlon<br />

BudgdCatqq iê) Ênsrffi.d.l tumFIðncddil¡9atdE^hÐcem6tsNOTAPPLICABLE<br />

T¡sk 10 Eowom.nt l<br />

tudgd Câl4dy l0 CddtEllon Ah¡nrlr¿td<br />

T¡ek 11: Conshúq Adm¡nrtuùm<br />

T¡rk<br />

Spll<br />

PqroÉ3<br />

M¡låcd6<br />

ô76 6F? Wd tl/il<br />

O d¡y3 ftd ry14I<br />

0 dàys $n l/1/12<br />

a$ ôy:? Sn a/l/r2<br />

ffi óqs? Sn a/l/12<br />

175 òF 9ô al1l12<br />

U d.ys? ùn {1/12<br />

{O d¡F? $n 4nl12<br />

274 ú!5 Mm Wl2<br />

{$ d¡y3 $n a/1/12<br />

S ørr tu 7ã12<br />

15 ôys nu 7812<br />

0day! Thu 7ã12<br />

Odâyr lhu t&{12<br />

0d.yi lhu lß13<br />

0d¡ys Thu C4l13<br />

od¡ys fhu 7{13<br />

Od¡ys Tùu lryl1l<br />

0 d.ys fuo læll13<br />

od.t! $¡ 4/1/12<br />

1116ys 9n {/1/r2<br />

0days ?î81112<br />

111&y3 gn {1/12<br />

o d¡yr $n ar1l12<br />

4ôdays Sun t/1/12<br />

05day:<br />

111 6ys<br />

Ms &4/r2<br />

gn al1l12<br />

4sd¡yr tuî 411112<br />

æd¡ye Mû84¡12<br />

6drys M6g4t12<br />

65dayr Md d4l12<br />

ð5d¡yi<br />

g7 ô13<br />

Ltû84112<br />

Mø Wt2<br />

l3oüyr h Wr2<br />

Sd.yr Mo Wl2<br />

0days Fd t1n&12<br />

od¡ys Fñ C1/t3<br />

47 &yr l¡6 812<br />

16 d¡y5 Mm ß12<br />

1æ ôrs MÐ W13<br />

€d¡y5 hd 11rgl3<br />

0dãy5 *n l/1/12<br />

0d.ys Srn a/1/12<br />

Y7 øy. Mø Bl2<br />

s7 ôys Mm W12<br />

ExHrslI B<br />

ScHEDUTE<br />

Fh'$ ft€dæã5s5<br />

IE 141t13<br />

&d t1¡11<br />

$n q/1/12<br />

Tu! 1æl¡13<br />

ûu 91Ul3<br />

Fn 11æ12 3<br />

fhu rylù133<br />

Thu æ{12<br />

Thu 9/lEll 5tSS<br />

Tuo lZ31lt3 3<br />

luc læ1l13<br />

ft! rKl3<br />

Thu 7É123FS+70 ûyr<br />

fñu 10{1231FS+65d¡y3<br />

Thu 1,:!1332FS|6d.y3<br />

Thu l/t/13 33FS'65dry.<br />

lhu 7Éll33lF5+65 d.y3<br />

Du 1Wl3 5FSi65d¡tl<br />

Tue 1æl/13 SFSì63 d.ys<br />

$n 4/t/123<br />

Fn &3r/12<br />

Ftd1t123<br />

Fn ß1112<br />

Sun {1/123<br />

Fì d1t1242<br />

Fn &31/124f<br />

Fn ffilI12<br />

Fn gll123<br />

Fd 931t12#<br />

F^ æ1112<br />

Fn &31/r213<br />

Fn &111243<br />

Tuô t231ll3<br />

Fn 3f/13<br />

Ft 1Ol1Zr24<br />

fn rr/1&1253FS+ãdals<br />

Fí !1/13 54FS+75days<br />

fuo 1%1h3<br />

Fn W13Y<br />

Tut tll11357<br />

Tuâ tZ31l13 S<br />

tn 4/1/12 3<br />

$¡ 4¿llr2<br />

Tuô t23f13<br />

Tuê lBl/13 57SS,59FF<br />

sumnq 0- áþm¡ll¡*Ú<br />

O ftoiæt Summ-y Exlêñ¡l Mßcmû )<br />

h9ê 1<br />

4,æ1 QFI 201 qrzæt Atr3,æl QFl,Zollalrl-ãt Ou2.?ol Q1.3,æl Qtsf æ! Qtrl.æl aÞ2,æ1 qr3,æl Qr4 æ1 wl'<br />

o .¡n âMârApr sJunJul q .Od o c J.n.tMilÀÞ/ ¡JunJvl u êOd o . J¡neMa.Apr..&n¡l ù tOcl o t J¡n.<br />

oql<br />

-j<br />

Oddlim


ID<br />

2<br />

4'.<br />

5<br />

25<br />

6<br />

27<br />

Å<br />

æ<br />

s<br />

37<br />

40<br />

4t<br />

42<br />

43<br />

6<br />

¡ô<br />

47<br />

48<br />

€ s<br />

51<br />

g<br />

ft<br />

s<br />

æ<br />

6t<br />

^ fTatk Name<br />

t'i<br />

-<br />

A'll¿k ro- syètm L.ú ùr.d6À RòF r PrcF<br />

¡l<br />

E<br />

c'<br />

{}<br />

E<br />

E<br />

Grad Awrd Date<br />

Fundhg Asrcemed Aêot¡ú<br />

tudqelCategry (a): srd ProJed Afr¡nistaron cds<br />

T¡* 1r Adm¡nidÉh<br />

MmlHy lnvdchs<br />

Projeú Pdmmc.Mmdng Han<br />

Phn PrGp¡ñUo & ApprcEl<br />

Phn lmPldmtdron<br />

T¡* 2: Laborcompl¡ace PrqEm<br />

Tâsk 3: Rèpding<br />

Ouadedy R+ds<br />

Prq.d Cmpldron R4or-<br />

tudgetClegtry (b): bnd PurôadEasmed - NoTAPPLICABLE<br />

tud9d Cl. gq (c): Pl¡nnhg/O.ign/EæinærinCtuurúmÐt¡l Oofl malatbn<br />

Ta* 4:Ascssmsl ad EEbetb - NOT APPUCABLE<br />

Task 5: Final æEsn<br />

8q¡n ùdsn<br />

Complde 10ó Dcs¡S<br />

Compldâ Fin¡l DÊign<br />

T.¡k 6: Eñsronmmt¡ hmñblion<br />

Prqare ûatNqali€ HaRh<br />

F¡nalzô Nq.w. DcdaGtim 8d Adi.E CEOÀ Cmpliúcê<br />

Ta* 7: Pemi$m<br />

ObHn Couily Endoadmsl Pemß<br />

Obtdn City Encr€cMdl Pmits<br />

&dgetCdegq (d): CqlrudrodlmpbmÐtal¡o<br />

Task g Contuclion cmtradng<br />

I<br />

Adêdisâ ftr Brd<br />

i<br />

Bid openDg<br />

ì<br />

BidNdi€olAward/Noti6toPr6æd<br />

Ta* 9:Contudion<br />

SSta* 91: Mô¡lizat¡on od Ste ProParaÙon<br />

i<br />

Súla*S2 Projôclcondrud¡on<br />

i Sùta* I3: Pelmanæ Tê*ing and hob¡hãt¡on<br />

Budg.t Ca.gq (.): Enürcnm.nbl<br />

.NOT APPLICABLE<br />

:J Ta* l0 Envtm€ntd . NOT APPLI$ELE<br />

Bud9.t cal€gory (D coô{rudion Aûdldion<br />

Ta* 11: Con6trudionAdmidfrùm<br />

ÈqæÌ h6 &tr Sldm txk<br />

Dtuh A RFir Rq.m<br />

Task<br />

Split<br />

Prcgr6s<br />

,,, Mlôsona<br />

457 daF $n 4/1/12<br />

4S d¿F gî 4h112<br />

175ôys M{l/12<br />

4S daF M @12<br />

40 dâþ ¡lû4212<br />

275 d.Þ Mû 1W12<br />

457 d¿F MUZ12<br />

s7 daF Fi7lg12<br />

324 &yt Fà 71U12<br />

0 d¡F Tu. 1æ1113<br />

0 daF $n 4/1112<br />

2€ daF Sun 4/1/12<br />

0 d¿F $n 4/1/12<br />

175 d.F 9n 4/1/12<br />

0 deys Sun {il12<br />

S dðrs W4ø12<br />

1æd¡F Modldl2<br />

175d.F W4212<br />

S daF Mw12<br />

1ædåF Mút1&12<br />

6 daJÉ Mfi 1ã12<br />

6 daÞ Nlm 1ã12<br />

65 d.F Mo 1812<br />

282daÞ Mq1B12<br />

æ d¡F Mo 12¡3112<br />

I dry Mû 1n12<br />

I dãy Tu! 121U12<br />

lddy Wodz27l13<br />

219 d.F ltu ær3<br />

æ daF Ttu æ13<br />

1æ daF Tþ aã13<br />

æ caF Tto 1ltll3<br />

0 d¡F Sn 4/1/12<br />

0 daF &n 4/1/12<br />

21S daF ltu ru13<br />

21s dày ftu W13<br />

Grant Agreement No. 460000XXXX<br />

Page 24 of42<br />

I DErm<br />

675 ùyß hd tl/l1<br />

FìnFh Prdeæ5ærs<br />

Tu.1Z31l13<br />

tr-æ1l.Otr1,æ1 qt.2,201 Ots3.201 O.(r1.2Q:llOr1,?Q1 Qr2,201 Qt¡3.201 qlr4,201 ob-l.201 atr2,20llOb3.201,Otr4.2!1 -0f1,<br />

9 !tJ4!eUq^pd..aJct¡|1.,q,,9q9!l olp-!anq.[etAp[¡.1-'10.,1,11 u e"o-lo.]êJ¡D€MsrAPr ¡-&n:Jrl .-u.l e-e!.o.1 e..'r+.e<br />

odaF M&1/1Í<br />

ôet<br />

0 d.F $n {1/12 gn 41112<br />

Tte 1n1113<br />

Fñ 122ù13 3<br />

s¿121t173<br />

Fd 122U13 3<br />

Fd fl112<br />

Fn 122ù13 51SS<br />

Tuc 12311133<br />

Trè12311133<br />

Thu tqal3<br />

Tuâ 1231/13 SFSS3 day6<br />

Sn 4/1/12 3<br />

Frt 11/13<br />

Sn4/1/123<br />

Fd 11Æt12<br />

$n 4/1/12 3<br />

Fd tlt1242<br />

Fd 11ßU1243<br />

Fd 11Æû12<br />

Fd @1t123<br />

Fñ 11/3ù1246<br />

Fn 31/13<br />

Fng1t13q<br />

Fá U1t13 *<br />

lue 1231h3<br />

W¿d n7h3<br />

Mû1281244<br />

Túe 121El2 53Fs+10 dayt<br />

Wcd ZZZ13 5+FS+50 dãyÉ<br />

fve 1231h3<br />

kdg/13s<br />

WÊd 11/d13 s7<br />

Tuê 1æ1l1358<br />

Sun 41/12 3<br />

&n 4/l/12<br />

Tue t231l13<br />

Tuê 1231l1357sS<br />

Smm4-halT¡*s-Dedlhe<br />

O hl.dSnn¡ry<br />

-,<br />

Page f<br />

tundM¡bdmô ç<br />

$


ID<br />

1<br />

2<br />

3<br />

5<br />

6<br />

m<br />

21<br />

22<br />

24<br />

32<br />

33<br />

34<br />

35<br />

37<br />

3ô<br />

40<br />

41<br />

42<br />

43<br />

6<br />

47<br />

4ô<br />

49<br />

50<br />

51<br />

53<br />

54<br />

s<br />

58<br />

o<br />

:!<br />

!f<br />

c<br />

'C<br />

!5<br />

r!<br />

tl<br />

il<br />

É<br />

EI<br />

fask Natu<br />

Prcj.* W.!t Po¡nt ütó¡ c.ù<br />

E l¡nk Replacm.d Proþ€l<br />

Wd Polnt Wals MJn & Tan¡( RÐlæ¡mml Prolsl<br />

ganl Award Dslo<br />

Fundng Agreement Becuüm<br />

Budgd câlegry (6): Dired PrciedAhinr{râtio c6ts<br />

fask I Æm¡niqútio<br />

Møhly lnvdc¡n9<br />

ProFd Pcddmam. Im¡todng P¡an<br />

Plsn Prepår.to &ApproEl<br />

Plsn lrylemenlBt¡ó<br />

TBsk 2 låbqcmpl¡8ncc Progr€m<br />

fask 3: Rcpoding<br />

ouañdy Regts<br />

Prc¡ect Complet¡ø Repod<br />

Budgd CatègW (c) BsnnngDedgn/Engineqrn0/bü16mnlal DocumentåÙs<br />

Task 4 Assessenl ând Evaluaüo - cmplded<br />

Task 5 FnElOdgn<br />

cmplctc Finål D€s¡ln<br />

Task 6r EhvironmntalDcümênlalio - Completed<br />

Tesk 7i Pcrm¡lting<br />

Obtan Caûens Encr@chment Pêrmit<br />

Obten Cdnly Publ¡c Ws bs@chmmt tumit<br />

obtãrn NPDES SdruâlÉr tumitApplEallq (úr€quk€d,<br />

BudOel Cat€ry (d): Colruclid/lmplcmentaton<br />

Tâsk 8: CosÙuclm Cstradhq<br />

Prepâre Hd %ckage<br />

Ævetse Jq Bd<br />

Eid OFnhg<br />

B¡d Notiæ ofAward<br />

B¡d Ndice to Preecd<br />

Task 9 CosFuctis<br />

Subtask I 1: MóilÞåüó Bnd Ste ReParat¡o<br />

Sblåsk92 Prc¡dColrudion<br />

$bh* I 3; Perfomåncc Tesljng ånd &mob¡l¿ÊUon<br />

Budget Categdy (e): Enùrmmenbl cwl¡ance/M¡ligåÛo/Enhtncilenl - Nol,<br />

la* 10: Envirmmcntal<br />

lmplemcnwal¡dale/Repd 6 CæA MtgÊtiø Measures<br />

lmdement,¡r'âficbtdRepd o stmwaler BMPS<br />

Budgd cÊleory (0: cd{rudm ffi¡nisraüo<br />

Tesk 1 l: Cóstrudlm ffiniskatio<br />

828 days úon l1/l/10 I¡û1zi1ns<br />

0 days Wd 6/1/11 Wèd 6/1í 1<br />

0 òÞ Sun 4Ílî2 Sn 4ñ112<br />

458 doys Sun 4/1/i2 luê 1%lñ3<br />

2æ dåF sun 4/1ñ2 Thu 3,/2913 3<br />

66dåys sun4h/12 9¡n7/l/123<br />

260days Sn4/lñ2 tuU&l!3<br />

æ dåys Sun 4/1ñ2 hu426112<br />

260dåys Sun,l/1/'12 lhuævl342SS<br />

457 dãÞ Sun 4/1ñ2 Mo l%U133<br />

3eÉ dåys lhu 7Æi2 Tuc l2/Jlñ33<br />

325 days fhu 75/12 Th¡ 10ru13<br />

0dsys Tlc 12ð1n3 Tue l2ßlll331FS+63days<br />

436 dåF Mo 11/1ñ0 Fñæq12<br />

0days Suní1n2 Sun4/1n23<br />

327 days Mfr 11/'lñ0 1ue1l3u12<br />

327 days Mq 11/1n0 1!è1t3142<br />

0&ys W€d6ñ/¡|'l Wod6/1n1<br />

109 áys Wdú112 Fdffign2<br />

1 09 eys wed z1n2 Fri æ9/1 2 36<br />

1æ days WdZ1l12 Fd6291236<br />

109 days Wedz1l12 FnÐgn236<br />

435 d8ys Wedz1ll2 169ßOn3<br />

S dåF Wedzlh2 Mq0l4h2<br />

20 daÞ Wedz1l12 fü.n8h236<br />

25@ys \Nedngn2 Mq4ø1244<br />

0 days M64nn2 W4ø1245<br />

0 døys M64r23n2 hÆ3í246FS+15daF<br />

0 days M66/4i12 Mm6/4í247FS+30de)s<br />

345 days Tu€ t5l12 ¡h 9/30í3<br />

s drys fu.61562 ltls.,7t16ñ244<br />

2ô0 dsys rúe7n7n2 M8l1Z1350<br />

35 óys Tu. &13/13 h 9/130/1351<br />

345 &ys Tue 6/t12 Mo 9ßUî3<br />

345 &ys lue 6/5n2 h S0/13<br />

345 dsys lue 6/5r'12 [rø 9ß0/13 49SS<br />

345 6F Tue 6/112 [,]ø 9ß0ñ349SS<br />

345 d8F Tue 6/5/12 Man 960n3<br />

345 days Tuc 6r'5l'12 ird 9391349Ss<br />

Spl[ Mlestoo O Plqêd Sumary (- ' ExtendMlêsm. 'i<br />

Pâs 1<br />

Grant Agreement No. 460000XXXX<br />

Page 25 of42<br />

ok4'æJ1q{r1.2!1atr2..2q1lar3.?9.1-qtr4''æ'!'-9F,l,?-o.1-l'çdr-a?0'!,;q(¡,'4!f]lfJ,4l.]'!år:t.21]:l.!lt'2.2urqf-{'¿U'r.\4l9..4l:-q[ÍlJ<br />

octl o G,JanêMararl sJuntJul u ô.odo €JånFMtÆrl aJunlJull u GG[ o eJEnëMårAøsJunJul u.eo.Oo !,Jåni rl<br />

o5ñ<br />

or


Exnr¡rr C<br />

Buoon<br />

Lake Carnanche Tank Rehabilitation &, Lateral Replacern€nt Proiect (DAC)<br />

<strong>Amador</strong> <strong>Water</strong> System Leak Testing &-Repair P'roiect<br />

Other State Funds<br />

Being Used<br />

Grant Agreement No. 460000XXXX<br />

Page 26 oJ 42<br />

Direct Proiect Administration Costs 49,822<br />

Land Purchase/Easement<br />

Plannin g/Design/E n gin eerin g/ Environ mental<br />

Documentation<br />

L7,040<br />

C onstruction/lmplementation 483,427 483,427<br />

Environmental Compliance/ Mitigation/Enhancement<br />

Constru ction Administration 2't,522 2L,522<br />

Construction/lmplementation C ontingency<br />

Grand Total 577,4LO<br />

Direct Project Administration Costs<br />

Land Purchase/Easement<br />

Planning/ Design/En gineering/ Environmental<br />

Documentation<br />

C onstru ction /I mplementation<br />

Environmental Compliance/ Mitigation/Enhancement<br />

C onstruction Ad min istration<br />

Construction/l mplementation C ontingency<br />

*Source of funding: <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

232,573<br />

Other State Funds<br />

Being Used<br />

3LO,240


EXHIBII C<br />

Buoc¡r (conrtHueo)<br />

West Point <strong>Water</strong> Main & Tank Replacement Proiect (DAC)<br />

Budget Category Non-State<br />

Share<br />

(Funding<br />

Matchì<br />

Requested Grant<br />

Funding<br />

Other State Funds<br />

Being Used<br />

Grant Agreement No. 460000XXXX<br />

Page 27 of42<br />

(a) Direct Proiect Administration Costs $ $ 42,047 Þ 5 qz,oqt<br />

(b) Land Purchase/Easement \ $ 10,000 \ 5 10,000<br />

(c) Planning/Design/Engineering/Environmentaì<br />

$ $ 25,000 $ $ 25,Ooo<br />

(d)<br />

Documentation<br />

Constru ction /Imp lementation $ $ L,1-83,200 $ s 1,183,200<br />

(e) Environmental Compliance/ Mitigation/Enhancement $ $ 9,23e q 5 9,239<br />

(Ð Con stru ction Administration $ s 76,1.90<br />

Total<br />

q s 76,r.90<br />

(e)<br />

(h)<br />

Other Costs<br />

Construction/lmplementation Contingency<br />

Þ<br />

q<br />

$<br />

$<br />

30,600<br />

118,320<br />

$<br />

$<br />

S<br />

5<br />

so,ooo<br />

1_ 18,320<br />

(i) Grand Total $ $ L,494,596 $ s 1,494,596<br />

DWR opproves invo¡ce poymenls ond budget omendments of the overorching Tosk-level. Subtosks ore provided in the Work Plon <<br />

odditionol detoil, ond guidonce for lhe project monoger to be owore of when odministering the Gront Agreement.<br />

DWR will reimburse the grontee for costs incurred ofler the Gront Agreemenl is execuled. using the concurrent drowdown bv losk mel<br />

retention. Thol is. if there is grontee cost motch ond DWR gront shore ossocioted with o tosk; lhen gront funds ond locol motch dollors<br />

expended simultoneously in occordonce with the percentoge (proportion) of funds coming from locol cosls ond gront funds shown in<br />

Exomole: A Grontee submits lnvoice I lhot includes cosis for Tosk 2 of o gront ogreement; ond Tosk 2 is splil os locol cost shore<br />

gront shore os75% for o totol of $100. lf ihe grontee submiÌs on invoice for $4, then $l would be drown down from the locol co<br />

93 would be reimbursed f rom the gronl shore (minus l0% reteniion 0.30 cents). The lotol lnvoice I reimbursement for the gronte<br />

$2.7O.<br />

lf the grontee submits invoices for ollowoble motch costs for the period between September 30, 2008 ond prior to initiotion of lhe grc<br />

those costs of DWRs discrelion, will be directly deducted from the grontees cosl shore<br />

The lO percent reteni¡on wiihheld by DWR on eoch invoice, by tosk, will be releosed to ihe grontee upon: i ) DWRs receipt of o reque<br />

retention, ond 2) confirmotion by DWR thot oll deliverobles shown in Exhibit A hove been received.


