Revision Date: May 2010<br />

<strong>35</strong> <strong>kV</strong> <strong>and</strong> <strong>Below</strong> Interconnection Requirements for Power Generators<br />

4.2 Service Entrance Protection<br />

The PG’s entrance circuit breaker shall be included in the entrance protection zone. That is, the relays<br />

shall connect to CTs on the <strong>BC</strong>H side of the circuit breaker, as shown in Figure 1.<br />

PG MANUAL<br />

GROUP OPERATED<br />

LOAD-BREAK<br />

DISCONNECT SWITCH<br />

K<br />

<strong>BC</strong> HYDRO PRIMARY DISTRIBUTION<br />

SA<br />

ENTRANCE<br />

PROTECTION<br />

Figure 1: Entrance Protection One-Line<br />

See Section 7.0 for revenue metering equipment locations.<br />

<strong>BC</strong>H REVENUE<br />

METERING<br />

<strong>BC</strong>H can provide the following feeder information:<br />

(a) feeder maximum <strong>and</strong> minimum fault levels at the proposed POI,<br />

(b) feeder annual maximum/ minimum load <strong>and</strong> feeder capacity,<br />

(c) line <strong>and</strong> substation voltage regulator setpoint, b<strong>and</strong>width <strong>and</strong> time delay ,<br />

(d) details on the setting <strong>and</strong> sequence of operation for substation feeder breakers, line reclosers <strong>and</strong><br />

line fuses,<br />

(e) feeder reliability records.<br />

The following additional general requirements should be noted:<br />

(a) Quality protection for <strong>BC</strong>H customer loads is required for all generating plants, i.e. under/over<br />

voltage <strong>and</strong> under/over frequency.<br />

(b) Distribution feeders operate with varying unbalanced phase current. The PG’s equipment may be<br />

subjected to negative sequence current due to negative sequence unbalance in the distribution<br />

system. The PG is therefore encouraged to provide negative sequence (current unbalance)<br />