the initial total channel acquisition, with a probability of at least 0.99. If lock is not<br />

achieved within 10 seconds of loss of lock, an acquisition failure notification message<br />

will be sent to the MOC and the <strong>SN</strong> ground terminal will reinitiate the initial service<br />

acquisition process. Upon receipt of the loss-of-lock indications in the UPD, the<br />

customer MOC may request a TDRSS KaSA return service reacquisition GCMR (refer<br />

to Section 10). It is recommended that the customer MOC delay initiation of the GCMR<br />

for at least 35 seconds after initial receipt of the loss-of-lock indications in the UPD.<br />

8.3.3.5 Additional Service Restrictions<br />

a. Sun Interference. The TDRSS KaSA return service performance will not be<br />

guaranteed when the center of the sun is within 0.5 degrees of the TDRS KaSA<br />

receiving antenna boresight. Additionally, the TDRSS KaSA return service<br />

performance will not be guaranteed when the center of the sun is within 1<br />

degree of the boresight of the <strong>SN</strong> ground terminal receiving antenna supporting<br />

the TDRS.<br />

b. Mutual Interference. It is possible for mutual interference to exist between<br />

KaSA customer platforms operating with the same polarization and frequency.<br />

The <strong>SN</strong> can provide tools to assist customers in interference prediction and<br />

interference mitigation.<br />

8.3.4 Real-Time Configuration Changes<br />

Changes to the operating conditions or configuration of a TDRSS KaSA return service<br />

during a scheduled service support period are initiated by a GCMR from the customer<br />

MOC. The requested changes will be implemented within 35 seconds of receipt of the<br />

GCMR at the <strong>SN</strong> ground terminal. The MOC will be notified upon initiation of the<br />

requested changes via GCM. Additional information concerning <strong>SN</strong> ground terminal<br />

response times for GCMRs is provided in Section 10. Table 8-8 lists the KaSA return<br />

service real-time configuration changes and their effects on the return service.<br />

8.3.5 Autotrack/Signal Acquisition Scenarios<br />

The following acquisition scenario identifies only the technical aspects of TDRSS KaSA<br />

return service autotrack (if enabled) and signal acquisition by the <strong>SN</strong> ground terminal<br />

and does not include operational procedures related to acquisition. Acquisition is<br />

dependent upon the customer providing an ephemeris with a maximum epoch<br />

uncertainty as defined in Table 8-7.<br />

Revision 10 8-28 450-<strong>SN</strong>UG