Exxtstr D<br />

Smuoano Cor.rorttot¡s<br />

D.I ACCOUNTING AND DEPOSIT OF GRANT DISBURSEMENT:<br />

o) SEPARATE ACCOUNTING Ot GRANT DISBURSEMENT AND INTEREST RECORDS: Grontee sholl occount for<br />

the money disbursed pursuont to this Gront Agreement seporotely from oll other Grontee funds.<br />

Grontee sholl mointoin oudit ond occounting procedures thot ore in occordonce with generolly<br />

n¡¡ontarl vvvv|\/rvv occounfing principles ond proctices, consistenÌly opplied. Grontee sholl keep complete<br />

ond occurote records of oll receipts, disbursements, ond interest eorned on expenditures of such<br />

funds. Grontee sholl require its controctors or subcontroctors lo mointoin books, records, ond other<br />

documents pertinent to their work in occordonce wilh generolly occepted occounting principles ond<br />

proctices. Records ore subject to inspection by Stote of ony ond oll reosonoble times.<br />

b) FISCAL MANAGEMENT SYSTEMS AND ACCOUNTING STANDARDS: The Grontee ogrees thol, ol o<br />

minimum, its fiscol control ond occounling procedures will be sufficient to permit trocing of gront funds<br />

to o level of expenditure odequote to estoblish thot such funds hove not been used in violotion of<br />

stote low or lhis Gront Agreement.<br />

c) REMITTANCE OF UNEXPENDED FUNDS: Grontee, within o period of sixty (ó0) colendor doys from the finol<br />

disbursement from Stote to Grontee of gront funds, sholl remil to Stote ony unexpended funds thol<br />

were disbursed to Grontee under this Gront Agreement ond were not needed to poy Elígible Project<br />

Costs.<br />

D.2 ACKNOWLEDGEMENT OF CREDIT: Grontee sholl include oppropriote ocknowledgement of credit to lhe<br />

Stote ond to oll cost-shoring portners for their support when promoting the Project or using ony doto ond/or<br />

informotion developed under this Gront Agreement. During construction of the Project, Grontee sholl instoll<br />

o sign of o prominent locotion which sholl include o slotement thot the Project is finonced under the Sofe<br />

Drinking Woter. Woter Quolity ond Supply, Flood Conlrol, River ond Coostol Protection Bond Act of 2006,<br />

odministered by Stote of Colifornio, Deportmenl of Woter Resources. Grontee sholl notify Sfote thot lhe sign<br />

hos been erected by providing them with o site mop with the sign locotion noted ond o photogroph of the<br />

srgn.<br />

D.3 AMENDMENT: No omendment or vorioTion of the ferms of lhis Gront Agreement sholl be volid unless<br />

mode in wriÌing, signed by lhe porties ond opproved os required. No orol understonding or ogreemenl not<br />

incorporoted in the Gront Agreement is binding on ony of the porties. For guidonce on the Amendment<br />

Requirements see Exhibit H.<br />

D.4 AMERICANS WITH DlSABltlTlES ACT: By signing this Gront Agreement, Gronlee ossures Stoie thot it<br />

complies with the Americonswith Disobilities Act (ADA) of 1990, (42 U.S.C., l2l0l etseq.), which prohibits<br />

discriminotion on the bosis of disobility, os well os oll opplicoble regulotions ond guidelines issued pursuont<br />

lo the ADA.<br />

0.5 AUDITS: Stote reserves the right to conduct on oudit of ony time between the execution of this Gront<br />

Agreement ond the completion of the Project, with the costs of such oudit borne by Stote. After completion<br />

of the Project, Stole moy require Grontee to conducl o finol oudit, of Grontee's expense, such oudit to be<br />

conducted by ond o reporf prepored by on independent Certified Public Accountont. Foilure or refusol by<br />

Grontee to comply wilh this provision sholl be considered o breoch of this Gront Agreemenl, ond Stote moy<br />

toke ony oction it deems necessory to protect its interests.<br />

Pursuont to Governmeni Code Section 8546.7, the porties sholl be subject to the exominotion ond oudit of<br />

Slote for o period of three yeors ofter finol poyment under lhis Gronl Agreement with respect of oll motters<br />

connected with this Gront Agreement. including but nol limíted to, the cosl of odministering Ìhis Gronï<br />

Agreement. All records of Groniee or subcontroclors sholl be preserved for this purpose for of leost three (3)<br />

yeors ofter Project completion. See Exhibit H for o listing of documents/records thot Stote Auditors would<br />

need to review in the event of o gront being oudited.<br />

D.ó BUDGET CONTINGENCY: LIMIT ON STATE FUNDS. Sofe Drinking Woler, Woter Quolity ond Supply, Flood<br />

Control,_River ond Coostol Protection Bond Acl o12006 is subject to the ovoilobility of funds including ony<br />

mondotes from the Deportment of Finonce, the Pooled Money lnvestment Boord or ony other stote


Grant Agreement No. 460000XXXX<br />

Page 29 of42<br />

outhority. The Stote will not moke poyments of ony kind, including odvonces or reimbursements, until<br />

funding is mode ovoiloble by the Stote Treosurer.<br />

D.7 CHILD SUPPORT COMPLIANCE ACT: For ony Gront Agreement in excess of $100,000, the Grontee<br />

ocknowledges in occordonce with Public Controct Code Zl 10, thot:<br />

o) The Grontee recognizes the importonce of child ond fomily supporl obligotions ond sholl fully comply<br />

with oll opplicoble stote ond federol lows reloting to child ond fomily support enforcement, including,<br />

but not limited to, disclosure of informotion ond complionce with eornings ossignment orders, os<br />

provided in Chopler B (commencing with section 5200) of Port 5 of Division 9 of the Fomily Code; ond<br />

b) The Grontee, to the best of its knowledge is fully complying with the eornings ossignment orders of oll<br />

employees ond is providing the nomes of oll new employees to the New Hire Registry mointoined by the<br />

Colifornio Employment Development Deportment.<br />

D.8 COMPETITIVE BIDDING AND PROCUREMENTS: Grontee sholl comply with oll opplicoble lows ond<br />

regulotions regording securing competitive bids ond undertoking competitive negotiotions in Grontee's<br />

controcts with other entiiies for ocquisition of goods ond services ond conslruction of public works with<br />

funds provided by Stote under this Gront Agreement.<br />

D.9 COMPUTER SOFTWARE: The Grontee certifies thol it hos oppropriote systems ond controls in ploce to<br />

ensure thot stote funds will nol be used in the performonce of this Gront Agreement for the ocquisition,<br />

operotion, or mointenonce of computer softwore in violotion of copyright lows.<br />

D.IO CONILICT OF INTEREST<br />

o) Current Stote Employees: No Stote officer or employee sholl engoge in ony employment, octivity, or<br />

enterprise from which the officer or employee receives compensolion or hos o finonciol interest ond<br />

which is sponsored or funded by ony SÌote ogency, unless the employment, oclivity, or enterprise is<br />

required os o condition of regulor Stote employment. No Stote officer or employee sholl controct on his<br />

or her own beholf os on independent conïroctor with ony Stote ogency to provide goods or services.<br />

b) Former Stote Employee: For the two-yeor period from the dote he or she left Stote employment, no<br />

former Stote officer or employee moy enter into o controct in which he or she engoged in ony of the<br />

negotiolions, lronsoclions, plonning, orrongements, or ony port of lhe decision-moking process relevont<br />

io the controct while employed in ony copocity by ony Stote ogency. For the lwelve-month period<br />

from the dote he or she left Stote employment, no former Stote officer or employee moy enter into o<br />

confroct with ony StoTe ogency if he or she wos employed by thot Stote ogency in o policy-moking<br />

position in the some generol subject oreo os the proposed controct wíthin the lwelve-month period<br />

prior to his or her leoving Stote service.<br />

D.t I DELIVERY OF INFORMATION, REPORTS, AND DATA: The Grontee ogrees to expeditiously provide, during<br />

work on the Project ond Ìhroughout the term of this Gront Agreement, such reports, doto, informotion. ond<br />

certificotions os moy be reosonobly required by the Stote.<br />

D.12 DISPOSITION OF EQUIPMENT: Grontee sholl provide lo Stote, not less Ìhon 30 doys prior to submission of<br />

the finol project invoice, o finolinventory list of equipment purchosed with gront funds provided by Stole.<br />

Grontee sholl consult with Slote on the scope of the inventory nol less thon ó0 doys prior to the submission of<br />

the finol project invoice. The inventory sholl include oll items with o current eslimoted foir morket volue of<br />

more thon $5,000 per item. Within ó0 doys of receipf of such invenÌory, Stote sholl provide Grontee with o lisl<br />

of the items on the inventory thot Stote will toke title to. All other items sholl become ihe property of<br />

Grontee. Stote sholl orronge for delivery from Grontee of items thot it tokes title to. Cost of tronsportotion, if<br />

ony, sholl be borne by Sfote.<br />

D.l3 DISPUTES: ln the event of on invoice dispute, poyment will not be mode until the dispute is resolved ond<br />

o corrected invoice submitted. Foilure to use the oddress exoclly os provided moy result in return of the<br />

invoice to fhe Gronlee. Poyment sholl be deemed complete upon deposit of fhe poyment, properly<br />

oddressed, postoge prepoid, in the United Stotes moil. Any cloim thot Grontee moy hove regording the<br />

performonce of this Gront Agreemeni including, but not limited to cloims for odditionol compensotion or<br />

extension of time, sholl be submitted to the Director, Deportment of Woter Resources, within thirty (30)


Grant Agreement No. 460000X<br />

Page 30 of42<br />

colendor doys of Grontee's knowledge of the cloim. Stote ond Grontee sholl then ottempt to negotiote o<br />

resolution of such cloim ond process on omendment to the Gront Agreement to implement the terms of<br />

ony such resolution.<br />

D.I4 DRUG-FREEWORKPLACECERTIFICATION<br />

Certificolion of Complionce: By signing this Gronl Agreement, GronTee, its controctors or subcontroctors<br />

hereby certify, under penolty of perjury under the lows of Stote of Colifornio, complionce with the<br />

requirements of the Drug-Free Workploce Act of 1990 (Government Code 8350 ef seq.) ond hove or will<br />

provide o drug-free workploce by toking the following octions:<br />

o) Publish o stotement notifying employees, controctors. ond subcontroctors thot unlowful monufocture,<br />

distribution. dispensotion, possession, or use of o controlled substonce is prohibited ond specifying<br />

octions lo be token ogoinst employees, controctors, or subcontroctors for violotions. os required by<br />

Government Code Section 8355(o).<br />

b) Estoblish o Drug-Free Aworeness Progrom, os required by Government Code Section 8355(b) to inform<br />

employees, controciors, or subcontroctors obout oll of the following:<br />

l. The dongers of drug obuse in the workploce,<br />

2. Grontee's policy of moinToining o drug-free workploce,<br />

3. Any ovoiloble counseling, rehobililotion, ond employee ossistonce progroms, ond<br />

4. Penolties thot moy be imposed upon employees, controctors, ond subcontroctors for drug<br />

obuse violotions.<br />

c) Provide os required by Government Code Sections 8355(c), thot every employee, confroctor,ond/or<br />

subcontroctor who works under this Gront Agreement:<br />

l. Will receive o copy of Grontee's drug-free policy stotemenl, ond<br />

2. Will ogree to obide by terms of Grontee's condition of employment. controct or subcontroct.<br />

D.t5 FINAt INSPECTIONS AND CERTIFICATION OF REGISTERED CIVIL ENGINEER: Upon completion of o<br />

consiruction project ond os delermined by Stote. Grontee sholl provide for o finol inspection ond<br />

certificotion by o Colifornio Registered Civil Engineer thot the project hos been compleÌed in occordonce<br />

wilh submitted finol plons ond specificolions ond ony modificotions thereto ond in occordonce with this<br />

Gront Agreement ond lo the Stote's sotisfoction.<br />

D.16 GOVERNTNG LAW: This Gront Agreement is governed by ond sholl be interpreted in occordonce wilh<br />

the lows of the Slote of Colifornio.<br />

D.17 GRANTEE COMMITMENTS: Grontee occepts ond ogrees to comply with oll terms, provisions, conditions,<br />

ond commilments of this Funding Agreement, including oll incorporoted documents, ond lo fulfill oll<br />

ossuronces, oeclorofions, representotions, ond stolements mode by Funding Recipient in the opplicotion,<br />

documents, omendments, ond communicotions filed in support of ils requesl for Colifornio Sofe Drinking<br />

Woter, Woter Quolity ond Supply, Flood Control, River ond Coostol Protection Act of 200ó finoncing.<br />

D.l8 INCOME RESTRICTIONS: The Grontee ogrees thot ony refunds, rebotes, credits, or other omounts<br />

(including ony interesi thereon, occruing to or received by the Grontee under this Gront Agreement sholl<br />

be poid by the Grontee to the Stote, to the extent thot lhey ore properly ollocoble lo costs for which the<br />

Grontee hos been reimbursed by the Stote under this Gront Agreement.<br />

D.l9 INDEPENDENT CAPACITY: Gronlee, ond the ogents ond employees of Grontee, if ony, in the<br />

performonce of the Gront AgreemenÌ, sholl oct in on independent copocity ond not os officers,<br />

employees. or ogents of the Stote,<br />

D.20 INSPECT¡ONS: Stote sholl hove the righl lo inspecÏ the work being performed of ony ond oll reosonoble<br />

times, providing o minimum of o24-hour notice, during the term of the Gront Agreement. This right sholl<br />

extend to ony locol project sponsor, subogreements, ond Grontee sholl include provisions ensuring such<br />

occess in oll its controcls or sub-controctors entered into pursuont to iTs Gront Agreement with SÌote.<br />

Grontee ocknowledges thot Project documents moy be subjecl lo the Public Records Act (Colifornio<br />

Government Code Section 6250 el. seq.).Stote sholl hove the right to inspect these documents of ony ond<br />

oll reosonoble Ìimes ofter completion of Ìhe Project lo ensure complionce with the terms ond conditions of


Grant Agreement No. 460000XXXX<br />

Page 3I of42<br />

this Gront Agreement, During regulor office hours, Stote sholl hove the ríght to inspect ond to moke cop¡es<br />

of ony books, records, or reporls of lhe Grontee reloting to lhis Gront Agreement. Grontee sholl mointoin<br />

ond sholl moke ovoiloble of oll times for such inspection occurote records of its costs, disbursements. ond<br />

receipts with respect to its octivities under this Gront Agreement. Foilure or refusol by Grontee to comply<br />

with this provision sholl be considered o breoch of this Gront Agreement, ond Slote moy withhold<br />

disbursemenÌs to Grontee or toke ony olher ocTion it deems necessory to protecÌ ils interests.<br />

D.21 NONDISCRIMINATION: During Ìhe performonce of this Gront Agreement, Grontee ond its controctors<br />

sholl not unlowfully discriminote, hoross, or ollow horossment ogoinst ony employee or opplicont for<br />

employmenf becouse of sex, roce, color, oncestry, religious creed, notionol origin. physicol disobility<br />

(including HIV ond AIDS), mentol disobility, medicol condition (concer), oge (over 40/, moritol stotus, ond<br />

deniol of fomily core leove. Grontee ond controctors sholl ensure thol the evoluotion ond treotment of their<br />

employees ond opplíconts for employment ore free from such discriminotion ond horossment. Grontee ond<br />

confroctors sholl comply with the provisions of the Foir Employment ond Housing Act (Government Code<br />

Section 12990 (o-f) et seq.) ond the opplicoble regulotions promulgoted there under (Colifornio Code of<br />

Regulotions ,TiIle 2, Section 7285 et seg.). The opplicoble regulolions of the Foir EmploymenÌ ond Housing<br />

Commission implementing Government Code Section 12990 (a11, set forth in Chopter 5 of Division 4 of Title<br />

2 of lhe Colifornio Code of Regulotions, ore incorporoted into this Gront Agreement by reference ond<br />

mode o port hereof os if set forth in full. Grontee ond its controctors sholl give written notice of their<br />

obligotions under this clouse to lobor orgonizotions with which they hove o collective borgoining or ofher<br />

ogreement. Grontee sholl include the nondiscriminotion ond complionce provisions of this clouse in oll<br />

controcts to perform work under the Gront Agreement.<br />

D.22 NO THIRD PARTY RIGHTS: The porties to this Gront Agreement do not intend to creote ríghts in, or gronl<br />

remedies to, ony third porty os o beneficiory of this Gront Agreement, or of ony duty, covenont, obligoÌion<br />

or undertoking estoblished herein.<br />

D.23 OPINIONS AND DETERMINATIONS: The porties ogree thot review or opprovol of ony IRWM Progrom<br />

opplicotions, documents, permits, plons ond specificotions or other progrom informolion by the Stote is for<br />

odministrotive purposes only ond does noT relieve the Grontee of its responsibility to properly plon, design,<br />

construct, operote, mointoin, implement, or otherwise corry out the IRWM Progrom.<br />

D.24 PERMITS, LICENSES, APPROVALS, AND tEGAt OBLIGATIONS. Grontee sholl be responsible for obtoining<br />

ony ond oll permits, licenses, ond opprovols required for performing its obligotions under this Gront<br />

Agreemenl. Grontee sholl comply with the Colifornio Environmentol Quolity Act (PRC Section 2ì000 ef seq.)<br />

ond other opplicoble federol, Stote, ond locol lows, rules, ond regulofions, guidelines, ond requirements<br />

prior to disbursement of funds under this Gront Agreement.<br />

Without limiting the foregoing, Funding RecipienÏ sholl keep ìnformed of ond toke oll meosures necessory to<br />

ensure complionce wilh Colifornio Lobor Code requirements, including but noT limited to Section 172O et<br />

seq. of the Colifornio Lobor Code regording public works, limitotions on use of volunteer lobor (Colifornio<br />

Lobor Code Section 1720.4),lobor complionce progroms (Colifornio Lobor Code Seclion 1/71.5), ond<br />

poyment of prevoiling woges for work done under this Funding Agreement. Pursuont lo the provisions of<br />

Proposition 84, the Sofe Drinking Woter, Woter Quolity ond Supply, Flood Control, Rîver ond Coostol<br />

Protection Bond AcT of 2006, Col. Pub. Res. Code $ Z50Zó ef seq., the Funding RecipienÌ must hove o lobor<br />

complionce progrom lhot meets the requirements of Colifornio Lobor Code Section 1771.5.<br />

D.25 PROHIBITION AGAINST DISPOSAL OF PROJECT WITHOUT STATE PERMISSION: Grontee ond Locol Projecï<br />

Sponsors sholl not sell, obondon, leose, tronsfer, exchonge, mortgoge, hypothecole. or encumber in ony<br />

monner whotsoever oll or ony porlion of ony reol or other property necessorily connected or used in<br />

conjunction wilh the IRWM Progrom withoul prior permission of Stote. Grontee ond Locol ProjecT Sponsors<br />

sholl not loke ony oction concernîng The performonce of this Gront Agreement, including but not limited to<br />

octions reloling to user fees, chorges, ond ossessments thot could odversely offect the obility of Grontee to<br />

meet its obligotions under ihis Gront Agreement, without prior written permission of Stote. Stote moy require<br />

rhni tha nrnnaad5 from the disposition of ony reol or personol property ocquired with funds disbursed under<br />

rv vrvvvv\<br />

this Gront Agreement be remilled to Stote.


Grant Agreement No. 460000XXXX<br />

Page 32 of42<br />

D.26 REMEDIES, COSTS, AND ATTORNEY FEES: The Grontee ogrees thot ony remedy provided in this Gront<br />

Agreement is in oddition to ond not in derogotion of ony other legol or equitoble remedy ovoiloble to the<br />

Stote os o result of breoch of this Gront Agreement by the Grontee, whether such breoch occurs before or<br />

ofter completion of the Project. ond exercise of ony remedy provided by this Gront Agreement by the Stote<br />

sholl nol preclude the Stote from pursuing ony legol remedy or right which would otherwise be ovoiloble. ln<br />

the event of litigotion belween the porties hereto orising from this Gront Agreement, it is ogreed thot the<br />

prevoiling porty sholl be entitled to such reosonoble costs ond/or ottorney fees os moy be ordered by the<br />

court enterToining such liligotion.<br />

D.27 RETENTION: Notwithstonding ony other provision of this Gront Agreement, Stote sholl, for eoch project,<br />

withhold five percent (5.0%) until Jonuory 1,201ó ond ten percent (10.0%), thereofter, of the funds<br />

requested by Grontee for reimbursement of Eligible Costs. Eoch project in this Gront Agreement will be<br />

eligible lo releose its respective retention when thot project is completed ond Grontee hos met<br />

requirements of Porogroph 17, "Submíssions of Reports" os follows. At such time os the "Project CompleÌion<br />

Report" required under Porogroph l7 is submiited to ond opproved by Stote. Stote sholl disburse fhe<br />

retoined funds os to thot project to Grontee, except in the cose of the lost project to be completed under<br />

this Gront Agreement, in which cose retention for such project will not be disbursed until the "Gront<br />

Completion ReporÌ" is submitted to ond opproved by SÌote.<br />

D.28 RIGHTS lN DATA: To the extenl permitted by low, the Grontee ogrees thot oll doto, plons, drowings,<br />

specificotions, reports, computer progroms, operoting monuols, notes, ond other written or grophic work<br />

produced in the performonce of this Gront Agreement sholl be in the public domoin. The Grontee moy<br />

disclose, disseminote ond use in whole or in port, ony finol form doto ond informolion received, collected,<br />

ond developed under this Gronl Agreement, subject to oppropriote ocknowledgemenï of credit to the<br />

Stote for finonciol support. The Grontee sholl not utilize the moteriols for ony profit-moking venture or sell or<br />

gront rights to o third porty who intends to do so.<br />

D.29 SEVERABIIITY OF UNENFORCEABTE PROVISION: lf ony provision of this Gront Agreemenl is held involid or<br />

unenforceoble by o court of finoljurisdiction, oll olher provisions of this Gront Agreement sholl be consfrued<br />

to remoin fully volid, enforceoble, ond binding on the porties.<br />

0.30 SIATE REVIEWS AND INDEMNIFICATION: The porties ogree thot review or opprovol of Project<br />

opplicotions, documents, permits, plons ond specificotions or other Project informotion by the Stoie is for<br />

odministrotive purposes only ond does not relieve the Gronlee or Locol Project Sponsors of their<br />

responsibility Ìo properly plon, design, construct, operole, mointoin. implement, or otherwise corry out the<br />

Project. To the extenl permitted by low, the Grontee ond Locol Project Sponsors ogree to indemnify,<br />

defend ond hold hormless the Stote ond the Stote ogoinst ony loss or liobility orising out of ony cloim or<br />

oction broughl ogoinst the Stote from ond ogoínst ony ond oll losses, cloims, domoges, liobililies or<br />

expenses, of every conceivoble kind, chorocter ond noture whotsoever orising out of, resulting from, or in<br />

ony woy connected with:<br />

o) The Project or the conditions, occuponcy, use, possession, conduct or monogemeni of, work done in or<br />

obout, or the plonning, design, ocquisition, instollotion, or consfruction, of the Project or ony port<br />

thereof;<br />

b) Performing ony of lhe terms conioined in this Gront Agreement or ony reloted document;<br />

c) Any violotion of ony opplicoble low, rule or reguloÌion, ony environmentol low (including, without<br />

limitotion, lhe Federol Comprehensive Environmentol Response, Compensotion ond Liobility Act, the<br />

Resource Conservotion ond Recovery Act, the Colifornio Hozordous Substonce Account Acl, the<br />

Federol Woter Pollution Control Act, the Cleon Air Act, the Colifornio Hozordous Woste Control Low ond<br />

CWC Section 13304, ond ony successors to soid lows), rule or reguloÌion or the releose of ony toxic<br />

substonce on or neor the noturol woter system; or<br />

d) Any untrue stotement or olleged untrue stotement of ony moteriol foct or omission or olleged omission<br />

to stote o moteriol foct necessory to moke the stotements required to be stoted lherein, in light of the<br />

circumstonces under which fhey were mode, not misleoding with respect to ony informotion provided<br />

by the Grontee for use in ony disclosure document utilized in connection with ony of the Tronsoctions<br />

contemploted by this Gront Agreement. Gronlee ogrees to poy ond dischorge ony judgment or oword<br />

entered or mode ogoinsT the Stote with respect To ony such cloim or oction, ond ony setflement,


Grant Agreement No. 460000XXXX<br />

Page 33 of42<br />

comþromise or other voluntory resolution. The provisions of this section sholl survive the term of the Gront<br />

Agreement.<br />

D.3l SUCCESSORS AND ASSIGNS: This Gront Agreement ond oll of its provisions sholl opply to ond bind the<br />

successors ond ossigns of lhe porties. No ossignment or tronsfer of this Gront Agreement or ony port thereof,<br />

rights hereunder, or interest herein by lhe Grontee sholl be volid unless ond until it is opproved by Stote ond<br />

mode subject to such reosonoble terms ond conditions os Stote moy impose.<br />

D.32 TIMELINESS: Time is of the essence in this Gront Agreement.<br />

D.33 TRAVEI: Grontee ogrees thot trovel ond per diem costs sholl NOT be eligible for reimbursement with<br />

Stote funds, ond sholl NOT be eligible for computing Grontee cost motch. Trovel includes the costs of<br />

tronsportotion, subsistence, ond other ossocioted costs incurred by personnel during the term of this Gront<br />

Agreemenï.<br />

D.34 WAIVER OF RIGHTS: None of the provisions of this Gront Agreement sholl be deemed woived unless<br />

expressly woived in writing. lt is the intention of the porties here Io thot from time lo time either porty moy<br />

woive ony of its rights under this Gront Agreement unless controry to low. Any woíver by either porty of rights<br />

orising in connection with the Gront Agreemenl sholl nol be deemed to be o woiver with respect to ony<br />

other rights or motters, ond such provisions sholl continue in full force ond effect.


