01.05.2013 Views

Dashboards and Widgets Creation Guide - MicroStrategy

Dashboards and Widgets Creation Guide - MicroStrategy

Dashboards and Widgets Creation Guide - MicroStrategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Dashboards</strong> <strong>and</strong> <strong>Widgets</strong> <strong>Creation</strong> <strong>Guide</strong> Dashboard Tutorial A<br />

Creating a Bubble Graph widget<br />

As with creating the other widgets for this dashboard, you must first create a<br />

Grid/Graph <strong>and</strong> then turn it into a widget.<br />

A Bubble Graph widget must have at least one attribute on the rows of the<br />

Grid/Graph <strong>and</strong> three metrics on the columns. These metrics are displayed<br />

along the X-axis, Y-axis, <strong>and</strong> Z-axis (the size of the bubble) of the widget, in<br />

order from left to right. In this widget, the X-axis is the Profit per Employee<br />

metric, the Y-axis is the Revenue per Employee metric, <strong>and</strong> the Z-axis is the<br />

Units Sold metric.<br />

To display a different color bubble (series) for each attribute element on the<br />

bubble graph, an attribute is placed above the three metrics on the columns.<br />

In this widget, that attribute is Year. For an in-depth explanation of the<br />

different objects on the widget, see Creating an Interactive Bubble Graph<br />

widget, page 243.<br />

To enable drilling on the bubble graph, an attribute must be placed to the<br />

right of the attribute in the rows. This attribute must be a child of the<br />

attribute already on the rows. The custom group you created in Creating a<br />

custom group, page 403 provides the correct structure for this attribute. For<br />

detailed information on this requirement, with an example, see Supporting<br />

drilling using a custom group, page 245.<br />

To create a Bubble Graph widget<br />

1 Create an empty Grid/Graph by selecting Grid from the Insert menu.<br />

When you move the cursor to the Layout area, the pointer becomes<br />

crosshairs.<br />

2 Click <strong>and</strong> drag in the panel stack to add the Grid/Graph. Do not worry<br />

about the size or position; you will adjust them later.<br />

3 Drag the following objects from the Datasets pane to the row axis of the<br />

Grid/Graph:<br />

• Month of Year<br />

• Region<br />

• Call Center CG<br />

4 Drag the following objects from the Datasets pane to the column axis of<br />

the Grid/Graph:<br />

© 2012 <strong>MicroStrategy</strong>, Inc. Creating the Employee Performance panel 409

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!