Revision Date: May 2010<br />

<strong>35</strong> <strong>kV</strong> <strong>and</strong> <strong>Below</strong> Interconnection Requirements for Power Generators<br />

4.2 Service Entrance Protection 23<br />

4.2.1 Protection with Relays <strong>and</strong> Circuit Breaker 24<br />

4.2.2 Protection with Fuses <strong>and</strong> Loadbreak Switch 26<br />

4.3 Off-Nominal Voltage Operation 26<br />

4.4 Off-Nominal Frequency Operation 27<br />

4.5 Electromagnetic Interference <strong>and</strong> Surge Withst<strong>and</strong> 27<br />

4.6 Batteries / Chargers / DC Supplies 28<br />

5. System Operating Requirements 28<br />

5.1 Generation Shedding 28<br />

5.2 Generation Isl<strong>and</strong>ing 28<br />

5.2.1 Synchronous Generators 29<br />

5.2.2 Induction Generators 29<br />

6. Control <strong>and</strong> Telecommunications Requirements 29<br />

6.1 General 29<br />

6.2 Operations Control <strong>and</strong> Telecommunications Facilities 30<br />

6.3 Telecommunications Media 30<br />

6.4 Operating Data/Status Telemetering 30<br />

7. REVENUE METERING 32<br />

8. Commissioning Requirements 33<br />

8.1 General 33<br />

8.2 Commissioning Test 34<br />

8.3 Protection Equipment 34<br />

8.4 Telecommunications Equipment 34<br />

8.5 Operating, Measurement <strong>and</strong> Control Systems 34<br />

8.6 Apparatus <strong>35</strong><br />

8.7 Generator(s) <strong>35</strong><br />

9. Maintenance Requirements <strong>35</strong><br />

9.1 General <strong>35</strong><br />

9.2 Preventive Maintenance <strong>35</strong><br />

9.3 Protection <strong>and</strong> Telecommunications Equipment <strong>35</strong><br />

10. Regulatory <strong>and</strong> Reliability Requirements 36<br />

10.1 WECC Reliability Requirements 36<br />

3