EXHIEtr E<br />

R¡ponl FORMAT AND REQUIREMENTS<br />

Grant Agreement No. 460000XXXX<br />

Page 34 of42<br />

The following reporting formots should be utilized. Pleose obtoin Stote opprovol prior to submitting o report in on<br />

olternotive formot.<br />

QUARTERLY PROGRESS REPORT<br />

Grontee shollsubmit Quorterly Progress Reports on o consistenl bosis to meet the Stote's requirement for<br />

disbursement of funds. The quorterly progress report should describe the work performed during the reporting<br />

period. For eoch project, describe the work performed including:<br />

CONTINUING ETIGIBITITY<br />

o For Urbon Woter Suppliers who hove not submitted o complete Urbon Woter Monogement Plon, the<br />

stotus of lhe plon development ond submittol.<br />

o A brief summory of the stotus of odoption of on IRWM Plon thot complies with Port 2.2 of Division ó of<br />

the CWC commencing with Section 10530.<br />

¡ Discuss the reosonoble ond feosible efforts to engoge DAC into your IRWM efforts in regords to<br />

plonning ond projecis thot support lheir criticol woter supply or woter quolíty needs.<br />

o Upon odoption of IRWM Plon, submit on eleclronic copy with the progress report.<br />

PROJECT INFORMATION (lr.rcruoE ANy oF THE BELow THAT wERE Appr.rcABtE DURTNc THE REPoRTINc rentoo)<br />

. Legol motters.<br />

. Engineering motters.<br />

. Environmentolmotters.<br />

. Stotus of permits, eosements, rights-of-woy, ond opprovols os moy be required by other Slote,<br />

federol, ond/or locol ogencies.<br />

. Mojor occomplishments during the quorter (i.e. tosks completed, milestones met, meetings held or<br />

oltended, press releoses, etc).<br />

. Discussion of doto submittol effort(s) for the previous quorter, including o description of the doto<br />

submitled ond dote(s) of submittol.<br />

. lssues/concerns thot hove, will, or could offect the schedule or budget, with o recommendotion on<br />

how to correct the motter.<br />

. Description of ony differences between the work performed ond the work outlined in the project<br />

work plons.<br />

. Description of ony efforts to updote IRWM Plon to obligotions listed in Porogroph 12, "Continuing<br />

Eligibility, if opplicoble."<br />

COST INFORMATION<br />

. Provide o List showing oll costs incurred during the quorter by the grontee, the Locol Project Sponsor<br />

overseeing the work, ond eoch controctor working on the projeci. The list should include for oll nonconstruction,<br />

or implemenlotion costs, (i.e., design, ond odmin chorges) the hours per tosk worked<br />

on during the quorter for obove personnel.<br />

. A discussion on how the octuol budget is progressing in comporison lo the project budget included<br />

in the Work Plon.<br />

. A revised budget, including on explonotion of why the revisions were necessory, by tosk, if chonged<br />

from lotest budget shown in Appendix C. Budgel. Note, o revised budget moy require on offíciol<br />

omendment to the Agreement before it is occepted os finol.


Grant Agreement No. 460000XXXX<br />

Page 35 of42<br />

SCHEDUTE INFORMATION<br />

. A schedule showing octuol progress verse plonned progress os shown in Exhibil B.<br />

. A discussion on how the octuol schedule is progressing in comporison io the schedule in Exhibit B.<br />

. A revised schedule, by tosk, if chonged from lotest schedule in Exhibit B. Note, o revised schedule<br />

moy require on officiol omendment to the Agreement before iÌ is occepted os finol.<br />

ANTICIPATED ACTIVITIES NEXT QUARTER<br />

. Provide o description of onticipoted octivities for the next quorterly reporting period.<br />

PROJ ECT COMPLETION REPORT<br />

A Project Completion Report is required for eoch project identified in lhe Work Plon, Exhibit A. This report will<br />

include the following Sections:<br />

EXECUTIVE SUMMARY<br />

The Execulive Summory consists of o moximum of ten (10) poges summorizing project informotion (see<br />

report stotus seclion below for topics). The Executive Summory should include the following:<br />

. Brief description of work proposed to be done in the originol Sofe Drinking Woter. Woter Quolity ond<br />

Supply, Flood Control, River ond Coostol Protection Bond Act of 200ó IRWM Implementoiion Gront<br />

opplicotion.<br />

. Description of octuolwork completed ond ony deviotions from lhe work plon identified in lhe Gront<br />

Agreement. List ony officiol omendments to the Agreement, with o short description of the<br />

omenomenT<br />

. Describe the mechonism or process thot ollows for continued performonce monitoring of the<br />

projects in meeting the objectives of the IRWM Plon'<br />

REPORTS AND/OR PRODUCTS<br />

. províde o copy of ony finol technicol report or study. produced for this project os described in the<br />

Work Plon, if opplicoble.<br />

. Provide o mop ond shopefile(s) showing the locotion of the completed project. A description of the<br />

geogrophic projection ond dotum used for the shopefile must be submitted with the shopefile (o<br />

ÑRD'83 dotum qnd either o UTM l0 or UTM 1 I projection, dependent on the projecl's locotion in<br />

the stote, should be utilized).<br />

. lf ony wells were constructed os pori of the project, provide the following informotion:well logs;<br />

borehole geophysicol logs; stote well number; site informotion to include horizontol (NAD '83) ond<br />

verticol (NAVD 'BB) dotum to be determined within 0.5 feet.<br />

. Provide on electronic copy of ony os-built plons (medio: CD-ROM; PDF formot).<br />

. Provide copies of ony doto collected olong wilh locotion mops.<br />

. lf opplicoble. describe lhe findings of ony study ond whether the study determined the engineering,<br />

hydrologic, hydrogeologic, environmentol, economic ond finonciolfeosibility of the project.<br />

o lf opplicoble, o discussion of the criticol woter supply or woter quolity benefits lo DAC os port of This<br />

Gront Agreement.<br />

COST & DISPOSITION OF FUNDS INFORMATION<br />

o A lisl of invoices showing:<br />

in this section).


Grant Agreement No. 460000XXXX<br />

Page 36 of42<br />

. A spreodsheet summory of the originol budgeÌ costs by tosk versus the finol project costs<br />

. A summory of finol funds disbursement including:<br />

hours, rotes, type of profession ond reoson for consultont, i.e., design, CEQA work, etc).<br />

. Summory of project cost including:<br />

from the originol project cost estimote.<br />

ADDITIONAL INFORMATION<br />

. Benefits derived from the project, with quontificotion of such benefits provided, if opplicoble.<br />

. A finol project schedule showing octuol progress verse plonned progress.<br />

. CertificoTion from o Colifornio Registered Civil Engineer thot the project wos conducted in<br />

occordonce with lhe opproved work plon ond ony opproved modificotions thereto.<br />

. Submittol schedule for the Post Performonce Report ond on outline of the proposed reporfing<br />

formot.<br />

GRANT COMPTETION REPORT<br />

The Gront Completion Report sholl generolly use the following formot. This formot moy be modified os<br />

necessory to effectively communicote informotion on the vorious projects in the IRWM Progrom funded by this<br />

Gront Agreement, ond includes the following:<br />

EXECUTIVE SUMMARY<br />

The Executive Summory consists of o moximum of twenty (20) poges summorizing informotion for the<br />

gronl os well os the individuol projects.<br />

REPORTS AND/OR PRODUCTS<br />

. Summory of the regionol priorilies, objecÌives, ond woter monogement strotegies of the IRWM Plon.<br />

. Brief comporison of work proposed in the originol Sofe Drinking Woter, Woter Quolity ond Supply.<br />

Flood Control, River ond Coostol Protection Bond Act of 200ó IRWM lmplementotion Gront<br />

opplicotion ond octuolwork done.<br />

. Brief description of the projects completed ond how they will further the gools identified in lhe<br />

<strong>Agency</strong>'s finol opproved IRWM Plon.<br />

. Describe how the implemented projects will meet the regionol priorities identified in the finol<br />

opproved IRWM Plon ond how lhe projects contribute to regionol integrotion.<br />

. ldentify remoining work ond mechonism for lheir implementotion.<br />

. ldentífy ony chonges to lhe IRWM Plon os result of project implementotion.<br />

. Short descriplion of the two yeor IRWM Plon updote ond the doÌe when the updoted Plon wos<br />

submitted to DWR.<br />

. lf opplicoble, o short discussion on how lhe IRWM Plon will ossist in reducing dependence on Delto<br />

woter suoolies.<br />

. A discussion of the criticolwoter supply or woter quolity benefits fo DAC os port of lhis Gronf<br />

Agreement


COST & DISPOSITION OF FUNDS INFORMATION<br />

. A summory of finol funds disbursement for eoch project.<br />

ADDITIONAL INFORMATION<br />

Grant Agreement No. 460000XXXX<br />

Page 37 of42<br />

. A finolschedule showing individuol project's octuol progress durotion verse plonned progress.<br />

. Certificotion from o Colifornio Registered Civil Engineer thot the Progrom wos conducfed in<br />

occoroonce with the opproved work plon ond ony opproved modificotions thereto. Discussion of<br />

the synergies of the completed projects, including the integrotion of project benefìls ond o<br />

comporison of octuol benefits versus those discussed in the originol proposol.<br />

. Submittol schedule for lhe Post Performonce Reports for eoch of the projects in this Gront<br />

Agreement.<br />

POST- PERFORMANCE REPORT<br />

Post Performonce Report is required onnuolly for every projecl for o period of l0 yeors beginning ofter the first<br />

yeor of operotion, ond includes the following:<br />

REPORTS AND/OR PRODUCTS<br />

. Time period of the onnuol report, i.e., Oct 2014 Ìhrough September 2015.<br />

. Short project descripÌion.<br />

. Brief discussion of the project benefits to woter quolity, woter supply, ond the environmenl.<br />

. An ossessment of ony explonotions for ony differences between the expected versus octuol project<br />

benefits in meeting IRWM priorities os stoted in the originol IRWM lmplementotion Gronl opplicotion.<br />

Where opplicoble, the reporting should include quontitotive metrics, i.e., new ocre-feef of woter<br />

produced thot yeor, ocres of wildlife hobitot odded, etc.<br />

. Summory of ony odditionol costs ond/or benefits deriving from the project since its completion, if<br />

opplicoble.<br />

. Continued reporting on meeting the Output lndicolors ond Torgets discussed in the Project<br />

Monitoring Plon discussed in Porogroph 22 of Ihis Gront Agreemenl.<br />

. Any odditionol informotion relevont to or generoted by the continued operotion of the project.<br />

ELECTRONIC REPORT FORMATTING<br />

Grontee ogrees thot work funded under this Gront Agreement will be provided in on electronic formot to Stote.<br />

Electronic submittol of finol reports, plons, sludies, doto, ond other work performed under this gront sholl be os<br />

follows:<br />

. Text preferobly in MS WORD or lext PDF formot.<br />

. Files generolly less thon l0 MB in size.<br />

. Files nomed so thot the public con determine their content. For exomple, file noming of reports must<br />

hove lhe title ond, if subdivided into smoller sized files, the chopler number/letter ond nomes in the<br />

report Toble of Contenl (TOC); files of mops, figures, ond tobles by number/letter os referenced in<br />

the TOC; well logs files with DWR-required noming convention; ond AppendÎx number/letter ond<br />

nomed in the TOC.<br />

. For projects involving o modeling componenÌ, grontee sholl provide ihe mojor input doto files,<br />

porometers, colibrotion stotistics, output files, ond other informoÏion requested by Stole's Projecl<br />

Monoger.


Exxrsrr F<br />

LocAt Pno¡¡cr SpoHsons<br />

Grant Agreement No. 460000XXXX<br />

Page 38 of42<br />

LOCAL PROJECT SPONSORS<br />

Gronlee hos ossigned, for eoch project. o Locol Project Sponsor occording to Ihe roles of the porlicipoting<br />

ogencies identified in the IRWM Plon. Locol Project Sponsors moy oct on beholf of Grontee for the purposes of<br />

individuol project monogement, oversight, complionce, ond operotions ond mointenonce. Locol Project<br />

Sponsors ore identified for eoch Sponsored ProjecÌ below:<br />

Locol Sponsor <strong>Agency</strong> Designolions<br />

Sponsored Projecl Sponsor <strong>Agency</strong> <strong>Agency</strong> Address<br />

Loke Comonche Tonk<br />

Rehobilitotion & Loterol<br />

Reolocement IDAC)<br />

Amodor WoIer System Leok<br />

Testing & Repoir Project<br />

West Point Woter Moin & Tonk<br />

ReplocemenÌ Project (DAC)<br />

Amodor Woter <strong>Agency</strong><br />

Amodor Woter <strong>Agency</strong><br />

Coloveros Counly Woter<br />

District<br />

12800 Ridge Rood<br />

Sutter Creek, CA 95ó85<br />

12800 Ridge Rood<br />

Sutter Creek, CA 95ó85<br />

P.O. Box 84ó<br />

423 Eost St. Chorles Streel<br />

Son Andreos, CA 95249


Exxrsrr G<br />

REQUIREMENTS FOR DATA SUBMITTAT<br />

Grant Agreement No. 460000XXXX<br />

Page 39 of42<br />

SURFACE AND GROUNDWATER QUATITY DATA:<br />

Groundwoter quolity ond ombient surfoce woter quolity monitoring doto thot include chemicol, physicol, or<br />

biologicol doto sholl be submitted to the Stole os described below, wilh o norrotive description of doto<br />

submittol octivities included in project reports, os described in Exhibit E.<br />

Surfoce woter quolity monitoring doto sholl be prepored for submission to the Colifornio Environmentol Doto<br />

Exchonge Network (CEDEN). The CEDEN doto templotes ore ovoiloble on the CEDEN website. lnclusion of<br />

odditionol dolo elemenls described on the doto templotes is desiroble. Doto reody for submission should be<br />

uplooded to your CEDEN Regionol Doto Center vio the CEDEN website. CEDEN website:<br />

http://www.ceden.org.<br />

lf o project's Work Plon contoins o groundwoter ombient monitoring element, groundwoter quolity monitoring<br />

doto sholl be submitted to the Stote for inclusion in the Stote Woter Resources Control Boord's Groundwoter<br />

Ambient Monitoring ond Assessment (GAMA) Progrom lnformotion on the GAMA Progrom con be obtoined ot:<br />

. lf further informotion is required. the Grontee<br />

con contoct the Stote Woter Resources Control Boord (SWRCB) GAMA Progrom. A listing of SWRCB stoff<br />

involved in the GAMA progrom con be found ot:<br />

GROUNDWATER tEVEt DATA<br />

For eoch project thot collects groundwoter level doto, Grontee will need to submit this doto fo DWR's Woter<br />

Doto Librory (WDL), wiih o norrotive description of doto submittol oclivities included in project reporÌs, os<br />

described in Exhibit E. lnformotion regording lhe WDL ond in whot formot to submit doto in con be found ot:<br />

http://wdl.woter.co. gov/.<br />

ln the neor future, DWR's WDL will be reploced by the Colifornio Stotewide Groundwoter Elevotion Monitoring<br />

progrom (CASGEM). Once this Progrom comes online Grontee will then submit groundwoter level doto to<br />

CASGEM. lnformotion regording the CASGEM progrom con be found ot:


Exhibit H<br />

Stote Audil Document Requiremenls qnd Guidelines for Grontees<br />

Under DWR Finonciol Assistonce Progroms<br />

Grant Agreement No. 460000XXW<br />

Page 40 of42<br />

The following provides o list of documenls typicolly required by Stote Auditors ond generol guidelines for<br />

Grontees. List of documents pertoins to both Gront funding ond Grontee's Funding Motch ond detoils the<br />

documents/records thot Stote Auditors would need to review in the evenf of this Gront Agreement is oudifed.<br />

Grontees should ensure lhot such records ore mointoined for eoch funded project.<br />

Lisl of Documents for Audit<br />

lnternol Conlrols:<br />

l. Orgonizotion chort (e.g., <strong>Agency</strong>'s overoll orgonizotion chort ond orgonizotion chort for this Gront<br />

Agreement's funded projects.<br />

2. Written internol procedures ond flowchorts for the following:<br />

o. Receipts, deposits ond disbursements<br />

b. Stote reimbursement requests<br />

c, Gront expenditure trocking<br />

d. Guidelines, policy, ond procedures on gront funded Progrom/Project<br />

3. Audit reports of the <strong>Agency</strong> internol control strucTure ond/or finonciol stotemenls within the lost two yeors.<br />

4. Prior oudit reports on gront funded Progrom/Project.<br />

Açrreements ond Controcts:<br />

L Originolsigned Gronl Agreement, ony omendment(s) ond budget modificotion documents.<br />

2. A lisÌing of oll bond-funded gronts received from the Stote.<br />

3. A listing of oll other funding sources for eoch project,<br />

4. All subcontroctor ond consultont controcls ond reloted or portners documents, if opplicoble.<br />

5. Controcts between the <strong>Agency</strong> ond member ogencies os reloted to this gront ogreement.<br />

lnvoices:<br />

l. lnvoices from vendors ond subcontroctors for expenditures submitted to the Stofe for poyments under this<br />

Gront Agreement.<br />

2. Documentotion linking subcontroctor invoices to Stote reimbursement, requesls ond reloted budget line<br />

items under this Gront Agreemenl.<br />

3. Reimbursement requests submitted to the Stote for this Gront Agreement.<br />

Cosh Documents:<br />

L Receipts (copies of worronts) showing poyments received from the SIote.<br />

2. Deposit slips (or bonk stotements) showing deposit of the poyments received from the Stote.<br />

3. Concelled checks or disbursement documents showing poyments mode to vendors, subcontroctors,<br />

consultonts, ond/or ogenÌs under this Gront Agreement.<br />

4. Bonk stotements showing the deposit of the receipts.<br />

Accounting Records:<br />

l. Ledgers showing enfries for receipts ond cosh disbursements.<br />

2. Ledgers showing receipts ond cosh disbursement entries of other funding sources.<br />

3. Bridging documenls thot tie the generol ledger to requests for gront reimbursement.<br />

Adminislrotion Costs: Supporting documents showing the colculolion of odministrotion costs.<br />

Personnel:<br />

l. List of oll controclors ond <strong>Agency</strong> stoff thot worked on this gront funded Progrom/Project.<br />

2. Poyroll records including timesheets for controctor stoff ond the <strong>Agency</strong> personnel who provided services<br />

chorged to this Gront Agreemenl.


Proiect Files:<br />

l. All supporting documentotion mointoined in The project files.<br />

2. Allcorrespondence reloled to this Gront Agreement.<br />

Generol Gront Agreemenl Guidelines<br />

Grant Agreement No. 460000XXXX<br />

Page 4I of42<br />

Amendment Requiremenfs:<br />

Amendments (to the work plon, budget, ond/or schedule portions of the ogreement) ore triggered when the<br />

proposed chonges ore deemed by DWR to be substontiol. Substontiol chonges generolly include chonges to<br />

the wording/scope of work, schedule or term, ond budgef. For exomple, o formol budget chonge to on<br />

Agreement is required when Ìhe proposed budget chonge for o Tosk is greoter thon l0% of the budget for thot<br />

porticulor Tosk or the Tosk to be exchonged with.<br />

Funding Motch Contribulion<br />

Funding Motch (often referred to os Grontee Cost Shore) is the omount defined in Porogroph 4 of thís<br />

Agreement. Funding Motch consists of non-Stote funds including in-kind services. ln-kind services ore defined<br />

os work performed (i.e,, dollor volue of non-cosh contributions) by the Grontee (ond potentiolly other porties<br />

involved) directly reloted to ihe execution of the scope of work (exomp/es: volunteer services, equipment use,<br />

ond focilities). The cost of which in-kind service is volued con counted os funding motch in-lieu of octuol funds<br />

(or revenue) provided by the Grontee. Other funding motch ond in-kind service eligibility conditions opply (see<br />

porogroph 9). Provided below is guidonce for cloiming funding motch wiTh ond without in-kind services.<br />

1 Adequote documentotion supporling volue of in-kind service (or volunteer service) os funding motch<br />

cloimed sholl be mointoined. Although trocked seporolely, in-kind services sholl be documenled ond, to<br />

the extenl feosible, supported by the some methods used by the Grontee for its own employees. Províde<br />

formol (on officiol letterheod) ond substontiol documentotion of in-kind service by including the following:<br />

o Describe contributed item(s) or service(s)<br />

o Purpose for which contribution wos mode (tie to scope of work)<br />

o Nome of contributing orgonizotion ond dote of confribution<br />

o Reol or opproximote volue of contribution. Who volued the contribution ond how wos the volue<br />

determined? (e.g., octuol, opproisol, foir morket volue, etc.). Justificotion of rote. (see item #4, below)<br />

o Person's nome ond function of the contributing person<br />

o Hours of contribution<br />

o lf multiole sources exist, summorize these on o toble with summed chorges<br />

o Wos contribulion provided by, obtoined with, or supporled by government funds? lf so, indicote source.<br />

2.<br />

J.<br />

4.<br />

Funding motch contribution (including in kind services) sholl be for costs ond services directly otTributed to<br />

octivities included in this Gront Agreemenl Work Plon. These services, furnished by professionol ond<br />

technicol personnel, consultonts, ond other skilled ond unskilled lobor moy be counted os in-kind if lhe<br />

octivities ore on inÌegrolond necessory port of this Gront Agreement. Evoluote eligibílity with DWR Project<br />

Monoger in odvonce of submittol.<br />

Do not trock cosh contributions mode to o project os on expenditure os you would for on in-kind service.<br />

When providing funding motch, lrock cosh contributions to the Project (i.e. revenues) ond expenditures<br />

(typicolly in-kind contribution) seporotely in on occounting system.<br />

Rotes for volunteer or in-kind services sholl be consistent with those poid for similor work in the Grontee<br />

orgonizotion. For exomple, volunteer service of cleoring vegetotion performed by on oltorney sholl be<br />

volued of o foir morkel volue for this service. not the role for professionol legol services. ln lhose instonces in<br />

which the required skills ore not found in the recipienT orgonizotion, rotes sholl be consistent with those poid<br />

for similor work in the lobor morket. ln either cose. poid fringe benefits thot ore reosonoble, ollowoble, ond<br />

ollocoble moy be included in the voluofion.


