01.07.2013 Views

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

XXIX ESC General Assembly, Sept. 12-17, 2004 - GFZ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Head of the Potsdam seismic station between 1902 and 1909 and<br />

responsible for the station bulletin.<br />

• Equipping the station with his own<br />

improved 2-component horizontal<br />

pendulum with air attenuation →<br />

HECKER-modified Rebeur-Paschwitz pendulum<br />

in use at POT station from 1902-14.<br />

• and with the <strong>12</strong>00 kg astatic 2-component<br />

← horizontal WIECHERT-pendulum,<br />

operating at station POT from 1903-54<br />

Peter Bormann <strong>XXIX</strong> <strong>ESC</strong> <strong>General</strong> <strong>Assembly</strong>, <strong>Sept</strong>. <strong>12</strong>-<strong>17</strong>, <strong>2004</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!