02.04.2013 Views

SN User's Guide - ESC Home - NASA

SN User's Guide - ESC Home - NASA

SN User's Guide - ESC Home - NASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revision 10 10-37 450-<strong>SN</strong>UG<br />

Message ID Message<br />

Type/<br />

Class<br />

OPM 03<br />

Customer<br />

Reconfiguration<br />

Request<br />

OPM 04<br />

Forward Link<br />

Sweep Request<br />

Table 10-12. Real-time Message Flow Between the NCCDS and the GTs (cont’d)<br />

Message Length and<br />

Operational<br />

Characteristics<br />

Message<br />

Generation<br />

Frequency<br />

Message Generation<br />

Conditions<br />

Messages from the NCCDS to the GTs (cont’d)<br />

03/03 Real-time control message A MOCC transmits a TDRSS<br />

reconfiguration request to the<br />

GT, via a GCMR to the<br />

NCCDS, if there is a need to<br />

reconfigure the GT and TDRS<br />

equipment supporting its<br />

customer platform<br />

03/04 Real-time control message Used as an acquisition aid<br />

when customer platform<br />

receiver acquisition failure is<br />

suspected because customer<br />

platform receiver frequency<br />

differs from expected values.<br />

Used in both initial and<br />

reacquisition situations. OPM-<br />

04 is also used for nominal<br />

Preventive Maintenance (PM)<br />

mode sweep initiation and<br />

termination.<br />

Required Processing Destination System Response<br />

NCCDS reformats and<br />

validates the MOCC<br />

reconfiguration request<br />

(98/04) and transmits an<br />

OPM (03/03) to GT<br />

NCCDS responds to a GCM<br />

from a MOCC with GCM<br />

status (98/01) and GCM<br />

disposition (98/02)<br />

messages<br />

The GT verifies and<br />

validates the OPM and<br />

processes and implements<br />

the OPM if legal<br />

NCCDS reformats and<br />

validates the MOCCgenerated<br />

forward link<br />

sweep request (98/05) and<br />

transmits an OPM (03/04) to<br />

the GT<br />

The GT verifies and<br />

validates the OPM and<br />

initiates the forward link<br />

sweep process<br />

The GT response time is up to 35<br />

seconds of OPM receipt and<br />

acceptance for all services<br />

The GT will respond to the OPM<br />

03 with an OPM 62 after<br />

successful completion of the<br />

reconfiguration or a message<br />

rejection if the message is<br />

incomplete or invalid<br />

The GT initiates the forward link<br />

sweep within 10 seconds of OPM<br />

receipt and acceptance<br />

The GT will respond to the OPM<br />

04 with an OPM 62 confirming<br />

that the sweep has started or a<br />

message is incomplete or invalid

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!