Extuslr I<br />

GnnHr¡¡ REsotuTloN<br />

BEFORE THE BOARD OF DIRECTORS OF THE<br />

UPPER MOKELUMNE RIVER WATERSHED AUTHORITY<br />

RESOLUTION 2011 - 01<br />

Grant Agreement No. 460000XXXX<br />

Page 42 of42<br />

RESOLUTION AUTHORIZING SUBMITTAL OF AN APPLICATION TO THE<br />

TNTEGRATED REG|ONAL WATER MANAGEMENT (lRWiÐ IMPLEMENTATION GRANT<br />

PROGRAM AND EXECUTION OF AN AGREEMENT<br />

WITH THE CALIFORN¡A DEPARTiIENT OF WATER RESOURCES<br />

WHEREAS, organized in 2000, the Upper Mokelumne River <strong>Water</strong>shed Authority (UMRWA) is<br />

the approved Regional<strong>Water</strong> Management Group forthe Mokelumne/<strong>Amador</strong>/Galaveras IRWM<br />

Region; and,<br />

WHEREAS, the member agencies comprising the UMRWA are Alpine County <strong>Water</strong> <strong>Agency</strong>,<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>, Calaveras County <strong>Water</strong> District, Calaveras Public Utility District, East<br />

Bay Municipal Utility District, Jackson Valley lrrigation District, and the Counties of Alpine,<br />

<strong>Amador</strong> and Calaveras; and,<br />

WHEREAS, in 2006, the Mokelumne/<strong>Amador</strong>/Calaveras Region lntegrated Regional<strong>Water</strong><br />

Management Plan was adopted for the MAC Region; and,<br />

WHEREAS, in November 2006, Proposition 84: the Safe Drinking <strong>Water</strong>, <strong>Water</strong> Quality and<br />

Supply, Flood Control, River and Coast Protection Bond Act of 2006 passed by the vote of the<br />

people of California; and,<br />

WHEREAS, the intent of the IRWM lmplementation Grant Program is to provide funding for<br />

projects that support integrated water menagement planning and implementation; and,<br />

NOW, THEREFORE, BE lT RESOLVED that thís Board of Directors of the Upper Mokelumne<br />

River <strong>Water</strong>shed Authority hereby:<br />

1. Authorizes that application be made to the Califomia Department of <strong>Water</strong> Resources to<br />

obtain an lntegrated Regional<strong>Water</strong> Management lmplementation Grant pursuant to the<br />

Safe Drinking <strong>Water</strong>, <strong>Water</strong> Quality and Supply, Flood Control, River and Coastal Protection<br />

Bond Act of 2006 (Public Resource Code Section 75001 ef seg-); and,<br />

2. Authorizes the Executive Offìcer, upon the concurrence of Authority Counsel and on the<br />

condition there is no unauthorized fiscal impact on UMRWA, to execute an agreement on<br />

behalf of UMRWA with the Department of <strong>Water</strong> Resources upon award of grant funds.<br />

PASSED AND ADOPTED: Janu ary 28,2011 by ^!ro 0 vote of the Board of Dírectors.<br />

nn<br />

Kfullu--ct<br />

Rob Alcott, Executive Officer<br />

Upper Mokelumne River<br />

<strong>Water</strong>shed Authority


ærrc Mæting: Mardr 2Z 2Ot2 AGENDA TTEM 5.8.1<br />

STAFFREPORT<br />

Admi nistrative Pol icy Sectio n 2025<br />

Proposed Revisions<br />

Requested Action:<br />

Discussion and possible adoption of Resolution No. 2012-05, adopting recommended revisions to<br />

Administrative Policy Manual Section 2025-Board Meeting Agenda<br />

Backqround:<br />

The <strong>Water</strong> <strong>Agency</strong> has been receiving a much higher than normal number of requests for<br />

information, topics raised during the public comment period for items not on the agenda, and<br />

requests by the public members attending the Board meetings. ln order to better address agenda<br />

item requests, revisions to Policy 2025 have been proposed and discussed by the Policy<br />

Committee. The attached revisions are intended to provide guidelines that create a uniform<br />

process with adequate information for the <strong>Agency</strong> to review requests and schedule as<br />

appropriate.<br />

Fiscal Impact:<br />

Only a small amount of staff time to prepare a Agenda Request Form<br />

Reviewed bv Committee:<br />

Reviewed and recommended by the Policy Committee on March 15,2012<br />

Recommendation:<br />

Adoption of Resolution No.2012-05, Approval of the proposed revisions to Administrative Policy<br />

manual Section 2025.<br />

Prepared bv:<br />

Gene Mancebo, General Manager


RESOLUTION NO. 2012.05<br />

OF THE BOARD OF DIRECTORS OF THE AMADOR WATER AGENCY<br />

ADOPTING REVISIONS TO THE ADMINISTRATIVE POLICY MANUAL SECTION<br />

2025 BOARD MEETING AGENDA<br />

NOW, THEREFORE, BE lT RESOLVED that the Board of Directors of the <strong>Amador</strong><br />

<strong>Water</strong> <strong>Agency</strong> hereby adopts revisions to the Administrative Policy Manual Sections 2025<br />

as shown in Exhibit A.<br />

The foregoing resolution was duly passed and adopted by the Board of Directors of<br />

the <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> at a regular meeting held on this 22nd day of March, 2012 by<br />

the following vote:<br />

ATTEST:<br />

AYES:<br />

NOES:<br />

ABSENT:<br />

ABSTAIN:<br />

Signed and approved by me after its passage this 22nd day of March, 2012<br />

Cris L. Thompson<br />

Clerk of the Board of Directors<br />

Gary Thomas, President<br />

Board of Directors


t(ii t<br />

2025 BOARD MEETING AGENDA - DRAFT FOR EOARD MEETING<br />

2025.1 the General Manager, in cooperation with the Board President, shall prepare an<br />

agenda for each regular and special meeting of the Board of Directors. Any Director may<br />

call the General Manager and request any item to be placed on the agenda. Such request<br />

will be discussed with the Board President.<br />

2025.2 Any member of the public may request that a matter directly related to <strong>Agency</strong><br />

business be placed on the agenda of a regularly scheduled meeting of the Board of<br />

Directors, subject to the following conditions:<br />

2025.2.1 The request must be in writing and be submitted to the General Manager<br />

together with @n#nf,srn+atien@<br />

"|"."r.'turob"''[¡!Q]ryL<br />

als, and<br />

handouts.if any, at least ten seven business days prior to the date of the meeting;<br />

2025.2.2 The General Manager, in cooperation with the Board President, shall be<br />

e edireetly+elated{s<br />

Aqencv declines the request.<br />

l-\f .<br />

4- \\ ¡ |<br />

lrY<br />

em should<br />

itional information is needed, or if the<br />

2025.2.3 No matter which is legally a proper subject for consideration by the Board<br />

in closed session will be accepted underthis policy;<br />

2025.2.4 The Board of Directors may place limitations on the total time to be<br />

devoted to a public request issue at any meeting, and may limit the time allowed for<br />

any one person to speak on the issue at the meeting.<br />

20253 This policy does not prevent the Board from taking testimony at regular and special<br />

meetings of the Board on matters which are not on the agenda which a member of the<br />

public may wish to bring before the Board. However, the Board shall not discuss or take<br />

action on such matters at that meeting. Some Ina$et's mav be refened tS_ Ëggli!<br />

2025.4 At least 72 hours prior to the time of all regular meetings, an agenda, which includes<br />

but is not limited to all matters on which there may be discussion and/or action by the Board,<br />

shall be posted conspicuously for public review within the <strong>Agency</strong> offìce.<br />

2025.4.1 The agenda for a special meeting shall be posted at least 24 hours before<br />

the meeting in the same location.


Eoard Mætingt tlllarufr 2Z 2Ol2 AGENDA ITEilI 5,C,1 & 2<br />

siÍA FREFORT<br />

Audit Presentation br FiscalYear Ending June n,ZJ11<br />

Requested Action:<br />

Hear a presentation of the FY 20010-1 1 draft audit by Michael Zizzi with Leaf & Cole, accept<br />

the audit and direct the auditors to finalize the report.<br />

Background:<br />

Leaf & Cole has audited our balance sheets, related statements of revenues and<br />

expenses, and cash flows for the year ended June 30, 2011.<br />

Alternatives:<br />

N/A<br />

Fiscallmpact:<br />

None<br />

Reviewed bv Committee:<br />

No.<br />

Recommendation:<br />

Hear the presentation and direct the auditors to finalize the audit report.<br />

Prepared bv:<br />

Marvin Davis, Controller


Lea.f .Cole. LLP<br />

C eniJi e d P ub lir Aëco unt ønt t<br />

A Pnrtntrship of Pt'ofessinnøl Corporørions<br />

To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

12800 Ridge Road<br />

Sutter Creek, California 95685<br />

Steven W. Northcote, C.P.A.<br />

Michael S. Schreibman, C.P.A.<br />

Michael I. Zini, C.P.A,.<br />

Julie A. Firl, C.P.A.<br />

Nicholas ùf. Gines, C.P.A.<br />

ilI¿ntbør<br />

Amnicm Iwtimte of Califed Public Accountanß<br />

Cøliþniø SocierJ of Certifad Pttblic Accountønß<br />

We have audited the f,rnancial statements of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> for the year ended June 30,2011, andhave<br />

issued our report there on dated February 23,2012. Professional standards require that we provide you with the<br />

following information related to our audit.<br />

As stated in our engagement letter dated May 25,2011, our responsibility, as described by professional standards,<br />

is to express an opinion about whether the financial statements prepared by management with your oversight are<br />

fairly piesented, in all material respects, in conformity with U.S. generally accepted accounting principles.<br />

Because an audit is designed to provide reasonable, but not absolute, assurance and because we did not perform a<br />

detailed examination of all transactions, there is a risk that material misstatements may exist and not be detected<br />

by us. Our audit of the financial statements does not relieve you or management of your responsibilities.<br />

As part of our audit, we considered the internal control of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>. Such considerations were<br />

solely for the purpose of determining our audit procedures and not to provide any assurance concerning such<br />

internal control.<br />

As part of obtaining reasonable assurance about whether the fînancial statements are free of material<br />

misstatements, we performed tests of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>'s compliance with certain provisions of laws,<br />

regulations, contracts, and grants. However, the objective of our tests was not to provide an opinion on<br />

compliance with such provisions.<br />

Planned Scope and Timine of the Audit<br />

We performed the audit according to the planned scope and timing previously communicated to you in our<br />

discussion about planning matters.<br />

SienifÌcant Audit Findines<br />

S ígníJìc a nt Ac c o u ntin g Pol ìcies<br />

Management is responsible for the selection and use of appropriate accounting policies. The significant<br />

accounting policies used by <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> are described in Note I to the financial statements. No new<br />

accounting policies rvere adopted and the application of existing policies was not changed during the period' We<br />

noted no transactions entered into by the <strong>Agency</strong> during the year for which there is a lack of authoritative<br />

guidance or consensus. There are no sigrrificant Lransactions that have been recognized in the fina¡rcial statements<br />

in a different period than when the transactions occurred.<br />

2810 Camino Del Rio South, Suite 200, San Diego, Calilornia 92I08-3820<br />

6L9.294.7200, 619.294.7077 F'a-x, rwvw.leaf-cole.com, leattole@leal-cole.com


To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

Mønagement Judgments und Accountìng Estímates<br />

Page2<br />

Accounting estimates are an integral part of the financial statements prepared by management and are based on<br />

management's knowledge and experience about past and current events and assumptions about future events.<br />

Certain accounting estimates are particularly sensitive because of their significance to the financial statements and<br />

because of the possibility that future events affecting them may differ significantly from those expected. The<br />

most sensitive estimates affecting the financial statements were:<br />

. The useful lives assigned to capital assets have been estimated based on the intended use.<br />

. Management has represented no circumstances indicating the carrying value of the longJived assets was<br />

impaired.<br />

. The allowance for doubtful accounts has been estimated based on past experience and on an analysis of<br />

current receivable and inventory balances.<br />

. The fair value of investments are reported to the <strong>Agency</strong> on the valuation methodologies deemed appropriate<br />

by the firnd managers. The <strong>Agency</strong> reviews and evaluates the values provided by fund managers.<br />

'<br />

The Due from the City of Plymouth balance at June 30, 2011 is based on management's best estimate of the<br />

Cify of Plirmouth's percentage of costs to pay for the <strong>Agency</strong>'s Tanner <strong>Water</strong> Treatrnent Plant to the City of<br />

Plymouth Pipeline Proj ect.<br />

Finsncìøl Stutement Dísclosures<br />

The disclosures in the financial statements are neuttal, consistent, and clear. Certain financial statement<br />

disclosures may be particularly sensitive because of their significance to financial statement users. The most<br />

sensitive disclosures affecting the financial statements were:<br />

. Cash and lnvestments (Note 2)<br />

. Restricted Assets (Note 3)<br />

' Capital Assets (Note 5)<br />

. Long-Term Debt (Note 6)<br />

Dfficultìes Encountered ìn Performíng the Audit<br />

We encountered no significant difficulties in dealing with management in performing and completing our audit.<br />

Corrected and Uncorrected Mìsststements<br />

Professional standards require us to accumulate all known and likely misstatements identified during the audit,<br />

other than those that are trivial, and communicate them to the appropriate level of management.<br />

. The attached schedule of misstatements detected as a result of audit procedures were corrected by<br />

management.


To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

Dísagre em ents llìth Man øgem e nt<br />

Page 3<br />

For purposes of this letter, professional standards define a disagreement with management as a financial<br />

accounting, reporting, or auditing matter, whether or not resolved to our satisfaction, that could be significant to<br />

the financial statements or the auditor's report. We are pleased to report that no such disagreement arose during<br />

the course ofour audit.<br />

Mønageme nt Represe ntøtìons<br />

We have requested certain representations from management that are included in the management representation<br />

letter dated February 23,2012.<br />

Mønøgement Consultstio ns lltìth Other Independent Accountønts<br />

ln some cases, management may decide to consult with other accountants about auditing and accounting matters,<br />

similar to obtaining a "second opinion" on certain siluations, If a consultation involves application of an<br />

accounting principal to the <strong>Agency</strong>'s financial statements or a determination of the type of auditor's opinion that<br />

may be expressed on those statements, our professional standards require the consulting accountant to check with<br />

us to determine that the consultant has all the relevant facts. To our knowledge, there were no such consultations<br />

with other accountants.<br />

Other Audìt Findìngs or Issues<br />

We generally discuss a variety of matters, including the application of accounting principles and auditing<br />

standards, with management each year prior to retention as the <strong>Agency</strong>'s auditors. However, these discussions<br />

occurred in the normal course of our professional relationship and our responses were not a condition to our<br />

retention.<br />

This information is intended solely for the use of the Board of Directors and management of <strong>Amador</strong> '<strong>Water</strong><br />

<strong>Agency</strong> and is not intended to be and should not be used by anyone other than these specified parties.<br />

>utf4Colol-l-P<br />

San Diego, California<br />

February 23,2012


Leaf '-Cole, LLP<br />

C ertifu cl P ub lic Acc otmt nnts<br />

A, Pørtnership of Profesitnøl Cmpornrions<br />

To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

12800 Ridge Road<br />

Sutter Creek. Califomia 95685<br />

Steven !V. Northcote, C.P.A.<br />

Michael S. Schreibman, C.P.A.<br />

Michael l. Zizzí, C.P .Ã.<br />

futie A. Firt, C.P.A.<br />

Nicholas M. Gines, C.P.A.<br />

Menbn¡<br />

Ann ietn Instin *e of Cenifwd h tblic Accot mtønts<br />

Ca.liþnia Sociztl of Cettifed hrblíc Accotntmts<br />

¡r planning and performing out audit of the financial statements of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> for the year ended June<br />

30,2011, we considered <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>'s internal control over financial reporting (intemal control) as a<br />

basis for designing our auditing procedures for the purpose of expressing an opinion on the financial statements,<br />

but not for the purpose of expressing an opinion on the effectiveness of the <strong>Agency</strong>'s internal control.<br />

However, during our audit we became aware of matters that are opporfunities for strengthening internal controls,<br />

improving operating efficiency and reducing expenses. The memorandum that accompanies this letter<br />

summarizes our coÍìments and recommendations regarding those matters. This letter does not affect our report<br />

dated February 23,2012, on the financial statements of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>.<br />

We will review the stalus of these com.ments during our next audit engagement. We have already discussed these<br />

comments and recommendations with various <strong>Agency</strong> personnel, and we will be pleased to discuss them in<br />

further detail at your convenience, to perform any additional study of these matters, or to assist you in<br />

implementing the recommendation.<br />

1a,a¡f4colo l-l-F<br />

San Diego, California<br />

February 23,2012<br />

28l0 Camino Det Rio South, Suite 200, San Diego, C:rlifornia 92108-3820<br />

619.294.7200, 6L9.294.7077 Êax, www.leaf-cole.com, leafcole@leal-cole.com


Bank Reconciliations<br />

AMADOR WATER AGENCY<br />

MEMORANDI'M<br />

The bank accounts of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> have not been truly reconciled. The <strong>Agency</strong>'s cash is cunently<br />

pooled in the general ledger. The total cash in the general ledger across all accounts and funds is then compared<br />

to the cash in investments in all of the <strong>Agency</strong>'s accounts'<br />

The reconciliations each month have included a small unidentif,red difference (less than $50). If the cash was<br />

truly reconciled, there would be no difference. If the cash is not completely reconciled, one can never be sure that<br />

there is one etïor, or multiple errors offsetting each other thus leaving only a small difference. If all other items<br />

have been recorded properly, the unidentified difference would be the same from month to month. This has not<br />

been the case.<br />

We suggest that the accounts in the general ledger not be pooled. Rather, each bank or similar account of the<br />

<strong>Agency</strong> should be represented in the general ledger by a specific set of accounts. This will allow cash in a single<br />

bank account to be spread across several funds. The reconciliation process would be simplified by allowing the<br />

reconciler to identifu which accounts specifically are "in-balance" and which accounts are "out of balance"' This<br />

should make identifuing differences between the activity in the bank accounts and the general ledger accounts<br />

easier. The reconciliation of cash is one of the strongest internal controls at our disposal for assuring that all<br />

transactions involving cash receipts and disbursements have been recorded'


AMADOR WATER AGENCY<br />

FINANCIAL STATEMENTS<br />

JUNE 30.2011 AND 2010<br />

Leaf eCole, LLP<br />

Cntifecl Publb Accountt tttt


Independent Auditor' s RePort<br />

Management's Discussion and Anaþis<br />

Statements of Net Assets<br />

AMADOR WATER AGENCY<br />

FINA¡ICIAL STATEMENTS<br />

JUNE 30,2011AI\D 2010<br />

TABLE OF CONTENTS<br />

Statements of Revenues, Expenses and Changes in Net Assets<br />

Statements of Cash Flows<br />

Notes to Financial Statements<br />

Supplementary Schedules :<br />

Schedule of Net Assets by Rate Area<br />

schedule of Revenues, Expenses and changes in Net Assets by Rate Area<br />

Page<br />

t-2<br />

8-9<br />

10<br />

lt-t2<br />

13-30<br />

3t -32<br />

JJ


Leaf ¿,Cole. LLP<br />

C ertif.e rt P uh lic Ac c o¡tn tø'ntt<br />

A P øtnersbip of Profersiûltøl Clrporßtionr<br />

To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> AgencY<br />

12800 Ridge Road<br />

Sutter Creek. California 95685<br />

Independent Auditor's RePort<br />

Steven W. Northcote, C.P.A.<br />

ùlichael S. Schreibman, C.P.A.<br />

Nlichael l. Zizzi, C.P. 4..<br />

|ulie A. Fir[, C.P.A.<br />

Nicholas M. Gines, C.P.A.<br />

Meubns<br />

Aflericøn Inttitutte 0f Certifed húlic tlccoroxønt<br />

Caliþmiø Societl of Certif.etl Public Acclilntønts<br />

We have audited the accompanying statement of net assets of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> as of June 30,20 ll<br />

and 2010, and the related statements ofrevenues, expenses and changes in net assets and cash flows for the years<br />

then ended. These financial statements are the responsibilily of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong>'s management. Our<br />

responsibility is to express an opinion on these financial statements based on our audits.<br />

We conducted ow audits in accordance with auditing standards generally accepted in the United States of America<br />

and the standards applicable to financial audits contained in Government Auditing Standards issued by the<br />

Comptroller General of the United States and the State Controller's Minimum Audit Requirements for Califomia<br />

Special Districts. Those standards require that we plan and perform the audits to obtain reasonable assurance about<br />

whether the hnancial statements are free of material misstatement. An audit includes examining, on a test basis,<br />

evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the<br />

accounting principlis used and the significant estimates made by management, as well as evaluating the overall<br />

financial siatements presentation. We believe that our audits provide a reasonable basis for our opinion.<br />

In our opinion, the financial statements refened to above present fairly, in all material respects, the financial<br />

position ãf n-udor <strong>Water</strong> <strong>Agency</strong> as of June 30, 2011 and 2010, and the changes in its net assets and cash flows<br />

ior the years then ended in conformity with accounting principles generally accepted in the United States of<br />

