<strong>35</strong> <strong>kV</strong> <strong>and</strong> <strong>Below</strong> Interconnection Requirements for Power Generators<br />

APPENDIX F DECLARATION OF COMPATIBILITY<br />

PG plants that sell electricity shall comply with the various levels of Declarations of Compatibility as listed below.<br />

These declarations refer to key aspects where <strong>BC</strong>H must be confident of the correct operation, setting, calibration<br />

<strong>and</strong>/or installation of equipment.<br />

Each declaration must be signed by <strong>BC</strong> <strong>Hydro</strong> <strong>and</strong> the Power Generator agreeing that the PG’s Interconnection is<br />

compatible with the <strong>BC</strong> <strong>Hydro</strong> system <strong>and</strong> is capable of receiving electricity, generating electricity for<br />

commissioning purposes, or full commercial generating electricity. A copy of each declaration will be sent to the<br />

appropriate ACC in preparation for connection of Power Generator facilities to the <strong>BC</strong> <strong>Hydro</strong> Distribution system.<br />

This may include, but is not limited to, generator performance, protective relaying, telecommunications, revenue<br />

metering, <strong>and</strong> shall confirm the compatibility of the PG’s equipment <strong>and</strong> controls with <strong>BC</strong> <strong>Hydro</strong>’s systems where<br />

applicable.<br />

Revision Date: May 2010 46