Table 10-9. Real-time Operations Activities Overview for FDF and NI<strong>SN</strong><br />

Functional<br />

Responsibility<br />

FDF Processing of tracking data 1. Receiving and<br />

processing real-time TDMs<br />

from GTs<br />

Generating orbit and<br />

ephemeris data<br />

Activity Description Applicable Timeline<br />

2. Generating and<br />

transmitting real-time state<br />

vectors<br />

NI<strong>SN</strong> Routing data/messages 1. Performing data-driven<br />

configuration and<br />

reconfiguration of the<br />

communications channels<br />

as needed<br />

System<br />

Element<br />

1. During the scheduled<br />

tracking period<br />

2. When the transmitted<br />

state vectors have epoch<br />

time deterioration which<br />

exceed the S-band and Kuband<br />

service required<br />

values<br />

1. During the duration of<br />

customer real-time<br />

operations<br />

Table 10-10. Real-time Operations Activities Overview for GTs<br />

Functional<br />

Responsibility<br />

GTs Providing TDRSS<br />

forward, return,<br />

and tracking<br />

services to<br />

customers<br />

Interfacing a<br />

TDRS with<br />

customer<br />

platform based<br />

upon specified<br />

RF<br />

characteristics<br />

Responding to<br />

NCCDS's<br />

administrative<br />

command and<br />

coordination<br />

Activity Description Applicable Timeline<br />

Prior to the Real-Time Service:<br />

1. Processing the received SHOs<br />

from the NCCDS, including:<br />

a. Performing syntax checking<br />

b. Reserving the required<br />

equipment<br />

1. Any time from 10<br />

minutes to 48 hours before<br />

service start time<br />

2. Performing Pre Service Test 2. Up to three minutes<br />

prior to service start.<br />

3. Processing of the NCCDSsupplied<br />

state vectors<br />

4. Generating the TDRS antenna<br />

pointing angles (i.e., look angles) and<br />

range dynamics data<br />

5. Generating commands to<br />

configure the ground equipment and<br />

the TDRS<br />

6. Acquiring TDRS antenna:<br />

positioning the scheduled TDRS SA<br />

antenna boresight toward the<br />

scheduled customer platform<br />

3. Prior to start of service<br />

4. At about 6 minutes prior<br />

to service start time<br />

5. At about 1-2 minutes<br />

prior to service start time<br />

6. Two to 5 minutes prior<br />

to the service start time in<br />

an SA service SHO<br />

Revision 10 10-27 450-<strong>SN</strong>UG