America and the State Controller's Minimum Audit Requirements for California Special Districts.<br />

Accounting principles generally accepted in the United States of America require that management's discussion<br />

and analysis on pìg"r 3 through 7 be presented to supplement the financial statements. Such information,<br />

although not a part of the financial statements, is required by the Governmental Accounting Standards Board, who<br />

considérs it to be an essential part of financial reporting for placing the financial statements in an appropriate<br />

operational, economic, or historical context. We have applied certain limited procedures to the required<br />

supplementary information in accordance with auditing standards generally accepted in the United States of<br />

n-L¡.u, which consisted of inquiries of management about the methods of preparing the information and<br />

comparing the information for consistency with management's responses to our inquiries, the f,rnancial<br />

staternenti, and other knowledge we obtained during our audit of the financial statement. We do not express an<br />

opinion or provide any assurance on lhe information because the limited procedures do not provide us with<br />

sufficient evidence to express an opinion or provide any assurance'<br />

2810 Camino Det Rio Sourh, Suite Zô0, S"n Diego, California 92I08-3820<br />

619.2947200,619.294,7077 [ax, www.lea[-cole.com, leafcole@lea[-cole .com


To the Board of Directors<br />

<strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

Page2<br />

Our audits were conducted for the purpose of forming an opinion on the financial statements as a whole. The<br />

supplementary schedule of net assets by rate area and the supplementary schedule of revenues, expenses and<br />

changes in net assets by rate area as of and for the year ended June 30, 2011 are presented for pu4toses of<br />

additional analysis and are not a required part of the financial statements. The supplementary schedule of net<br />

assets by rate area and the supplementary schedule ofrevenues, expenses and changes in net assets by rate area<br />

are the responsibilify of management and were derived from and relate directly to the underlying accounting and<br />

other records used to prepare the financial statements. The information has been subjected to the underlying<br />

accounting and other records used to prepare the financial statements. The information has been subjected to the<br />

auditing procedures applied in the audit of the financial statements and certain additional procedures, including<br />

comparing and reconciling such information directly to the underlying accounting and other records used to<br />

prepare the financial statements or to the financial statements themselves and other additional procedures in<br />

accordance with auditing standards generally accepted in the United States of America. In our opinion, the<br />

information is fairly stated in all material respects in relation to the financial statements as a whole.<br />

çç¡if4colo L-l-f<br />

San Diego, Califomia<br />

February 23,2012


MANAGEMENT'S DISCUSSION AND ANALYSIS<br />

Our discussion and analysis of the financial performance of <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> (the "<strong>Agency</strong>") provides an<br />

overview of the <strong>Agency</strong>'s financial activities for the year ended June 30, 201 L Please read it in conjunction with<br />

the <strong>Agency</strong>'s financial statements, which follow this section.<br />

Financial Statements<br />

This discussion and analysis provides an introduction and a brief description of the <strong>Agency</strong>'s financial statements,<br />

including the relationship of the statements to each other and the significant differences in the information they<br />

provide. The <strong>Agency</strong>'s fltnancial statements include four components:<br />

. Statement of Net Assets<br />

' Statement of Revenues, Expenses and Changes in Net Assets<br />

' Statement of Cash Flows<br />

. Notes to the Financial Statements.<br />

The statement of net assets includes all the <strong>Agency</strong>'s assets and liabilities, with the difference between the two<br />

reported as net assets. Net assets may be displayed in the categories:<br />

. Invested in Capital Assets, Net of Related Debt<br />

. Restricted Net Assets<br />

. Unrestricted Net Assets<br />

The statement of net assets provides the basis for computing rate of retum, evaluating the capital structure of the<br />

<strong>Agency</strong> and assessing the liquidity and financial flexibility of the <strong>Agency</strong>.<br />

The statement of revenues, expenses and changes in net assets presents information which shows how the<br />

<strong>Agency</strong>'s net assets changed during the year. All ofthe current year's revenues and expenses are recorded when<br />

the underlying transaction occurs, regardless of the timing of the related cash flows. The statement of revenues,<br />

expenses and changes in net assets measures the success of the <strong>Agency</strong>'s operations over the past year and<br />

determines whether the <strong>Agency</strong> has recovered its costs through user fees and other charges.<br />

The statement of cash flows provides information regarding the <strong>Agency</strong>'s cash receipts and cash disbursements<br />

during the year. This statement may report cash activity in four categories:<br />

. Operations<br />

. Noncapital financing<br />

. Capital and related financing<br />

. Investing<br />

This statement differs from the statement of revenues, expenses and changes in net assets because the statement<br />

accounts only for transactions that result in cash receipts or cash disbursements.<br />

The notes to the financial statements provide a description of the accounting policies used to prepare the financial<br />

statements and present material disclosures required by generally accepted accounting principles that are not<br />

otherwise present in the financial statements.


Financial Hiehliehts<br />

MA¡IAGEMENT'S DISCUSSION AND ANALYSIS<br />

The <strong>Agency</strong>'s net assets decreased by 54,275,838, or 6.42 percent, during the year ended June 30, 20ll' The<br />

<strong>Agency</strong>'s operating revenues decreased 5t24,163 while operating expenses increased 51,262,159. Nonoperating<br />

revenues over expenses increased 5396,1,&. Capital contributions of $107,959 for the year ended June 30,2011<br />

were $4,343,606 less than the prior year as a result of contributions related to the Plymouth pipeline in the prior year.<br />

Financial Analvsis of the Financial Statements<br />

Net Assets<br />

The following is a summary of the <strong>Agency</strong>'s statement of net assets:<br />

Assets:<br />

Current assets<br />

Noncurrent Assets:<br />

Restricted assets<br />

Due from the City of Plymouth<br />

Capital assets<br />

Deferred bond costs<br />

Total Assets<br />

Liabilities:<br />

Current liabilities<br />

Noncurrent liabilities<br />

Total Liabilities<br />

Net Assets:<br />

lnvested in capital assets, net of<br />

related debt<br />

Restricted<br />

Unrestricted<br />

Total Net Assets<br />

June 30,<br />

20tl<br />

$ 2,691,870<br />

36,001<br />

3,205,519<br />

94,431,134<br />

237,129<br />

100,601,653<br />

1,956,853<br />

36,357,435<br />

38,314,288<br />

June 30,<br />

2010<br />

s 3,421,826<br />

79,329<br />

3,241,429<br />

97,907,726<br />

250,122<br />

104,900,432<br />

2,409,564<br />

35,927,665<br />

38,337,229<br />

Dollar<br />

Chanse<br />

s (729,956)<br />

(43,328)<br />

(35,910)<br />

(3,476,592)<br />

(12,993)<br />

___g2e8llÐ<br />

(452,711)<br />

429,770<br />

_____@plÐ_<br />

58,268,976 6r,008,257 (2,739,281)<br />

36,001 63,090 (27,089)<br />

3,982,388 5,491,856 (1,509,468)<br />

s 62,287,365 S 66,563,203 $ (4,275,838)<br />

+::<br />

Percentage<br />

Change<br />

(21.33)<br />

(s4.62)<br />

(1.11)<br />

(3.ss)<br />

(s.1e)<br />

(4.10)<br />

(18.7e)<br />

t.20<br />

(0.06)<br />

(4.4e)<br />

(42.e4)<br />

(27.4e)<br />

(6.42)<br />

As you can see from the table above, net assets decreased 54,275,838 from fiscal year 2010 to 2011. Looking<br />

moie carefully, you will note 640/o of the change was in capital assets, net of related debt, which decreased<br />

52,j39,281. This decrease is the result of depreciation expense exceeding capital asset additions and principal<br />

payments on long-term debt.<br />

Restricted net assets decreased 27 ,089 from fiscal year 20 l0 to 20 1 I .<br />

Unrestricted net assets (those that can be used to finance dayto-day operations) decreased $1,509,468 due to<br />

assets being used to fund capital acquisitions and pay-down long-term debt.


MANAGEMENT'S DISCUSSION AND ANALYSIS<br />

Financial Analvsis of the Financial Statements (Continued)<br />

Revenues. Expenses and Changes in Net Assets<br />

The following is a summary of the <strong>Agency</strong>'s revenues, expenses and changes<br />

June 30, 20 I 1 and June 30, 20 10, respectively:<br />

Operating revenues<br />

Nonoperating revenues<br />

Total Revenues<br />

Depreciation expense<br />

Other operating expense<br />

Nonoperating expense<br />

Total Expenses<br />

Capital contributions<br />

Change in Net Assets<br />

Net Assets at Beginning of Year<br />

Net Assets at End of Year<br />

A closer examination of the source of changes in net assets reveals that the <strong>Agency</strong>'s operating revenues decreased<br />

S124,163 in fiscal year 20lI as a result of a reduction in outside service contracts, which are driven by development<br />

in the area. Nonoperating revenues increased $411,485 in fiscal year 2011 due to increased participation fees and<br />

new grant r"rr"nrei. Operating costs exclusive of depreciation increased $1,012,149 due to write-offs of grants and<br />

miscellaneous receivables in the current year, as well as less salaries and benefits being capitalizedandpurchases of<br />

additional sewer capacity.<br />

Capital Assets<br />

Capital assets consist of the following at June 30,2011 and June 30,2010, respectively:<br />

Capital Assets Not Beins Depreciated:<br />

Land<br />

Construction in progress<br />

Total Capital Assets Not<br />

Being Depreciated<br />

(Continued)<br />

June 30,<br />

20lr<br />

s 8,657,972 $<br />

1,344,350<br />

10,002,322<br />

3,770,544<br />

8,961,445<br />

1,654,130<br />

14,3 86, I l9<br />

107,959<br />

(4,275,838)<br />

66,563,203<br />

s 62,287,365<br />

June 30,<br />

201 I<br />

June 30,<br />

2010<br />

8,782,135<br />

932,864<br />

9,714,999<br />

3,549,285<br />

7,920,545<br />

1,669,452<br />

13,r39,282<br />

4,451,565<br />

1,027,282<br />

65,535,921<br />

L_@L<br />

June 30,<br />

2010<br />

in net assets for the years ended<br />

Dollar<br />

Chanse<br />

$ (124,163)<br />

411,486<br />

287,323<br />

221,259<br />

1,040,900<br />

(15,322)<br />

1,246,837<br />

(4,343,606)<br />

(5,305,120)<br />

1,027,282<br />

$___(4,275ËÐ<br />

Dollar<br />

Chanse<br />

s 3,482,326 S 3,482,326 $<br />

4,483,913 5,064,514 (580,601)<br />

7,966,239 8,546,840 (580,601)<br />

Percentage<br />

Change<br />

(1.41)<br />

44.1t<br />

2.96<br />

6.23<br />

t3.t4<br />

(0.e2)<br />

9.49<br />

(e7.s7)<br />

(s16.23)<br />

l.) /<br />

(6.42)<br />

Percentage<br />

Chanse<br />

(r 1.46)<br />

(6.7e)


MANAGEMENT'S DISCUSSION AND ANALYSIS<br />

Financial Analvsis of the Financial Statements (Continued)<br />

Capital Assets (Continued)<br />

June 30,<br />

20ll<br />

Capital Assets Beins DePreciated:<br />

Utility plant 10,783,477<br />

Source ofsuppty 1,640,586<br />

Pumping plant 670,116<br />

Treatrnent plant 23,206,265<br />

Transmission and distribution 72,341,749<br />

General plant 10,712,831<br />

Total Capital Assets Being<br />

Depreciated<br />

Less: Accumulated DePreciation<br />

Net Capital Assets<br />

Being Depreciated<br />

Net Capital Assets<br />

June 30,<br />

2010<br />

10,783,477<br />

1,640,586<br />

670,116<br />

22,787,356<br />

7 1,886,105<br />

10,712,831<br />

118,480,471<br />

(29,119,585)<br />

Dollar<br />

Chanee<br />

Percentage<br />

Chanse<br />

41s,eo; 1.8;<br />

455,644 0.63<br />

874,553 0.74<br />

(3,770,s4) (r29s)<br />

89,360,886 (2,895,991) (3.24)<br />

s_e4,ß1,ß4 S__2êyf4_ $____g,q2lf9Ð.<br />

The net additions to capital assets for fiscal year 2011 totaled $874,553. Capital asset additions included the<br />

Gayla Manor Leachfielã, the Backwash line upgrade, the Tanner Hypalon Clearwell replacement and the work<br />

done at Last Chance AlleY.<br />

Lons-Term Debt<br />

The following is a summary of long-term debt at June 30, 2011 and June 30, 2010, respectively:<br />

June 30. June 30,<br />

20tt 2010<br />

Certificates of participation $ 22,010,000 S 22,495,000<br />

Notes payable 13,337,104 13,580,195<br />

35,347,104 36,075,195<br />

Total<br />

Unamortized discount and premium 404,931 421,292<br />

Deferred amount on refunding (35,705) (42,846)<br />

Total Long-Term Debt 35,716,330 36,453,641<br />

Less: Current portion 752,275 1'628,085<br />

Dollar<br />

Chanee<br />

s 34.964.055 $ 34,825,556 $ 138,499<br />

4-:<br />

(2,e6)<br />

Percentage<br />

Change<br />

$ (48s,000) (0.02)<br />

(243,091) (0.02)<br />

(728,09t) (0.02)<br />

( 16,361) (0.04)<br />

7,141 0.17<br />

(737,3r1) (0.02)<br />

875,810<br />

The <strong>Agency</strong> reduced its debt outstanding by $737,311 during the year ended June 30, 2011' No new long-term<br />

debt has been issued.


Economic Factors and Budeet<br />

MANAGEMENT'S DISCUSSION AND ANALYSIS<br />

The <strong>Agency</strong>'s Board of Directors and management consider many factors when setting the fiscal year budget. The<br />

<strong>Agency</strong> has a number of capital improvement projects appropriated for the year ended June 30, 2012, including the<br />

CAWP Gravity Supply Line design and construction, the AWS Ione Treatment Plant expansion and the Broad Street<br />

<strong>Water</strong>line relocation. The <strong>Agency</strong>'s Capital Improvement Program for the year ended June 30, 2012 is 52,070,171<br />

which is a decrease from the prior year. The <strong>Agency</strong>'s total operating budget for the year ended June 30, 2012 is<br />

511,715,226, which is an increase compared to the adopted operating budget for the year ended June 30, 2011, to<br />

allow for the <strong>Agency</strong> to meet its current obligations on loan payments and post-employment benefit payments.<br />

Below is a historical look at water production and customer accounts by service area as of and for the years ended<br />

June 30:<br />

<strong>Water</strong> ProductÍon (000 Gals):<br />

Tanner Plant<br />

Ione Plant<br />

Buckhorn Plant<br />

Lake Comanche Plant<br />

La Mel Heights Plant<br />

Total Production<br />

Customer Accounts:<br />

<strong>Water</strong> Connections:<br />

<strong>Amador</strong> <strong>Water</strong> System<br />

Cawp Retail<br />

ID #7 - Lake Comanche<br />

ID #3 - La Mel<br />

Total <strong>Water</strong> Connections<br />

Wastewater Connections:<br />

Lake Comanche (Users)<br />

Wastewater (Users)<br />

Martell Areas<br />

Wastewater (Standby)<br />

Total Wastewater Customers<br />

Total Customers<br />

Contactins the District's Financial Manaser<br />

20n<br />

752,838<br />

477,885<br />

294,653<br />

95,697<br />

5,496<br />

1,626,569<br />

2010<br />

706,501<br />

482,949<br />

326,141<br />

89,392<br />

5,580<br />

1,610,563<br />

2009<br />

774,394<br />

505,756<br />

334,038<br />

93,691<br />

6,505<br />

1,714,394<br />

2008<br />

843,525<br />

529,787<br />

354,773<br />

100,754<br />

7,002<br />

1,835,841<br />

3,594<br />

3,534<br />

3,510<br />

3,485<br />

2,628<br />

2,626<br />

2,626<br />

2,630<br />

731<br />

728<br />

738<br />

735<br />

58<br />

58<br />

59<br />

59<br />

'7,011 6,946 6,933 6,909<br />

342<br />

303<br />

178<br />

103<br />

926<br />

366<br />

304<br />

t79<br />

849<br />

371<br />

304<br />

r79<br />

854<br />

370<br />

299<br />

t74<br />

107<br />

982<br />

7,937 7,795 7,787 7,859<br />

This financial report is designed to provide our citizens, customers, investors, and creditors with a general<br />

overview of the <strong>Agency</strong>'s finances and to demonstrate the <strong>Agency</strong>'s accountabilily for the money it receives. If<br />

you have questions about this report or need additional financial information, contact the <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong><br />

at (209) 223-3018.


