<strong>Report</strong> of the Board of Management<br />

Trials with the pile upending and guidance tool for the installation of<br />

mono-pile foundations for wind turbines<br />

a record time of four months, and thirty mono-pile<br />

foundations for the Barrows offshore windfarm project<br />

were successfully installed with the tool in the second half<br />

of <strong>2005</strong>;<br />

• in conjunction with the basic design package for the four<br />

jack-up drilling rigs for Maersk Contractors, KeppelFels<br />

ordered from MSC the supply of four sets of the patented<br />

skidding and fixation systems for the jack-ups.<br />

<strong>Offshore</strong> Contracting and After Sales Services<br />

<strong>2005</strong> has been an extremely busy year with execution of a<br />

large variety of orders in all areas of activity including offshore<br />

contracting, system overhauls and spare part supplies.<br />

<strong>Offshore</strong> Contracting<br />

Both <strong>SBM</strong>’s ‘Dynamic Installer’ and the ‘Normand Progress’,<br />

under charter from Solstad until September <strong>2005</strong>, were fully<br />

occupied with installation work related to several of the<br />

turnkey supply and install contracts and a series of<br />

contracting jobs for third parties.<br />

The ‘in house’ work included:<br />

• hook-up of the Sanha LPG FPSO offshore Angola;<br />

• miscellaneous sub sea installation work in the Bonga field<br />

for Shell Nigeria;<br />

28<br />

• installation of the CALM and CBM terminal for Trafigura,<br />

Tema, Ghana;<br />

• installation of a CALM type barge mooring for BMT Marine<br />

in the Mediterranean offshore France.<br />

The main ‘third party’ contracts covered:<br />

• sub sea pipeline repair work, and other saturation diving<br />

activities, for Total offshore Angola and Congo;<br />

• installation of sub sea spool pieces for ExxonMobil in the<br />

Yoho field, Nigeria;<br />

• deepwater installation works in relation to the deployment<br />

of an FPSO on the Baobab field operated by Canadian<br />

National Resources, Ivory Coast;<br />

• replacement of sub sea hoses at the Amenam terminal of<br />

Total, Nigeria;<br />

• installation of I-tubes on the Girassol FPSO for the tie-back<br />

of the Rosa field;<br />

• sub sea tie-back work to the FPSO of Vaalco offshore<br />

Gabon;<br />

• sub sea repair work for Marathon Equatorial Guinea at the<br />

Alba LPG terminal;<br />

• saturation diving works for the revamping of the Palanca<br />

terminal of Total, Angola;<br />

• provision of diving support for the FPSO installation at the<br />

Okwori field for Addax, Nigeria;<br />

• cable laying for ENI in the Djambala field offshore Congo.<br />

System Overhauls<br />

• overhaul of a CALM system for BMT Marine in France;<br />

• overhaul of the first disconnectable turret mooring<br />

supplied in 1985 to ACT for the mooring of the FPSO ‘Nan<br />

Hai Fa Xian’ offshore China;<br />

Tie-in of the floating hose string during the installation of a<br />

CALM terminal