<strong>35</strong> <strong>kV</strong> <strong>and</strong> <strong>Below</strong> Interconnection Requirements for Power Generators<br />

F.1 Requirements for “Declaration of Compatibility – Load”<br />

The compatibility of load describes conditions that must be satisfied before the PG’s facility can be connected to<br />

receive electricity from <strong>BC</strong> <strong>Hydro</strong> <strong>and</strong> usually occurs during construction.<br />

Generator:<br />

Project:<br />

Declaration of Compatibility, Load, Generator’s Facilities<br />

The Generator shall design, construct, own, <strong>and</strong> maintain the Customer’s Facilities.<br />

Interconnection Yes No<br />

1. Executed Interconnection Agreement<br />

2. <strong>BC</strong> <strong>Hydro</strong> has reviewed the Generator’s proposed facilities to confirm compliance with <strong>BC</strong><br />

<strong>Hydro</strong>’s technical requirements for operation as a load.<br />

3. For installations with induction generators – is the generator capable of self excitation or<br />

excitation by system<br />

4. For installation with inverters – is the inverter compliant with CSA 107.1-01 or UL1741<br />

5. Accepted by Real Time Operations, <strong>BC</strong>TC, for energization as a load<br />

Field Verification<br />

1. Protective Relay Coordination confirmed.<br />

2. Revenue Metering Installation completed <strong>and</strong> checked. Attach <strong>BC</strong> <strong>Hydro</strong> Metering Checklist.<br />

3. Complete the Power Parameter Information System (PPIS) installation<br />

4. Distribution Operating Order (DOO) approved by <strong>BC</strong> <strong>Hydro</strong> <strong>and</strong> Generator. Generator <strong>and</strong><br />

Control Centre have copies<br />

5. Electrical Inspection Approval attached.<br />

6. Professional Engineer’s declaration(s) that the Generator’s Facilities have been designed,<br />

constructed, <strong>and</strong> tested to a state suitable for operation as a load in accordance with applicable<br />

st<strong>and</strong>ards <strong>and</strong> prudent electrical utility practices.<br />

7. <strong>BC</strong> <strong>Hydro</strong> facilities ready.<br />

Provide explanation if “No” has been checked for any item above.<br />

The undersigned do hereby declare that the Generator’s Substation is compatible for interconnection with the<br />

<strong>BC</strong> <strong>Hydro</strong> system for the purpose of operating as a load.<br />

________________________<br />

(Generator or Delegate)<br />

__________<br />

Date<br />

________________________<br />

(<strong>BC</strong> <strong>Hydro</strong> Field Coordinator)<br />

___________<br />

Revision Date: May 2010 47<br />