Current Assets: (Notes l, 2 and 4)<br />

Cash and cash equivalents<br />

Investments<br />

Accounts receivable, net:<br />

Current services<br />

Other<br />

Taxes<br />

Grants receivable<br />

Accrued interest receivable<br />

Current portion due from the City of Plymouth<br />

lnventory<br />

Prepaid expenses<br />

Total Current Assets<br />

Noncurrent Assets:<br />

Restricted Assets: (Notes 1,2 and3)<br />

Cash and cash equivalents<br />

Total Restricted Assets<br />

Capital Assets: (Notes 1, 5 and 6)<br />

Other Assets: (Notes I and 4)<br />

Due from City of Plymouth, less<br />

current portion above<br />

Defened bond costs<br />

Total Other Assets<br />

TOTAL ASSETS<br />

(Continued)<br />

Total Noncurrent Assets<br />

AMADOR WATER AGENCY<br />

STATEMENTS OF NET ASSETS<br />

JUNE 30,2011 A¡ID 2010<br />

ASSETS<br />

The accompanyrng notes are an integral part of the financial statements.<br />

20ll<br />

461,321<br />

t21,290<br />

1,427,r94<br />

305,011<br />

11,011<br />

55,984<br />

437<br />

35,910<br />

217,588<br />

56,124<br />

2,691,870<br />

36,001<br />

36,001<br />

94,43r,134<br />

3,205,519<br />

237,129<br />

3,442,648<br />

97,909,783<br />

s 100,601,653<br />

$<br />

20t0<br />

301,846<br />

220,000<br />

1,288,793<br />

361,674<br />

I 1,175<br />

1,006,998<br />

169<br />

32,905<br />

134,897<br />

63,369<br />

3,421,826<br />

79,329<br />

79,329<br />

97,907,726<br />

3,24r,429<br />

250,122<br />

3,49r,55r<br />

101,478,606


Current Liabilities: (Notes I and 6)<br />

Accounts payable<br />

Deposits<br />

Accrued interest payable<br />

Other payables<br />

Current portion oflong-term debt<br />

Total Current Liabilities<br />

AIMADOR WATER AGENCY<br />

STATEMENTS OF NET ASSETS (CONTINUED)<br />

JIINE 30,2011AND 2010<br />

LIABILITIES AND FITIID EQUITY<br />

Noncurrent Liabilities:<br />

Long-Term Debt: (Notes I and 6)<br />

Certificates of participation, net of current portion<br />

Notes payable, net of current portion<br />

Total Long-Term Debt<br />

Other Noncurrent Liabilities: (Notes 1, 7 and 9)<br />

Caltrans advance<br />

Compensated absences<br />

Net OPEB obligation<br />

Total Other Noncurrent Liabilities<br />

Total Noncurrent Liabilities<br />

Total Liabilities<br />

Commitments and Contingencies (Notes 8, 9 and 10)<br />

Net Assets: (Note 12)<br />

lnvested in capital assets, net ofrelated debt<br />

Restricted for debt service<br />

Unrestricted<br />

Total Net Assets<br />

TOTAL LIABILITIES A.t\D NET ASSETS<br />

The accompanying notes are an integral part of the financial statements.<br />

$<br />

20tr<br />

837,932<br />

96,763<br />

188,766<br />

81,117<br />

752,275<br />

1,956,853<br />

21,874,226<br />

13,089,829<br />

34,964,055<br />

445,828<br />

230,508<br />

7t7,044<br />

1,393,380<br />

36,357,435<br />

38,314,288<br />

2010<br />

8 454,209<br />

80,849<br />

175,291<br />

7r,130<br />

1,628,085<br />

2,409,564<br />

22,388,446<br />

12,437,1r0<br />

34,825,556<br />

445,828<br />

285,615<br />

370,666<br />

1,102,109<br />

35,927,665<br />

38,337,229<br />

61,008,257<br />

63,090<br />

5,491,856<br />

66,563,203<br />

$ 104,900,432


AMADOR WATER AGENCY<br />

STATEMENTS OF REVENUES, EXPENSES AND CHANGES IN NET ASSETS<br />

FORTHE YEARS ENDED JUNE 30' 2011AND 2O1O<br />

Ooerating Revenues:<br />

Current services<br />

Other revenues<br />

Total Operating Revenues<br />

Ooerating Expenses:<br />

General and administrative<br />

Depreciation<br />

Transmission and distribution<br />

Maintenance<br />

Engineering<br />

Source ofsupply<br />

<strong>Water</strong> treatment<br />

Total Operating ExPenses<br />

Operating (Loss)<br />

Nonoperating Revenues and (Expenses):<br />

Participation fees<br />

Taxes and assessments<br />

Other nonoperating revenue<br />

lnvestment income earned<br />

Grant revenue<br />

Amortization<br />

Interest expense<br />

Total Nonoperating Revenues (Expenses)<br />

(Loss) Before capital contributions<br />

Capital Contributions<br />

Change in net assets<br />

Net Assets at Beginning of Year<br />

NET ASSETS AT END OF YEAR<br />

The accompanying notes are an integral part of the financial statements.<br />

10<br />

20tl<br />

s 7,962,389<br />

695,583<br />

8,657,972<br />

3,989,518<br />

3,770,544<br />

1,239,563<br />

2,063,004<br />

367,416<br />

729,476<br />

572,468<br />

12,731,989<br />

(4,074,017)<br />

410,886<br />

489,992<br />

168,692<br />

156,730<br />

1 18,050<br />

(12,993)<br />

(1,641,137)<br />

(309,780)<br />

(4,383,797)<br />

107,959<br />

(4,275,838)<br />

66,563,203<br />

s 62,287,365<br />

2010<br />

s 7,979,003<br />

803,132<br />

8,782,735<br />

3,756,048<br />

3,549,295<br />

r,276,261<br />

1,510,604<br />

394,761<br />

717,690<br />

(2,687,695)<br />

246,945<br />

471,727<br />

100,544<br />

113,748<br />

(t2,994)<br />

(1,656,458)<br />

(736,588)<br />

(3,424,283)<br />

4,451,565<br />

1,027,282<br />

65,535,921<br />

s 66,563,203


Cash Flows From Operating Activities:<br />

Cash received from customers<br />

Cash payments to suppliers for goods and services<br />

Cash payments to employees for services<br />

Net Cash Provided by Operating Activities<br />

AJVIADOR \ryATER AGENCY<br />

STATEMENTS OF CASH FLOWS<br />

FORTHE YEARS ENDED JLTNE 30,201.1AND 2O1O<br />

Cash Flows From Noncapital and Related Financine Activities:<br />

Receipts from taxes, assessments and other nonoperating income<br />

Net Cash Provided by Noncapital and Related<br />

Financing Activities<br />

Cash Flows From Capital and Related Financins Activities:<br />

Acquisition and construction of capital assets<br />

Proceeds from long-term debt<br />

Proceeds from grant revenues<br />

Proceeds from participation fees<br />

Principal paid on long-term debt<br />

lnterest paid on longterm debt<br />

Contributed capital<br />

Net Cash Used in Capital and Related Financing Activities<br />

Cash Flows From Investins Activities:<br />

Purchase of investments<br />

Proceeds from sale or maturity of investments<br />

Payments received on Due from City of Plymouth<br />

lnvestment income<br />

Net Cash Provided by lnvesting Activities<br />

Net lncrease (Decrease) in Cash and Cash Equivalents<br />

Cash and Cash Equivalents at Beginning of Year<br />

CASH AND CASH EQUIVALENTS AT END OF YEAR<br />

Cash and Cash Equivalents:<br />

Financial Statement Classification:<br />

Cash and cash equivalents<br />

Restricted cash and cash equivalents<br />

Total Cash and Cash Equivalents<br />

(Continued)<br />

The accompanying notes are an integral part of the financial statements.<br />

1l<br />

20lr<br />

8,542,824<br />

(5,054,905)<br />

(3,116,295)<br />

371,624<br />

658,848<br />

658,848<br />

(l 85,993)<br />

937,678<br />

410,886<br />

(728,091)<br />

(1,636,882)<br />

(1,202,402)<br />

(121,290)<br />

220,000<br />

32,905<br />

156,462<br />

288,077<br />

tl6,t47<br />

381,175<br />

S 497,322<br />

461,321<br />

36,001<br />

s 497,322<br />

2010<br />

8,691,160<br />

(4,839,726)<br />

(3,543,555)<br />

307,879<br />

57 r,638<br />

57t,638<br />

(6,571,495)<br />

1,900,000<br />

147,828<br />

246,845<br />

(852,668)<br />

(1,680,1 l4)<br />

3,317,290<br />

(220,000)<br />

1,155,150<br />

32,905<br />

r16,043<br />

1,084,098<br />

(1,528,699)<br />

1,909,874<br />

$ 381,175<br />

301,846<br />

79,329<br />

$ 381,175


AMADOR WATER AGENCY<br />

STATEMENTS OF CASH FLOWS (CONTTNUED)<br />

FORTHE YEARS ENDED JUNE 3O,2OII AND 2O1O<br />

Reconciliation of Operating (Loss) to Net Cash<br />

Provided bv Onerating Acti\rities:<br />

Operating (loss)<br />

Adjustments to reconcile operatÍng loss to net<br />

cash provided by operating activities:<br />

Depreciation<br />

Bad debts - Grants receivable<br />

lncrease in allowance for doubtful accounts<br />

fncrease (Decrease) in:<br />

Accounts receivable - current services<br />

Accounts receivable - other<br />

Inventory<br />

Prepaid expenses<br />

Accounts payable<br />

Deposits<br />

Other payables<br />

Compensated absences<br />

Net OPEB obligation<br />

Net Cash Provided by Operating Activities<br />

Sunplemental Disclosure of Cash Flow fnformation<br />

Contribution of capital assets<br />

Amortization of defened amount on refunding<br />

The accompanying notes are an integral part of the financial statements.<br />

t2<br />

20tr<br />

8 (4,074,017)<br />

s@<br />

$<br />

$<br />

3,770,544<br />

131,386<br />

49,324<br />

(138,401)<br />

7,339<br />

(82,691)<br />

7,245<br />

383,723<br />

15,914<br />

9,987<br />

(55,107)<br />

346,378<br />

2010<br />

s (2,687,695)<br />

$<br />

3,549,285


AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JIJNE 30.2011 AND 2O1O<br />

Note 1 - Orsanization and Significant Accountins Policies:<br />

Organization<br />

The <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> (<strong>Agency</strong>) was formed under an act of the Legislature of the State of Califomia,<br />

Chapter 2137, Assembly Bill No., 2629, approved by the governor on July 18, 1959. The <strong>Agency</strong>'s territory<br />

of authority consists of <strong>Amador</strong> County. The <strong>Agency</strong> has the power to do any and every lawful act necessary<br />

in order that sufficient water may be available for any present or fulure beneficial use or uses of the lands or<br />

inhabitants within the agency, including, but not limited to, irrigation, domestic, ltre protection, municipal,<br />

commercial, industrial, recreational, and all other benefltcial uses and purposes. The <strong>Agency</strong> has the power to<br />

construct, operate and maintain works to develop hydroelectric energy, for use by the agency in the operation<br />

of its works or as a means of assisting in financing the construction, operation and maintenance of its projects.<br />

The <strong>Agency</strong> has the power to control the flooding and storm waters of the <strong>Agency</strong> and the flood and storm<br />

waters of streams that have their sources outside of the <strong>Agency</strong>, which streams and floodwaters flow in the<br />

<strong>Agency</strong>, and to conserve such waters for beneficial and useful purposes of said <strong>Agency</strong>. The <strong>Agency</strong> has the<br />

power to plan, finance, acquire, construct, operate, and maintain facilities for the collection, transmission,<br />

treatment, and disposal of sewage, waste, and storm water. Whenever any aÍea within the <strong>Agency</strong> is provided<br />

with a sewer or storm drain system by the <strong>Agency</strong>, the Board by ordinance may declare the further<br />

maintenance or use of cesspools, septic tanks, or other local means of sewage disposal to be a public nuisance,<br />

and may require all buildings inhabited or used by human beings which are not more than three hundred (300)<br />

feet from such system of any extension thereof to be connected with the system.<br />

The criteria used in determining the scope of the reporting entity are based on the provisions of GASB<br />

Statement 14 as amended by GASB Statement 39. The <strong>Agency</strong> is the primary government unit. Component<br />

units are those entities which are f,rnancially accountable to the primary government either because lhe <strong>Agency</strong><br />

appoints a voting majority of the component unit's board or because the component units will provide a<br />

financial benefit or impose a financial burden on the <strong>Agency</strong>. The <strong>Agency</strong> has no component units.<br />

Significant Accountins Policies<br />

A summary of the <strong>Agency</strong>'s significant accounting policies consistently applied in the preparation of the<br />

accompanying financial statements follows:<br />

iVlethod of Accountine<br />

The <strong>Agency</strong> utilizes accounting principles appropriate for an enterprise fund to record its activities'<br />

Accordingly, the statements of net assets and the statements of revenues, expenses, and changes in net assets<br />

have been prepared using the economic resources measurement focus and the accrual basis of accounting. The<br />

<strong>Agency</strong>'s books and records include a General Fund, the <strong>Amador</strong> <strong>Water</strong> System, the Central <strong>Amador</strong> <strong>Water</strong><br />

Project, four Improvement Districts, a Wastervater Fund and the <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> Financing<br />

Corporation. These funds have been combined in the accompanying statements of net assets, statements of<br />

revenues, expenses, and changes in net assets and statements of cash flows. All material interfund transactions<br />

have been eliminated.<br />

The <strong>Agency</strong> has not elected to apply the option allowed in Paragraph 7 of GASB Statemenl No. 20,<br />

"Accounting and Financial Reporting for Proprietary Activities" and as a consequence will continue to apply<br />

GASB Statements and interpretations'<br />

1a<br />

TJ


Sisnificant Accountine Policies (Continued)<br />

Estimates<br />

AMADOR WATER AGENCY<br />

NOTES TO FINA¡ICIAL STATEMENTS<br />

JLINE 30.2011 AND 2O1O<br />

The preparation of financial statements in conformily with accounting principles generally accepted in the<br />

unitôd States of America requires management to make estimates and assumptions that affect the reported<br />

amounts of assets and liabilities at the date of the financial statements and the reported amounts of revenues<br />

and expenses during the reporting period. Accordingly, actual results could differ from those estimates.<br />

Revenue Recognition<br />

The <strong>Agency</strong> recognizes revenue from water sales, sewer services and other fees when they are eamed.<br />

Operating u"tiuiti.r generally result from providing services and producing and delivering goods' As such, the<br />

,tgency Jonsiders feés received from water sales, sewer services and other fees to be operating revenues.<br />

Investments<br />

Investments are stated at their fair value which represents the quoted or stated market value' Investments that<br />

are not traded on a market, such as investments in external pools, are valued based on the stated fair value as<br />

represented by the external Pool'<br />

Allowance for Doubtful Accounts<br />

Bad debts are recognized on the allowance method based on historical experience and management's evaluation<br />

of outstanding receivables. The allowance for doubtful receivables totaled 549,324 and $-0- at June 30, 20 I I<br />

and 2010, respectivelY.<br />

Taxes and Assessments<br />

properly taxes and assessments are billed by the County of <strong>Amador</strong> to property owners. The <strong>Agency</strong>'s<br />

property tax calendar for the fiscal year ended June 30,2011 was as follows:<br />

Lien Date:<br />

Levy Date:<br />

Due Date:<br />

Delinquent Date:<br />

January I<br />

July I<br />

First lnstallment - November I<br />

Second lnstallment - February 1<br />

First Installment - December l0<br />

Second Installment - April 10<br />

The Counly collects the taxes from the property or#ners and remits.the funds to the <strong>Agency</strong> periodically during<br />

the year. The <strong>Agency</strong> has an arrangement with the Counfy, whereby the County remits taxes which are<br />

delinquent as of eãch Jgne 30 to the <strong>Agency</strong> in exchange for the right to retain the delinquent taxes, penalties<br />

and interest when these amounts are subsequently collected'<br />

InventorY<br />

lnventory consists primarily of materials used in the construction and maintenance of capital assets and is<br />

valued at weighted average cost.<br />

1Á<br />

l+


Sisnificant Accountine Policies (Continued)<br />

Capital Assets<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JI.JNE 30,2011 AND 2O1O<br />

The <strong>Agency</strong> does not have a capitalization policy. Capital assets purchased or acquired are reported at<br />

historical cost. Contributed assets are recorded at fair market value as of the date received. Additions,<br />

improvements and other capital outlays that significantly extend the useful life of an asset are capitalized.<br />

Otirer costs incurred for repãirs and maintenance are expensed as incurred. Depreciation is calculated on the<br />

straight-line method over the following estimated useful lives:<br />

40 - 50 years<br />

40 years<br />

40 years<br />

40 years<br />

40 years<br />

5 - 40 years<br />

Depreciation aggregated 53,770,544 and53,549,285 for the years ended June 30, 2011 and 2010, respectively.<br />

Interest<br />

The <strong>Agency</strong> incurred interest charges on long-term debt. No interest was capitalized as a cost of construction<br />

for the years ended June 30, 201 1 and 2010.<br />

Amortization<br />

utility Planr<br />

Source of Supply<br />

Pumping Plant<br />

Treatment Plant<br />

Transmission and Distribution<br />

General Plant<br />

Deferred bond costs are being amortized on the straighrline method over periods not to exceed debt<br />

maturities. Amortization of thèse expenses aggregated 512,993 and 512,994 for the years ended June 30,<br />

2011 and 2010, respectively. The deferred amount on refunding is being amortized on the straight-line<br />

method over the remaining life of the related debt. Amortization of the deferred amount on refunding<br />

totaled S¡,ZZ0 for the years ended June 30,2011 and 2010, and is included in interest expense.<br />

Compensated Absences<br />

Accumulated unpaid vacation and sick leave totaling $230,508 and $285,615 is accrued when incurred and<br />

included in noncurrent liabilities at June 30, 201 1 and 2010, respectively.<br />

Risk Manasement<br />

The <strong>Agency</strong> is a member of the Association of California <strong>Water</strong> Agencies Joint Powers Insurance Authority<br />

(Authoritv). The Authority is a risk-pooling self-insurance authority, created under provisions of California<br />

òovernmênt Code Sections 6500 et. seq. The purpose of the Authority is to arrange and administer programs<br />

ofinsurance for the pooling of self-insured losses and to purchase excess insurance coverage.<br />

15


Sienificant Accountins Policies (Continued)<br />

Risk Management (Continuedì<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JLINE 30.2011 AND 2O1O<br />

At June 30,2011, the <strong>Agency</strong> participated in the self-insurance programs of the Authorily as follows:<br />

property Loss - Insured up to $100,000,000 per occuffence (total insurable value of $23,621,175) with 52,500<br />

¿"¿u.tltt. for buildings, pìrsonal property, and fixed equipment, and a $1,000 deductible on mobile equipment<br />

and licensed vehicles; the Authority is self-insured up to $50,000 per occulrence and excess insurance coverage<br />

has been purchased. Boiler and machinery deductibles vary depending on the type of equipment.<br />

General Liability - Insured up to $60,000,000 per occurrence with no deductible; the Authority is selfinsured<br />

up to $1 million and excess insurance coverage has been purchased.<br />

Auto Liability - Insured up to $60,000,000 per occuffence with no deductible; the Authority is self-insured<br />

up to $1 million per occurence and excess insurance coverage has been purchased.<br />

Fidelity Bonds - The Authority is self-insured up to $100,000 per occulrence with a $1,000 deductible.<br />

public Officials' and Employees and Omissions - lnsured up to 560,000,000 per occurrence; the Authority<br />

is self-insured up to $1 million and excess insurance coverage has been purchased.<br />

Workers' Compensation - Workers' compensation is insured up to statutory amount and employer's<br />

tiuUitity is insured up to $4,000,000. The Authority is selÊinsured up to $2,000,000 and excess insurance<br />

coverage has been purchased.<br />

Cash and Cash Equivalents<br />

For purposes of the statement of cash flows, the <strong>Agency</strong> considers all investment instruments purchased with a<br />

maturity of three months or less to be cash equivalents'<br />

Subsequent Events<br />

ln preparing these financial statements, the <strong>Agency</strong> has evaluated events and transactions for potential<br />

.".ógrrition ór disclosure through February 23,2012, the date the financial statements rvere available to be issued.<br />

Reclassification<br />

The <strong>Agency</strong> has classified certain prior year information to conform with the current year presentation'<br />

Note 2 - Cash and Investments:<br />

The table below identifies the investment types that are authorized for the <strong>Agency</strong> by the California<br />

Government Code. The table also identifies certain provisions of the Califomia Government Code that address<br />

interest rate risk, and concentration of credit risk. This table does not address investments of debt proceeds<br />

held by bond trustees that are governed by the provisions of debt agreements of the <strong>Agency</strong>, rather than the<br />

g.r..ui provision of the California Government Code or the <strong>Agency</strong>'s investment policy:<br />

t6


Note 2 - Cash and Investments: (Continued)<br />

Authorized Investment Twe<br />

Local <strong>Agency</strong> Bonds<br />

U.S. Treasury Obligations<br />

State Obligations<br />

Califomia Local Agencies<br />

U.S. <strong>Agency</strong> Securities<br />

Bankers Acceptances<br />

Commercial Paper<br />

Negotiable Certihcates of Deposit<br />

Repurchase Agreements<br />

Reverse Repurchase Agreements<br />

Medium-Term Notes (Corporation Debt<br />

Investment Grade)<br />

Mutual Ftrnds<br />

Open Ended Money Market Mutual Funds<br />

Collateralized Bank Deposits<br />

Mortgage Pass-Through Securities<br />

Time Deposits<br />

California Local <strong>Agency</strong> Investment<br />

Fund (LAIF)<br />

Cash on hand $<br />

California Local <strong>Agency</strong> lnvestment Fund (LAIF)<br />

Open-ended money market mutual funds<br />

Deposits with financial institutions<br />

Investments:<br />

Certificates of deposit<br />

Total Cash and Investments<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JUNE 30,2011 A¡ID 2010<br />

Maximum<br />

Maturity<br />

5 years<br />

5 years<br />

5 years<br />

5 years<br />

5 years<br />

180 days<br />

270 days<br />

5 years<br />

I year<br />

92 days<br />

5 years<br />

N/A<br />

N/A<br />

5 years<br />

5 years<br />

5 years<br />

N/A<br />

Maximum<br />

Percentage<br />

of Portfolio<br />

None<br />

t00%<br />

None<br />

None<br />

100%<br />

40%<br />

25%<br />

30%<br />

t00%<br />

20olo of base value<br />

30%<br />

20%<br />

20%<br />

None<br />

20%<br />

None<br />

t00%<br />

Cash and investments held by the <strong>Agency</strong> were comprised of the following at June 30:<br />

Financial Statement Classification:<br />

Current:<br />

Cash and cash equivalents<br />

Investments<br />

Restricted:<br />

Cash and cash equivalents<br />

Total Cash and Investments<br />

l Year<br />

OT LCSS<br />

700<br />

288,105<br />

t7 5,641<br />

32,876<br />

s 497,322<br />

t7<br />

Maturity in Years<br />

l-5 Years<br />

121,290<br />

s 121,290<br />

20tl<br />

Total<br />

$ 700<br />

288,105<br />

t7 5,641<br />

32,876<br />

121,290<br />

$ 618,612<br />

s 461,321<br />

121,290<br />

36,001<br />

$ 618,612<br />

Maximum<br />

Investment<br />

in One Issuer<br />

None<br />

100%<br />

None<br />

None<br />

100%<br />

30%<br />

r0%<br />

t00%<br />

t00%<br />

100%<br />

t00%<br />

t0%<br />

l0%<br />

None<br />

100%<br />

None<br />

t00%<br />

20 10<br />

Total<br />

700<br />

46,439<br />

73,852<br />

260,184<br />

220,000<br />

$ 601,175<br />

$ 301,846<br />

220,000<br />

79,329<br />

$ 601,175


Note 2 - Cash and Investments: (Continuedl<br />

Disclosures Relafing to Interest Rate Risk<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JI.INE 30.2011 AND 2O1O<br />

lnterest rate risk is the risk that changes in market interest rates will adversely affect the fair value of an<br />

investment. Generally, the longer the maturity of an investment, the greater the sensitivily of its fair value to<br />

changes in market interest rates. One of the ways that the <strong>Agency</strong> manages its exposure to interest rate risk is by<br />

purcñasing shorter term investments and by timing cash flows from maturities so that a portion of the porrfolio is<br />

maturing over time as necessary to provide the cash flows and liquidity needed for operations.<br />

lnformation about the sensitivity of the fair values of the <strong>Agency</strong>'s investments (including investments held by<br />

bond trustee) to market interest rate fluctuations is provided in the previous table that shows the distribution of<br />

the <strong>Agency</strong>'s investments by maturity as of June 30, 2011.<br />

Disclosures Relating to Credit Risk<br />

Generally, credit risk is the risk that an issuer of an investment will not fulfill its obligation to the holder of the<br />

investment. This is measured by the assignment of a rating by a nationally recognized statistical rating<br />

organization. Presented below is the actual rating as of the year end for each investment type.<br />

Certificates of Deposit<br />

LAIF<br />

Concentration of Credit Risk<br />

Rating as of Year End<br />

Not Rated<br />

Not Rated<br />

Concentration of credit is the risk of loss attributed to the magrihrde to the <strong>Agency</strong>'s investrnent in a single issue.<br />

The investment policy of the <strong>Agency</strong> contains no limitations on the amount that can be invested in any one<br />

issuer beyond that stipulated by the Califomia Government Code. The <strong>Agency</strong> holds no investments in any<br />

one issuei (other than U.S. Treasury securities, mutual funds, and external investment pools) that represent 5olo<br />

or more of total <strong>Agency</strong> investments'<br />

Custodial Credit Risk<br />

Custodial credit risk for deposits is the risk that, in the event of the failure of a depository financial instilution,<br />

the <strong>Agency</strong> will not be able lo recover its deposits or will not be able to recover collateral securities that are in<br />

the possession of an outside party. The custodial credit risk for investments is the risk that, in the event of the<br />

failure of the counter-party (e.g., broker-dealer) the <strong>Agency</strong> will not be able to recover the value of its<br />

investment or collateral securities that are in the possession of another party. The California Government Code<br />

and the <strong>Agency</strong>'s investment policy do not contain legal or policy requirements that would limit the exposure<br />

to custodial ciedit risk for deposits or investments, other than the following provision for deposits: The<br />

California Government Code iequires that a financial instilution secure deposits made by state or local<br />

governmental units by pledging securities in an undivided collateral pool held by a depository regulated under<br />

Jtut" lu* (unless so wãived by the governmental unit). The market value of the pledged securities in the<br />

collateral pool must equal at least 110% of the total amount deposited by the public agencies. California law<br />

also allows financial institutions to secure <strong>Agency</strong> deposits by pledging first trust deed mortgage notes having<br />

a value of 150% ofthe secured public deposits.<br />

t8


Note 2 - Cash and Investments: (Continued)<br />

Custodial Credit Risk (Continuedl<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JLINE 30.2011AND 2010<br />

At June 30,2011, none of the <strong>Agency</strong>'s deposits with financial institutions in excess of federal depository<br />

insurance limits were held in uncollateralized accounts. The following <strong>Agency</strong> investments were held by the<br />

same broker-dealer (counterparty) that was used by the <strong>Agency</strong> to buy the securities as of June 30:<br />

20n 2010<br />

Certificates of Deposit<br />

Investment in State Investment Pool<br />

s ø290_ s 22o,oo0_<br />

The <strong>Agency</strong> is a voluntary participant in the Local <strong>Agency</strong> lnvestment Fund (LAIF) that is regulated by<br />

California Govemment Code under the oversight of the Treasurer of the State of California. The fair value of<br />

the <strong>Agency</strong>'s investment in this pool is reported in the accompanying flrnancial statements at amounts based<br />

,rpol t=h" Ágency's pro-rata share of the fair value provided by LAIF for the entire LAIF portfolio (in relation<br />

tó the amortized cõst of that portfolio). The balance available for withdrawal is based on the accounting<br />

records maintained by LAIF, which are recorded on an amortized cost basis.<br />

The statements of cash flows have been prepared by considering all investment instruments purchased with a<br />

maturity of three months or less to be cash equivalents. Following is a detail:<br />

California Local <strong>Agency</strong> Investment Fund (LAIF)<br />

Open-ended money market mutual funds<br />

Deposits with financial institutions<br />

Petty cash<br />

Total<br />

Note 3 - Restricted Assets:<br />

Restricted assets were provided by, and are to be used for, the following at June 30:<br />

