24<br />

Instructions for the installer<br />

3.15 - WATER TREATMENT<br />

The chemical/physical features of the heating system’s water<br />

are fundamental for the boiler’s correct operation and safety.<br />

Among the inconvenients caused by the bad quality of the<br />

feeding water, the most frequent and the most serious is the<br />

incrustation of the boiler thermal exchange surfaces.<br />

Less frequent, but also serious, is the hydraulic circuit<br />

surfaces.<br />

It is ascertained that the boiler incrustations, due to their low<br />

thermal conductivity, highly reduce the thermal exchange, even<br />

if with a thickness of some millimetres and provoque a very<br />

dangerous localised overheating.<br />

We suggest to make the water treatment of the heating circuit<br />

in the following cases:<br />

a) When the hardness of the water is higher than 15°f;<br />

b) For C.H. installations with large water content;<br />

c) Renewal of the water system due to uncontrolled leakages;<br />

d) Subsequent refilling of the system due to maintenance<br />

works on the installation;<br />

e) Presence of different metals in the hydraulic circuit.<br />

The scope of this treatment is finalized for eliminating or<br />

substantially reducing the following problems:<br />

- lime scale deposit<br />

- corrosion sludge<br />

- deposits<br />

- microbiological growths (moulds, bacteria etc.)<br />

An appropriate treatment of the supply water will prevent<br />

the above stated problems and will maintain the correct<br />

operation and efficiency of the generator in time.<br />

For this purpose it will be necessary to fix the following<br />

chemical-physical characteristics of the water:<br />

PH include between 6,5 and 8<br />

Hardness 15° FR<br />

Therefore, before filling the heating system it will<br />

be necessary to fit the devices indicated in the<br />

figure.<br />

THE <strong>INST</strong>ALLATION MUST BE FORESEEN ON THE RETURN<br />

PIPE OF THE PRIMARY CIRCUIT DOWNSTREAM OF THE<br />

CIRCULATING PUMP.<br />

All necessary precautions must be taken for preventing the<br />

formation and localization of oxygen in the system’s water.<br />

For this reason, ensure yourself that the plastic piping used<br />

in underfloor heating systems is impermeable to oxygen.<br />

If any anti-freeze solutions are used ensure that they are<br />

compatible with aluminium and any other boiler<br />

components and materials.<br />

EXAMPLE OF SCALE REDUCING DEVICE CONNECTION FOR WATER TREATMENT<br />

1 BALL VALVE<br />

2 INSPECTION POCKET<br />

3 FILLING MANIFOLD<br />

4 DISCONNECTOR<br />

5 SCALE REDUCING DEVICE<br />

6 LITER COUNTER (Recommended)<br />

7 Y filter<br />

WARNING!<br />

Any damage caused to the boiler due to the<br />

formation of lime scale or by corrosive water<br />

will not be covered by the warranty.<br />