Funding Source<br />

Use<br />

Capital faciliry fees, participation and annexation fees Reserve funds<br />

Payments from City of Plymouth<br />

Reserve funds<br />

20tl<br />

$ 288,105<br />

175,641<br />

32,876<br />

700<br />

s 497,322<br />

20lr<br />

$ 2,911<br />

33,090<br />

s 36,001<br />

20 10<br />

s 46,439<br />

73,852<br />

260,t84<br />

700<br />

$ 381,175<br />

20 l0<br />

$ 63,090<br />

t6,239<br />

s 79329<br />

When both restricted and unrestricted resources are available for use, it is the <strong>Agency</strong>'s policy to use restricted<br />

resources flrrst, and then unrestricted resources as necessary.<br />

l9


Note 4 - Due from the Citv of Plvmouth<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JIJNE 30.2011 AND 2O1O<br />

The <strong>Agency</strong> and the City of plymouth entered into an agreement to share the costs of constructing an 8-mile water<br />

transmîssion pipeline and related water facilities from the <strong>Agency</strong>'s Tanner <strong>Water</strong> Treatment Plant to the City of<br />

Plymou<br />

CitY of PlYmouth<br />

lS3 258 CitY of PlYmouth<br />

service<br />

the AgencY obtai<br />

(USDA) totaling $5,000,000. The USDA loans have 40 y<br />

year and Principal and interest payments in December of each year'<br />

The <strong>Agency</strong> has entered into negotiations with the City of Plymouth to determine the hnal percentage of project<br />

costs that would be owed to the <strong>Agency</strong>, at which point the due from the Cily of Plymouth balance may be adjusted.<br />

Changes in the due from the City of Plymouth consisted of the following at June 30, 201l:<br />

Due from the CitY of PlYmouth<br />

Note5-CapitalAssets:<br />

Balances at<br />

June 30, 2010<br />

s 3,274,334 $<br />

Capital assets consist of the following at June 30:<br />

Capital Assets Not Being<br />

Depreciated:<br />

Land<br />

Construction in Progress<br />

Total Capital Assets Not<br />

Being Depreciated<br />

Capital Assets Beins DePreciated:<br />

Utility plant<br />

Sotrce of supply<br />

Pumping plant<br />

Treatment plant<br />

Transmission and distribution<br />

General plant<br />

Total<br />

Less: Accumulated deP reciation<br />

Net Capital Assets Being<br />

Depreciated<br />

Net Capital Assets<br />

Balance at<br />

June 30,2010<br />

s 3,482,326<br />

5,064,514<br />

8,546,840<br />

t0,783,477<br />

1,640,5 86<br />

670,116<br />

22,787,356<br />

7 I,886,105<br />

10,712,831<br />

I I 8,480,471<br />

(29,1 19,585)<br />

89,360,886<br />

s 97,907,726<br />

Additions Deletions<br />

20<br />

$<br />

Additions<br />

Balance at<br />

June 30, 20 I I Current Portion<br />

$____G?f9Ð s___]4Jp_ $____ll¿!_<br />

567,074<br />

567,074<br />

418,910<br />

4s5,644<br />

20tL<br />

Deletions<br />

Balance at<br />

June 30, 201 I<br />

t0,783,477<br />

1,640,586<br />

670,116<br />

23,206,265<br />

72,34r,749<br />

t0,7t2,831<br />

119,355,024<br />

(32,890,r29)<br />

86,464,895<br />

$ (t,147,67s) s 94,431,134


Note 5 - Capital Assets: (ContÍnuedl<br />

Capital Assets Not Beine<br />

Depreciated:<br />

Land<br />

Construction in progress<br />

Total Capital Assets Not<br />

Being Depreciated<br />

Caoital Assets Being DePreciated:<br />

Utility plant<br />

Source of supplY<br />

Pumping plant<br />

Treatment Plant<br />

Transmission and distribution<br />

General plant<br />

Total<br />

Less: Accumulated dePreciation<br />

Net Capital Assets Being<br />

Depreciated<br />

Net Capital Assets<br />

Note6-Lons-TermDebt:<br />

Notes Pavable<br />

AMADOR WATER AGENCY<br />

NOTES TO FINA¡ICIAL STATEMENTS<br />

JUNE 30.2011Ai\D 2010<br />

Balance at<br />

June 30, 2009<br />

s 3,482,326<br />

9,444,520<br />

t2,926,846<br />

r0,783,477<br />

L,628,324<br />

644,001<br />

22,044,229<br />

63,889,511<br />

10,669,85 I<br />

r09,659,393<br />

(25,570,300)<br />

84,089,093<br />

Notes payable consist of the following at June 30:<br />

County of <strong>Amador</strong><br />

Department of <strong>Water</strong> Resources<br />

Department of <strong>Water</strong> Resources<br />

State <strong>Water</strong> Resource Control Board<br />

<strong>Amador</strong> County<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

Additions<br />

s- 4,430,651<br />

4,430,65r<br />

12,262<br />

26,tt5<br />

743,127<br />

7,996,594<br />

42,980<br />

8,821,078<br />

(3,s49,285)<br />

5,27r,793<br />

2010<br />

Deletions<br />

Balance at<br />

June 30, 2010<br />

$ s 3,482,326<br />

(8,810,6s7) s,064,sr4<br />

(8,810,657) 8,546,840<br />

t0,783,477<br />

I,640,586<br />

670,116<br />

22,787,356<br />

7 1,886,105<br />

t0,712,83t<br />

I I 8,480,471<br />

(29,1 19,585)<br />

89,3ó0,886<br />

$ 97,01s,939 s:2Jp4!_ $___G,,8W S e7,eo7'126<br />

20tr<br />

Balance at<br />

June 30,2010 Additions Deletions<br />

$ 900,000<br />

t,661,032<br />

28,845<br />

171,9'71<br />

201,66',1<br />

2,970,000<br />

1,980,000<br />

4,670,000<br />

794,000<br />

202,680<br />

$ 13,580,195 $-<br />

2l<br />

S-<br />

('t0,s94)<br />

(2,027)<br />

( l 3,s66)<br />

(29,352)<br />

(30,000)<br />

(20,000)<br />

(65,000)<br />

(10,000)<br />

(2,s52)<br />

$ (243,091)<br />

Balance at<br />

June 30, 201 I<br />

$ 900,000<br />

1,590,438<br />

26,818<br />

1 58,405<br />

l7z,3l5<br />

2,940,000<br />

1,960,000<br />

4,605,000<br />

784,000<br />

200,t28<br />

s 13,337,104<br />

Current<br />

Portion<br />

72,653<br />

2,087<br />

13,946<br />

30,937<br />

30,000<br />

20,000<br />

65,000<br />

10,000<br />

) 6


Note 6 - Lone-Term Debt: (Continued)<br />

Notes Pavable (Continued)<br />

<strong>Amador</strong> County<br />

<strong>Amador</strong> County<br />

State of Califomia (WRCB)<br />

State of Califomia (DWR)<br />

State of Califomia (DWR)<br />

U.S. Department of Agriculhrre<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

U.S. Department of Agriculture<br />

<strong>Amador</strong> County<br />

LaSalle Bank National Association<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JI.INE 30.2011 AND 2O1O<br />

Balance at<br />

June 30, 2009<br />

s-$ 229,5r5<br />

r85,167<br />

30,812<br />

t,729,533<br />

804,000<br />

205,130<br />

4,730,000<br />

3,000,000<br />

I,000,000<br />

52,785<br />

105,141<br />

20r0<br />

Additions Deletions<br />

900,000<br />

1,000,000<br />

$ 12,072,083 $ 1,900,000<br />

County of <strong>Amador</strong>, unsecured, payment at maturity of principal<br />

outstanding plus accrued interest at 2%o ord.gnal ¿rmount of $900,000.<br />

Matures December 2012.<br />

<strong>Amador</strong> Counly, secured by the Central <strong>Amador</strong> <strong>Water</strong> Project' Annual<br />

payment of 540,242 including inter est af, 5 .4Yo due each July I . Original<br />

amount $623,31 L Mahres July 2015'<br />

State of California <strong>Water</strong> Resources Control Board, secured by Pine<br />

Grove Wastewater System. Annual payments of $18,383 including<br />

interest at2.8Yo due eachNovember. Original amount of 5278,612<br />

matures November, 2020. The <strong>Agency</strong> shall maintain a dedicated<br />

source of revenue sufficient to provide reasonable assurance of<br />

repayment of this loan.<br />

State of Califomia Deparfnent of <strong>Water</strong> Resources, secured by the<br />

Hillside System Project. Semi-arìriual payments of 51,444 including<br />

interest at 3.0315yo due each April and October. Original amount<br />

550,358. Mahres Ap,.il 2022.<br />

State of Califomia Departrnent of <strong>Water</strong> Resources, secured by the<br />

Ridge System Project. Semi-annual payments of $60,210 including<br />

interest at 3.0315% due each April and October. Original amount of<br />

$2,3 59,032. Matures April 2028.<br />

22<br />

S.<br />

(27,848)<br />

(l 3,1e6)<br />

(1,967)<br />

(68,50 l)<br />

(r0,000)<br />

(2,450)<br />

(60,000)<br />

(30,000)<br />

(20,000)<br />

(52,785)<br />

( 105, l4l)<br />

s (391,888)<br />

Balance at<br />

June 30, 2010<br />

s 900,000 $<br />

20t,667<br />

l'7 t,97 |<br />

28,84s<br />

r,66t,032<br />

794,000<br />

202,680<br />

4,670,000<br />

2,970,000<br />

l,980,000<br />

20tl<br />

900,000<br />

Current<br />

Portion<br />

900,000<br />

to 1


Note 6 - Lons-Term Debt: (Continuedl<br />

Notes Pavable (Continued)<br />

AMADOR WATER AGENCY<br />

NOTES TO FINA¡ICIAL STATEMENTS<br />

JIJNE 30.2011 AIID 2O1O<br />

United States Department of Agriculture, Rural Utilities Service,<br />

secured by the Buckhorn <strong>Water</strong> Treatment Plant. Semi-annual<br />

payments each May and November including interest at 2-45o/o'<br />

Original amount of $840,000. Matures May2044'<br />

United States Department of Agriculture, Rural Utilities Serice,<br />

secured by the La Mel property. Annual payments of $10,912 each<br />

November including interest at 4.125Yo. Original amount of $212,000.<br />

Matures November 2044.<br />

United States Department of Agriculhre, Rural Utilities Service,<br />

secured by the Buckhom <strong>Water</strong> Treatment Plant. Semi-annual<br />

payments of interest only at 4.25o/o each May and interest plus varying<br />

principal amounts each November. Otiglnal amount of $5,000,000.<br />

Mahres November 2043.<br />

United States Departrnent of Agriculture, Rural Utilities Service,<br />

secured by all revenues and all amounts on deposit at <strong>Amador</strong> <strong>Water</strong><br />

<strong>Agency</strong>. Semi-annual payments of interest only at 4.5o/o each June and<br />

interest plus varying principal amounts each December' Original<br />

amount of $3,000,000. Matures December 2048.<br />

United States Department of Agriculture, Rural Utilities Service,<br />

secured by all revenues and all amounts on deposit at <strong>Amador</strong> <strong>Water</strong><br />

<strong>Agency</strong>. Semi-annual pa¡rments of interest only at 4'125% each June<br />

and interest plus varying principal amounts each December. Original<br />

amount of up to $2,000,000. Matures December 2048.<br />

Total Notes Pavable<br />

Certifi cates of Particination<br />

Certificates of Participation consist of the following at June 30:<br />

<strong>Amador</strong> <strong>Water</strong> System Revenue<br />

Certificates of Participation, 2006<br />

Series A<br />

Unamortized discounts and premiums<br />

Deferred amount on refunding<br />

Balance at<br />

June 30, 2010<br />

s 22,495,000<br />

22,495,000<br />

421,292<br />

(42,846)<br />

s 22,873,446<br />

S-<br />

23<br />

2011<br />

Additions Deletions<br />

20tt 20 l0<br />

784,000 $ 794,000<br />

200,128 202,680<br />

4,605,000 4,670,000<br />

2,g4o,ooo 2,970,000<br />

1,960,000<br />

$ 13,337,104<br />

Balance at<br />

June 30, 201 t<br />

s 22,010,000<br />

22,010,000<br />

404,931<br />

(35,705)<br />

s 22,379,226<br />

1,ggo,ooo<br />

$ 13,580,195<br />

Cunent<br />

Portion<br />

$ 505,000<br />

$ 505,000


Note 6 - Lons-Term Debt: (Confinued)<br />

Certificates of Participation (Continuedì<br />

<strong>Amador</strong> <strong>Water</strong> System Revenue<br />

Certifrcates of Participation, 2006<br />

Series A<br />

Unamortized discounts and premiums<br />

Deferred amount on refunding<br />

ANIADOR WATER AGENCY<br />

NOTES TO FINAIICIAL STATEMENTS<br />

JUNE 30.2011 AND 2010<br />

Balance at<br />

June 30, 2009<br />

s 23.352.666 S -<br />

2010<br />

Additions Deletions<br />

$ 247 ,27 5 s 528,93 I<br />

t,163,923 509,641<br />

268,461 490,198<br />

283,276 479,259<br />

294,203 467,862<br />

r,427,693 2,172,822<br />

t,621,777 1,879,238<br />

1,591,383 t,544,689<br />

1,678,324 1,209,622<br />

2,063,564 808,683<br />

r,962,234 324,601<br />

735,000 48,619<br />

$ 13,337,113 $ 10,464,165<br />

Balance at<br />

June 30, 2010<br />

Current<br />

Portion<br />

$ (470,000) s 22,495,000 $ 485,ooo<br />

(470,000) 22,4e5,000 $____4¡900_<br />

(16,361) 42t,292<br />

7,14r (42,846)<br />

s Ø79220) $ 22,873,446<br />

In March 2006, the <strong>Amador</strong> <strong>Water</strong> <strong>Agency</strong> Financing Corporation issued 523,240,000 <strong>Amador</strong> <strong>Water</strong> System<br />

Revenue Certificates of participation, 2006 Series A. A portion of the proceeds were used to extinguish<br />

$910,000 of the Califomia Special Districts Finance Corporation, 1996 Series AA Certificates of Participation.<br />

Net proceeds of approximately $946,144 were used to purchase government securities. Those securities were<br />

deposited in an inèvocable trust with an escrow agent to provide for all future debt service payment on the<br />

tq-g6 Series AA Certificates of Participation. As a result, the 1996 Series AA Certificates of Participation are<br />

considered to be defeased and the liability for the debt has been removed from the <strong>Agency</strong>'s financial<br />

statements. The principal amount outstanding on the 2006 Series A Cerlificates of Participation at Jwte 30, 201I and<br />

20 1 0. totaled $22,0 1 0,000 and $22,495,000, respectively.<br />

Although the refunding resulted in a deferred amount on refunding of $7 I ,410, the <strong>Agency</strong> in effect reduced its<br />

uggr"gãt" debt service payments by approximately $30 1,3 44, over the next l0 years and obtained an economic<br />

gãin õf approximately-$60,659. The deferred amount on refunding is being amortized over the life of the<br />

i.Rrn¿"¿ ¿.Ut. T'n. 2006 Series A Certificates of Participation are payable in annual installments including<br />

principal and interest at rates ranging ftom 4o/o to 5Yo and mature in June 2036.<br />

Debt service requirements on the long-term debt are as follows:<br />

Years Ending<br />

June 30<br />

2012<br />

20 13<br />

2014<br />

20t5<br />

20t6<br />

2017 -2021<br />

2022 -2026<br />

2027 -2031<br />

2032 -2036<br />

2037 - 204r<br />

2042 -2046<br />

2047 -2050<br />

Certifi cates of Participation Notes Payable Total<br />

Princioal Interest Princioal Interest Principal Interest<br />

$ 505,000 s t,027,82s<br />

525,000 1,007,625<br />

550,000 986,625<br />

570,000 964,625<br />

590,000 941,825<br />

3,335,000 4,334,925<br />

4,095,000 3,5't2,850<br />

5,205,000 2,465,000<br />

6,635,000 1,027,750_<br />

s 22.010,000 s 16,329,050<br />

.,Á<br />

s 752,275 $ 1,556,756<br />

r,688,923 r,517,266<br />

818,46 r 1,476,823<br />

853,2't6 t,443,884<br />

884,203 1,409,687<br />

4,762,693 6,507,747<br />

5,7t6,771 5,452,088<br />

6,796,383 4,009,689<br />

8,3t3,324 2,237,372<br />

2,063,564 808,683<br />

r,962,234 324,601<br />

735,000 48,619<br />

$ JIJ-$-ry


Note 7 - Caltrans Advance:<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JUNE 30.2011 AND 2010<br />

On October 30, lgg2, the <strong>Agency</strong> entered into a Utility Agreement with the California Department of<br />

Transportation (Cal-Trans), whereby Cal-Trans would advance the <strong>Agency</strong> the necessary costs for relocating<br />

Agenóy facilities on Highway 49 to make way for a Cal-Trans project. The Utility Agreement did not define the<br />

puiti"r; respective liabilities for certain disputed relocation costs. After execution of the Utility Agreement, Calirans<br />

advanced to the <strong>Agency</strong> $511,000 for relocation of the <strong>Agency</strong>'s Highway 49 utility facilities. of that<br />

amount, Cal-Trans acceptéd responsibility for approximately 565,172. The <strong>Agency</strong> disputed responsibility for the<br />

remaining amount or approximæely $445,828. Cal-Trans has not hled a claim or taken any action against the<br />

<strong>Agency</strong> in seeking .""ó,r"ry of the disputed amount. The <strong>Agency</strong> has recorded the advance of $445,828 as a<br />

noncurrent liabilify in the statement of net assets at June 30, 2011 and June 30, 2010.<br />

Note I - Post Emplovment Benefits:<br />

The <strong>Agency</strong> implemented GASB Statement No. 45, which changed the accounting and financial reporting used<br />

by locãl government employers for postemployment b year ended June 30, 2011' Previously,<br />

túe costs ãf such benefits were generally recognized as enses of local govemment employers on<br />

a pay-as-you-go basis. The <strong>Agency</strong> has not established trust fund in order to begin funding the<br />

a.g"rr.y'. ,rnt-¿"¿ liability as of June 30, 2011. The new reporting requirements for these benefit programs as<br />

they pertain to the <strong>Agency</strong> are set forth below.<br />

Plan Descriotion<br />

The <strong>Agency</strong> provides post-employment health care benefits established by <strong>Agency</strong> resolution to all qualifying<br />

emplofees.- ÈtigiUitity for retiree health benefits requires retirement from the <strong>Agency</strong> and PERS on or after<br />

ug" SO*ittr at leãst 5 years of <strong>Agency</strong> eligible service. The <strong>Agency</strong> pays 100% of the beneht for the employee<br />

and 90o/o of the benefit for their dependents.<br />

Fundins Policv and Annual OPEB Costs<br />

The contribution requirements of the <strong>Agency</strong> are established and may be amended annually by the Board of<br />

Directors. The Agincy's annual other post-employment benefit (OPEB) cost (expense) for the plan is<br />

calculated based onlhe annual required contribution of the employer (ARC), an amount actuarially determined<br />

in accordance with the parameters of GASB Statement No. 45. The ARC represents a level of funding that, if<br />

paid on an ongoing basis, is projected to cover normal costs each year and to amortize any unfunded acluarial<br />

iiubititi.r (or funding excess) over a period not to exceed thirry years. The <strong>Agency</strong>'s Board of Directors has<br />

established a policy õt funOing the ARC on a pay as you go basis. The following table shows the components<br />

of the <strong>Agency</strong>'s annual OPEB cost, the amount aclually contributed to the plan, and changes in the <strong>Agency</strong>'s<br />

net OPEB obligation at June 30:<br />

Z'n 2010<br />

Annual required contribution<br />

lnterest on net OPEB obligation<br />

Adjustment to annual required contribution<br />

Annual OPEB cost (expense)<br />

Contributions (including benefits paid)<br />

Increase in net OPEB obligation<br />

Net OPEB obligation - beginning of year<br />

Net OPEB obligation (Asset) - end of year<br />

25<br />

$ 450,283 $ 450,283<br />

450,283 450,283<br />

(103,905) (79,617)<br />

346,378 370,666<br />

370,666<br />

s 717,044<br />

$ 370,666


Note I - Post Emplovment Benefits: (Continued)<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEÌVIENTS<br />

JUNE 30.2011 AND 2010<br />

Fundins Policv and Annual OPEB Costs (Continued)<br />

The <strong>Agency</strong>'s annual OPEB cost, the percentage of annual OPEB cost contributed to the plan, and the net<br />

OPEB obligation for 2011 and the two preceding years were as follows:<br />

Fiscal<br />

Year Ended<br />

June 30, 2009<br />

June 30, 2010<br />

June 30, 201 I<br />

Annual<br />

OPEB Cost<br />

$ N/A<br />

450,283<br />

450,283<br />

Fundins Status and Fundins Prosress<br />

As of June l,2Ol0, the most recent actuarial valuation date, the plan was not yet funded. The <strong>Agency</strong>'s<br />

actuarial accrued liability for benefits was $4,788,6 52 at lune 1,2010, and the covered payroll (annual payroll<br />

of active employees covered by plan) was $4,689,284 and 3,647,232 with a ratio of the UAAL to the covered<br />

payroll of gg.qOy" and. l29.lIYo at J:urrre 30,201I and 2010, respectively. The normal cost payments made of<br />

$f-O¡,qOO at June 30, 20ll funded 23.1% of the Annual Required Contribution (ARC), leaving an unfunded<br />

actuarial liability (UAAL) of $4,684,748 and a funded ratio of 2.17o/o.<br />

Acfuarial<br />

Actuariat Actuarial Accrued Unfunded<br />

Valuation Value of LíabilitY AAL<br />

Date Assets Entry Age (U,4+!)<br />

(A) (B) (B-A)<br />

June 30,2009 $<br />

June 30, 2010<br />

June 30, 201 I<br />

N/A$N/ASN/A<br />

- 4,788,652 4,709,035<br />

- 4,788,652 4,684,748<br />

Percentage<br />

Annual OPEB<br />

Cost Contributed<br />

N/A<br />

t7.7%<br />

23.r%<br />

Net OPEB<br />

Obligation<br />

$ N/A<br />

370,666<br />

717,044<br />

UAAL as a<br />

Percentage<br />

Funded Covered ofCovered<br />

Ratio Payroll Payroll<br />

(A/B) (c) t(B-Aycl<br />

N/A $ N/A<br />

1.66% 3,647,232<br />

2.t7% 4,689,284<br />

N/A<br />

r29.tI%<br />

99.90%<br />

Actuarial valuations of an ongoing plan involve estimates of the value of reported amounts and assumptions<br />

about the probability of occurrence of events far into the future. Examples include assumptions about future<br />

employmurt, mortality, and the healthcare cost trend. Amounts determined regarding the funded stafus of the<br />

plan and the annual required contributions ofthe employer are subject to continual revision as actual results are<br />

compared with past expectations and new estimates are made about the future. Under GASB 45 the <strong>Agency</strong> is<br />

required to perform an actuarial valuation every three years.<br />

Actuarial Methods and Assumptions<br />

projections of benefits for hnancial reporting purposes are based on the substantive plan (the plan as<br />

understood by the employer and the plan members) and include the tlpes of benefits provìded at the time of<br />

each valuation and the historical pattern of sharing of benefit costs between employer and plan members to that<br />

point. The acluarial methods and assumptions used include techniques that are designed to reduce the effects<br />

ãf rhort-t..- volatility in actuarial accrued liabilities and the actuarial assets, consistent with the long-term<br />

perspective of the calculations.<br />

26


Note 8 - Post Emplovment BenefÌts: (Continued)<br />

Actuarial Methods and Assumptions (Continuedl<br />

AI}IADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JUNE 30.2011 AND 2010<br />

The actuarial cost method used for determining the benefit obligations is the Entry Age Normal Cost Method.<br />

The actuarial assumptions included a 5olo investment rate of return, which is the assumed rate of the expected<br />

long-term investment returns on plan assets calculated based on the funded level of the plan at the valuation<br />

date, and an annual healthcare cost trend rate of 4 percent. Both rates included a3.0Yo inflation assumption.<br />

The UAAI is being amortized as a level percentage of projected payroll over 30 years. It is assumed the<br />

<strong>Agency</strong>'s payroll will increase 3.0o/oper year.<br />

Note 9 - Defined Benefìt Pension Plan:<br />

Plan Description<br />

The <strong>Agency</strong> contributes to the California Public Employees Retirement System (CaIPERS), a cost sharing<br />

multiple-employer defined benefit pension plan. The <strong>Agency</strong> participates in the Miscellaneous 2.0o/o at 55<br />

Risk Þool. CaIPERS provides retirement and disabiliry benefits, annual cost-of-living adjustments, and death<br />

benefits to plan members and beneficiaries. CaIPERS acts as a common investment and administrative agent<br />

for participating public employers within the state of California. CaIPERS requires agencies with less than<br />

100ãctive members in the plan to participate in a risk pool. All full and part-time <strong>Agency</strong> employees working<br />

at least 1,000 hours per year are eligible to participate in CaIPERS. Under CaIPERS, benefits vest after five<br />

years of service. Upon retirement, participants are entitled to an annual retirement benefit payable for life, in<br />

ân amount equal to a benefit factor times the monthly average salary of the highest consecutive months' fulltime<br />

equivalent monthly pay. A menu of benefits provisions as well as other requirements is established by<br />

State Statutes within the Public Employees Retirement Law. The plan selects optional benefit provisions from<br />

the benefit menu by contract with CaIPERS and adopts those benefits through <strong>Agency</strong> resolution. CaIPERS<br />

issues a separate comprehensive annual financial report. Copies of the CaIPERS' annual flrnancial report may<br />

be obtained from the CaIPERS executive office - 400 P Street - Sacramento, California 95814.<br />

Funding Policv<br />

Active plan members are required to contribute 7Yo of their annual covered salary. The <strong>Agency</strong> makes the<br />

contributions required of <strong>Agency</strong> employees on their behalf and for their account. The <strong>Agency</strong> is required to<br />

contribute at an actuarially determined rate. The required employer contribution rate was 10.69% and<br />

10.303% for the fiscal year ended June 30, 201 I and 2010, respectively. The contribution requirements of<br />

the plan members and the <strong>Agency</strong> are established and may be amended by CaIPERS. The <strong>Agency</strong>'s<br />

contributions were $517,463, $601,878 and $651,903 for the years ended June 30,2011, 2010 and 2009,<br />

respectively, which were equal to the required contributions each year.<br />

Note 10 - Litieation:<br />

Legal claims and lawsuits arise from time to time in the normal course of business which, in the opinion of<br />

management, will have no material effect on the <strong>Agency</strong>'s hnancial position.<br />

27


Note 11 - Proposition 1A Securitization Prosram:<br />

AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JTJNE 30.2011 AND 2O1O<br />

Under the provisions of Proposition lA and as part of the 2009-10 budget package passed by the California State<br />

legislature on July 28, 2009, the State of California borrowed 8% of the amount of properly tax revenue<br />

apportioned to cities, counties and special districts (excluding redevelopment agencies). The state is required to<br />

råpay this borrowing plus interest by June 30,2013. Aft borrowing, the California<br />

t"girtutor" -uy .onrìdir only one additional borrowing wi amount of this borrowing<br />

pertaining to the <strong>Agency</strong> was $20,724. The borrowing was rnia during the year ended<br />

June 30,2010.<br />

Authorized with the Z0Og - 2010 State budget package, the Proposition lA Securitization Program was instituted<br />

by the California Statewide Communities Development Authority ("California Communities"), a joint powers<br />

uothority sponsored by the California State Association of Counties and the League of California Cities, to enable<br />

local governments to sell their Proposition lA receivables to California Communities. Under the Securitization<br />

progrãm, California Communities simultaneously purchased the Proposition 1A receivables and issued bonds<br />

(,.p-p 1A Bonds") to provide local agencies with cash proceeds in two equal installments, on January 15, 2010<br />

ànd ivtay 3,2OlO. The purchase price paid to the local agencies equaled 100% of the amount of the properly tax<br />

reduction, Al1 transactiãn costs of ir.uun." and interest were paid by the State of Califomia. Participating local<br />

agencies have no obligation on the bonds and no credit exposure to the State. The <strong>Agency</strong> participated in the<br />

securitization program and accordingly property taxes have been recorded in the same manner as if the State had<br />

not exercised iìs rigtrts under PropositionlA. The receivable sale proceeds were equal to the book value and, as a<br />

result, no gain or loss was recorded.<br />

Note 12 - New Governmental Accounting Standards:<br />

GASB No.51<br />

In June 2007, the Governmental Accounting Standards Board issued Statement No' 51, "Accounting and<br />

Financial Reporting for Intangible Assets." This pronouncement is effective for periods beginning after June<br />

15,2009. Retroactive reporting of these intangible assets is encouraged but not required. This Statement<br />

requires that all intangible assets not specifically excluded by its scope provisions be classihed as capital<br />

assets. This pronouncement did not have a material effect on the <strong>Agency</strong>'s statements in the year of adoption,<br />

the year ended June 30, 201 L<br />

GASB No.53<br />

ln June 2008, the Governmental Accounting Standards Board issued Statement No. 53 "Accounting and<br />

Financial Reporting for Derivative lnvestments." This pronouncement is effective for periods beginning after<br />

June 15, 2009 with earlier application encouraged. The Statement requires govemments to measure most<br />

derivative instruments at fair value in their hnancial statements that are prepared on the economic resources<br />

measuÍement focus and the accrual basis of accounting. The guidance in this Statement also addresses hedge<br />

accounting requirements. The <strong>Agency</strong> has no derivative instruments at June 30, 2011.<br />

28


AIMADOR WATER AGENCY<br />

NOTES TO FINfu\CIAL STATEMENTS<br />

JI.INE 30.2011 AND 2O1O<br />

Note 12 - New Governmental Accounting Standards: (Continuedl<br />

GASB No.54<br />

In March 2009, the Government Accounting Standards Board issued Statement No. 54, "Fund Balance<br />

Reporting and Governmental Fund Type Definitions." This pronouncement is effective for periods beginning<br />

after June 15, 2010, with early implementation encouraged. This pronouncement establishes fund balance<br />

classifications that comprise a hierarchy based primarily on the extent to which a govemment is bound to<br />

observe constraints imposed upon the use of the resources reported in governmental funds. The initial<br />

distinction that is made in reporting information in reporting fund balance information is identifying amounts<br />

that are considered non-spendable, such as fund balance associated with inventories. This statement also<br />

provides for additional classification as restricted, committed, assigned, and unassigned based on the relative<br />

strength of the constraints that control how specific accounts can be spent. Fund balance reclassifications<br />

made to conform to the provisions of this statement should be applied retroactively by restating fund balance<br />

for all periods presented. The <strong>Agency</strong> has no governmental funds at June 30, 2011.<br />

GASB No. 57<br />

In December 2009, the Government Accounting Standards Board issued Statement No. 57, "OPEB<br />

Measurements by Agent Employers and Agent Multiple-Employer Plans." This Statement amends Statement<br />

No. 45. "Accounting and Financial Reporting by Employers for Postemployment Benefits Other Than<br />

Pensions" to permit an agent employer that has an individual-employer OPEB plan with fewer than 100<br />

members to use the alternate measurement method, at its option, regardless of the number of total plan<br />

members in the agent-multiple employer OPEB plan in which it participates. Consistent with this change to<br />

the employer-reporting requirements, this Statement also amends a requirement in Statement No. 43.<br />

"Financial Reporting for Postemployment Benefit Plans Other Than Pension Plans," that a defined beneht<br />

OPEB plan obtained an actuarial valuation, The amendment permits the requirement to be satisfied for an<br />

agent-multiple employer OPEB plan by reporting an aggregation of results of actuarial valuation of the<br />

individual-employer OPEB plans or measurements resulting from use of the altemative measurement method<br />

for individual-employer OPEB plans that are eligible.<br />

In addition, the Statement clarifies that when acluarially determined OPEB measures are reported by an agent<br />

multiple-employer OPEB plan and its participating employers, those measures should be determined as of a<br />

common date and at a minimum frequency to salisfy the agent multiple-employer OPEB plan's financial<br />

reporting requirements. This pronouncement did not have a material effect on the financial statements of the<br />

<strong>Agency</strong> in the year of implementation, June 30, 2010.<br />

GASB No. 58<br />

ln December 2009, the Governmental Accounting Standards Board issued Statement No. 58, "Accounting and<br />

Financial Reporting for Chapter 9 Bankruptcies." This pronouncement is effective for periods beginning after<br />

June 15, 2009. Early application is encouraged. Retroactive application is required for all periods presented<br />

during which the government was in bankruptcy. The objective of this Statement is to provide accounting and<br />

financial reporting guidance for govemments that have petitioned for protection from creditors by frling for<br />

bankruptcy under Chapter 9 of the United States Bankruptcy Code. It requires govemments to re-measure<br />

liabilities that are adjusted in bankruptcy when the court approved a new payment plan. The <strong>Agency</strong> has not<br />

filed for bankruptcy protection as of June 30, 20 I I .<br />

29


AMADOR WATER AGENCY<br />

NOTES TO FINANCIAL STATEMENTS<br />

JUNE 30.2011 AND 2010<br />

Note 12 - New Governmental Accountins Standards: (Continued)<br />

GASB No.59<br />

ln June 2010, Govemmental Accounting Standards Board issued Statement No. 59, "Financial lnstruments<br />

Omnibus." This pronouncement is effective for periods beginning after June 15,2011. Earlier application is<br />

encouraged. The objective of this Statement is to update and improve existing standards regarding financial<br />

reporting and disclosure requirements of certain financial instruments and external investment pools for which<br />

significant issues have been identihed in practice. This pronouncement did not have a material effect on the<br />

financial statements for the year ended June 30, 2011.<br />

GASB No.60<br />

ln November 2010, the Governmental Accounting Standards Board issued Statement No. 60' "Accounting and<br />

Financial Reporting for Service concession Arrangements". This pronouncement is effective for periods<br />

beginning aftèr Deõember 15, 2011 and its provisions are generally required to be applied retroactively. The<br />

oblective of this statement is to address issues related to service concession arrangements (SCA's) which are a<br />

type of public-private or public-public p ls an e transferor (a<br />

gwernmènt) unà un operator in which (l) to the ated obligation<br />

Io provide services ihrough the use of infrastructu er pub for significant<br />

consideration and (2) the operator collects and is compensated by fees from third parties. The <strong>Agency</strong> does not<br />

have any SCA's as of June 30,2011'<br />

GASB No. 61<br />

In November 2010, the Governmental Accounting Standards Board issued Statement No' 61, "The Financial<br />

Reporting Entity: Omnibus - an amendment of GASB Statements No. 14 and No. 34". This pronouncement<br />

is åffective for periods beginning after June 15, 2012. Earlier application is encouraged' The objective of<br />

this statement is to address reporting entity issues that have arisen since the issuance of Statements No'14<br />

and No. 34. The <strong>Agency</strong> does not have any component units as of June 30, 2011.<br />

GASB No. 62<br />

ln December 2010, the Governmental Accounting Standards Board issued Statement No. 62, "Codification of<br />

Accounting and Financial Reporting Guidance contained in Pre-November 30, 1989 FASB and AICPA<br />

pronouncements". This p.onorrn."*ent is effective for periods beginning after December 15, 2011. Earlier<br />

application is encourageá. The objective of this statement is to incorporate into the GASB's authoritative<br />

liìðrarure certain accounting and financial reporting guidance that is included in the pronouncements of the<br />

FASB and the AICPA that was issued on or before November 30, 1989 which does not conflict with or<br />

contradict GASB pronouncements. This pronouncement is not anticipated to have a material effect on the<br />

hnancial statements of the <strong>Agency</strong> in the year of implementation.<br />

Note 13 - Subsequent Event:<br />

As of November 28,2011, the <strong>Agency</strong> agreed in principle to a seven year promissory note with the City of<br />

Sutter Creek (the City) to borrow $596,029 to settle and release the <strong>Agency</strong> of an existing Accounts Payable<br />

balance to the, City. the note will bear interest based on the average monthly yield as published by the Local<br />

<strong>Agency</strong> Investment Fund. Principal and interest will be payable in equal calendar quarter payments of $21,583<br />

beginning January l, 2012.<br />

30


@¡-@<br />

Caslì uùl mvÈstmcnts<br />

AccouE recelvable, net:<br />

Cwent scruces<br />

Other<br />

Taxes<br />

Grants recervable<br />

AccruÈd inlÉrcst rccc¡vable<br />

CwÉ¡il portron duc iiom ilñ<br />

Ci¡y of PlyDrouth<br />

Mrlcrrâls ¡nventory<br />

Prcpaid expenses<br />

Total CMcDt Asse ts<br />

NonCurrent -{ssets:<br />

Rcstricted Asscts:<br />

Cash urd cash equlvalents<br />

Total Rcsrrcted Assc¡s<br />

Cap¡t¿l Assets<br />

Otl¡cr Asscts:<br />

I¡lcrlud recc¡vablcs<br />

Due lìon the Crty of Plymouth, lcss<br />

cüÍenl Portlon abovc<br />

DctèrrÈd bond cosls<br />

TOlAL ASSETS<br />

Total Olhcr Assets<br />

Total NonCurcnt Assots<br />

<strong>Agency</strong><br />

e!.g!<br />

391.864<br />

5 1,455<br />

14,551<br />

I I,0l I<br />

135<br />

994<br />

A¡nad0r<br />

W¡ter<br />

AÉlr<br />

575.984 $<br />

599,445<br />

20.846<br />

470 010 1.482.844<br />

- 36,001<br />

- 36,001<br />

947.4t't 53.451.71 I<br />

r35,500<br />

237,129<br />

3'.12.619<br />

I,320,046<br />

$_l-.790'056-<br />

2t4<br />

35,9t0<br />

2t'7,588<br />

32.457<br />

3,082,499<br />

3,205,519<br />

ó28S.ol 8<br />

AMADOR WATER AGENCY<br />

SCHEDULE OF NET ASSETS BY RATE AREA<br />

JUNE 30,2011<br />

Ceutrâl<br />

A¡nad0¡<br />

ìil¿Ìcr<br />

B¡e¡Ês!<br />

(235.343) S<br />

30,o92<br />

64,'.775,730 11.469,112<br />

$_@$-Æ]-<br />

Inrprovenent Iurprovement W¿stc lflprovcoreot Iáprovenrent CAWP<br />

W¡ter Distr¡ct I S!$ds!-L Þ!4c!-2, I ry¡.ES-l3 Ae!4i! Elimin¿tions Totâl<br />

2l,420 $<br />

5,367<br />

4,490 I ?8<br />

(200.761 ) 26,923<br />

t1,469,'l 12 633.271<br />

8<br />

(r 95,0?o)<br />

3l<br />

(2 l 8,69i) $<br />

t1't,544<br />

9,563<br />

(6e.600) $<br />

114,428<br />

673<br />

55,984<br />

2.198 2-806<br />

r29.388r lO4-291<br />

24,t31 $<br />

52,O95<br />

55<br />

208,t65 $<br />

I I 5,635<br />

t2,3t5<br />

1.379 2-549<br />

't'1.663 338.'141<br />

6.969.852 1


Current Li¿rbilitÌes:<br />

Accornts ÞaYablc<br />

Deposrts<br />

Accnred intcrÉst payable<br />

Othcr payablcs<br />

Cure¡rt Portron oflong-lerm dcbt<br />

lotol Cùrenl Liabilitres<br />

Noncurrcut Liabilities:<br />

Long'ferrn Debl:<br />

Ccdilicatcs of pa¡ticipat¡oo<br />

Notes payable<br />

Total Long 'lenn Debt<br />

Caltraìs advalce<br />

N€t OPEB obli8ation<br />

Co¡npeNatcd absçnces<br />

Net Assets:<br />

Total Other Noncurerìt LEbilúres<br />

'l'otal Nolrcmetrt Lubtlttcs<br />

Total Liabilitics<br />

Investgd ul capúal asseB,<br />

net ofrelated debt<br />

Resl¡¡cred<br />

UNestrictcd<br />

Totul Net Asscts<br />

TO-IAL LIABILII'IDS AND<br />

NET.{SSE t'S<br />

Agcrcy<br />

ç-er.g!<br />

AMADOR \ryATER AGENCY<br />

SCHEDULE OF NET ASSETS BY RATE AREA (CONTINUED)<br />

JUNE 30,2011<br />

An¡adof<br />

Wôtcr<br />

Þllel|r<br />

s 64,i26 $ 41,076<br />

- 68,63 I<br />

- r 15,705<br />

64,267 9,300<br />

-<br />

629,740<br />

128.593 864.452<br />

- 445,828<br />

3t,43'.1 3'16,373<br />

23,6t6 103,137<br />

55.053 925,338<br />

Central<br />

A¡nador<br />

W¿tcr<br />

Proicct<br />

$ I 8,352<br />

68,040<br />

105,937<br />

t92,329<br />

2t,814,226<br />

6.392.516 6,355,378<br />

28_266.742 6,355,3'18<br />

7 t,366<br />

26.1 80<br />

91,546<br />

55.053 29.1e2.080 6,452,924<br />

183.646 30.056.532 6,645,253<br />

94'1,4t'l 29,109,401<br />

- 3ó,001<br />

658,993 1,056,640<br />

1.606.410 36.202,042<br />

Inlproveilent ¡mProvemenl<br />

!2i$41-1 È¡rlfls!-z,<br />

t,4'70 $<br />

450<br />

2,061<br />

2.652<br />

6.636<br />

197,476<br />

197,476<br />

5,008,397 433,t43<br />

l 8,643<br />

9,349<br />

5,550<br />

3354'<br />

2,7A9 i5,491<br />

I,9t2 12,520<br />

4.70t 48.01i<br />

202.t77 48.01 I<br />

208.813 8l,551<br />

W¿ste<br />

'Wâler<br />

s 6,321<br />

t25<br />

. qs?<br />

2,OOO<br />

t3,946<br />

144,459<br />

t44,459<br />

lmprovcDent<br />

giú¡s!-ff<br />

$ 8,1 12<br />

s,l l,<br />

lm provemeDt CAWP<br />

È!!¡s!.!¿ Bsl4i!<br />

6'73,260 $<br />

150<br />

6,366 S<br />

l 8,058<br />

673,4tO 24.424<br />

4'7,600 29,305 31,019 85,604<br />

ì8,346 8,9'12 10,339 25,486<br />

65,946 3A.2'l'.l 47 ,418 I I I,090<br />

210,405 38,2'.71 47,418<br />

235.760 46,389 120,828 I 35.5 t4<br />

6.969.852 3,3'.18,63'.1 3,037,804 5,264,227<br />

(3s4,69e) (r?6.832) (811:714't (t.3'15.921\ (t.260.2e21 90e.4?9<br />

4,623,6s8 256,3tr 6.098,138 2,002.710 t,77'1,512 6,173,70(,<br />

4,120,098<br />

E!¡¡q!¡&r<br />

'fotal<br />

$ 837,932<br />

96,763<br />

I 88,766<br />

8l,l l7<br />

752.2'.75<br />

r.956.853<br />

21,8'74,226<br />

l 3,089.829<br />

34.964.O55<br />

445,828<br />

7r7,O44<br />

230,508<br />

1.393.380<br />

36.35't.435<br />

38,3 I 4,288<br />

$=Æglg_ sJgf8 $==j]-@].- s3L $iJ.æ]- s==_ryg- $Æ g=¡$$ s=..@ $: $.Æg.LgL<br />

32<br />

(573.260)<br />

3.546.838<br />

58,268,976<br />

36,00 I<br />

3,982,388<br />

62,2A'7,365


ODerati¡rg Revenues:<br />

Curenr scryiccs<br />

Othcr rcvenues<br />

Tolal Operaling Revcnues<br />

0oer¿ting Exoenses:<br />

AûDinìstralivÈ æd gcnçral<br />

DeprÈciation<br />

Transnrission ud distributiott<br />

Mamtcruìcc<br />

Engureenug<br />

Souce ofsupply<br />

Walcr lrsat¡ncl[<br />

Total Operating Expcnses<br />

Opemting Loss<br />

Nop0Dcr¡titrg Revenücs<br />

4lÐ!e!$ù<br />

Paticþation lèes<br />

'fdxes & ¿sscsslì)cnts<br />

Other ¡evenue<br />

llì\,estnent i[come<br />

Grmt lcvenue<br />

Anrort¡zâtlon<br />

Other expeme<br />

lltl€rcs¡ cxPç6c<br />

Total Nonopcr¿ting Rcvenucs<br />

aìd (Expc¡rscs)<br />

(Loss) Betbre Caprtal Co¡ìtributiorN<br />

Cruitrl Cont¡ibutions<br />

Chilìgc ir Dc! asscts<br />

Net Asscts at Bcgiruing of Yea-<br />

NET ASSETS AT END OF YEAR<br />

AMADOR WATER AGENCY<br />

SCHEDULE OF REVENUES, EXPENSES AND CHANGES IN NET ASSETS BY RATE AREA<br />

FORTHE YEARENDED JUNE 30,2011<br />

$-<br />

Ã<br />

<strong>Agency</strong><br />

Cencral<br />

94, I 85<br />

94.185<br />

326,5'19<br />

284;178<br />

30,652<br />

20,882<br />

50,963<br />

19,946<br />

(639.61 5 )<br />

266,499<br />

I 3,836<br />

(12,e93)<br />

'7,096<br />

r

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!